You are on page 1of 2

TITLE :- B.O.M FOR P.E.

B SHED AT BONGAOON
SLNO. DESCRIPTION L(m) W(m) H(m) U/W NO.
1 PEB PORTAL AS PER STAAD OUTPUT 33202 1 1 1 1
2 SHEETING
ROOF SHEETING (300mm PROJECTION) 47.1 21.3 1 4.53 2
SIDE SHEETING (UPTO EAVES) 179 5 1 4.22 1
SIDE SHEETING (EAVES TO RIDGE) 42.395 2.034 0.5 4.22 2
CANOPY SHEETING BAY 23.85 5.1 1 4.53 2
CANOPY SHEETING GABLE 21.496 5.1 1 4.53 1
3 PURLIN Z 150X60X20X2 @ 1.5m C/C
ROOF PURLIN 47.1 1 1 4.6 30
SIDE PURLIN 179 1 1 4.6 4.5
CANOPY PURLIN 23.85 1 1 4.6 8
21.496 1 1 4.6 4
ANGLES 100X100X3.15 0.2 1 1 4.78 258
4 CONNECTIONS
BASE PLATE
500X300X25 0.5 0.3 0.025 7850 21
450X250X16 0.45 0.25 0.016 7850 8
CAP PLATE FOR GABLE COLUMNS
450X250X16 0.45 0.25 0.016 7850 8
END PLATE
400X550X16 0.4 0.55 0.016 7850 112
5 FOUNDATION BOLTS
1200mm M25 FOUNDATION J BOLT 10.6 GR 1.2 1 1 3.85 216
FACTOR UNIT QUANTITY
1.02 KG 33866.04

1.15 KG 10452.6534
1.15 KG 4343.435
1.15 KG 418.481
1.15 KG 1267.31507
1.15 KG 571.115401

1.1 KG 7149.78
1.1 KG 4075.83
1.1 KG 965.448
1.1 KG 435.07904
1 KG 246.648

1 KG 618.1875
1 KG 113.04

1 KG 113.04

1 KG 3094.784

1 KG 997.92
68728.7965