Step Picture Task Code and Task Description Twisting: Pilin Awal/putaran/akhir Atau Awal/akhir Kaki
Step Picture Task Code and Task Description Twisting: Pilin Awal/putaran/akhir Atau Awal/akhir Kaki
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
1 Twisting
Twist the start/loop/end or start/end leads
altogether 3 times close to the coil body to
create a junction.
Note: Please using finger coat during twisting
to prevent oxidation on wires. Please using
powder during twisting to ease the twisting
process.
2 Twisting
Twist each individual lead till the end.
LOCKED
LOCKED
Give each lead about three twists. Do not
overtwist. Overtwisting will break wire
insulation &/or wires.
Note: Please using finger coat during twisting
to prevent oxidation on wires. Please using
powder during twisting to ease the twisting
process.
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 1 of 6
template: FTM-A0C0A LOCKED
Locked EDM checkout 2023-FEB-16
LOCKED
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
3 Cutting
Cut the wire to required length and tin it.
Wire Length Tin Wire Set Ref.
(mm) (mm) Type Tinning
Profile
L1.1 20 3 30x50um 400degC, 77-0101..
AB15 3 sec
(start
wire)
L1.2 20 3 30x50um 400degC, 77-0101..
AB15 3 sec
(end
wire)
LOCKED
(kawat
akhir)
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 2 of 6
template: FTM-A0C0A LOCKED
Locked EDM checkout 2023-FEB-16
LOCKED
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
5 Gluing
Flip the coil bonding surface on top.
Hold the coil at an angle between 0° and
75° relative to the ground.
Note: ATTENTION! Correct bonding surface
refer to 56-0114.. .
6 Gluing
Hold the needle at an angle between 45°
and 90° relative to the coil bonding surface
Possible needle gauge to use: 25G (Red) &
21G (Purple)
Note: Glue using #103623, CHM GLUE
LOCTITE 460 GG
LOCKED
LOCKED
Tahan jarum pada sudut antara 45° dan 90°
relatif terhadap permukaan perekatan koil
Kemungkinan ukuran jarum yang
digunakan: 25G (Red) & 21G (Purple)
Catatan: Lem menggunakan #103623, CHM
GLUE LOCTITE 460 GG
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 3 of 6
template: FTM-A0C0A LOCKED
Locked EDM checkout 2023-FEB-16
LOCKED
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
7 Gluing
Dispense glue on the bonding surface
around the coil circumference - between 2
blue circles
Note:
Large coil (inner diameter ≥4.1mm): apply
2 – 2.5 round of glue.
Small coil (inner diameter ≤4.1mm): apply
1 – 1.5 round of glue
REQUIREMENT:
Glue must cover ≥ 90% bonding surface
Glue thickness:
≤ 0.4mm (large coil)
≤ 0.2mm (small coil)
LOCKED
Koil besar (diameter dalam ≥4.1mm):
oleskan 2 – 2.5 putaran dari lem.
Koil kecil (diameter dalam ≤4.1mm):
oleskan 1 – 1.5 putaran dari lem
KEHARUSAN:
Lem harus menutupi ≥ 90% permukaan
perekatan
Ketebalan Lem:
≤ 0.4mm (koil besar)
≤ 0.2mm (koil kecil)
8 Gluing
Flip the coil system by 180° so the bonding
surface faces down.
Insert coil into the center of core-pot
Note:
REQUIREMENT:
Ensure coil top surface is lower than corepot
and coil sits flat to the bottom of core-pot as
much as possible
KEHARUSAN:
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 4 of 6
template: FTM-A0C0A LOCKED
Locked EDM checkout 2023-FEB-16
LOCKED
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
9 Gluing
Immediately press the coil for 3-5 second
LOCKED
LOCKED
Segera tekan koil 3-5 detik
10 Gluing
And then leave it until 20-30 second before
next process
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 5 of 6
template: FTM-A0C0A LOCKED
Locked EDM checkout 2023-FEB-16
LOCKED
Step Picture [Ratio 4:3, Size W=3.25”] Task code and Task Description
10 Assembly Tape
Paste the tape (refer to part list) around the
core-pot, flush to sensing face
Solder the tape joint
11 Assembly Wire
Solder the wire (refer to part list) to the tape
joint
LOCKED
CONFIDENTIAL acc. to ISO 16016 Only valid as long as released in EDM or with a valid production documentation! scale: 1:1 date: 2018-May-28
Production Instruction respons.
approved
307-1568A
Bintan COSYS Instruction norm sheet 6 of 6