Date of Inspection
TATA STEEL DOWNSTREAM PRODUCTS LIMITED, 33B, Industrial Area, NIT, Faridabad-
TSDPL Faridabad
121001(Haryana).
TATA STEEL DOWNSTREAM PRODUCTS LIMITED. B- 18, MIDC Growth Centre, Ranjangaon
TSDPL Pune
Taluka, Shirur, Pune- 412220
Allied Unit 2 Allied Hitech Industries Pvt Lts ( Unit -II ) , Plot No. 10, Industrial Area, NIT Faridabad – 121001
Allied Hitech Industries Pvt. Ltd Plot No.I-9, FIT Sector-57, Ballabgarh, Faridabad-121004
Allied, Ballabgarh Unit 7 (Haryana)
Pos-Hyudai Steel Mfg. (I) Pvt Ltd. F-70, SIPCOT Industrial Park, Irungattukottai, Sriperumbudur,
Pos-Hyudai Steel Mfg. (I) Pvt Ltd.
Taluk, Kancheepuram District, Tamilnadu- 602117.
Posh Metal Industries Pvt Ltd. Gat No. 50, Near GKW Ltd, Village: Pimple Jagtap, Off Chakan
Posh Metal- Pune Shikrapur Road Highway, Near Bharat Gas Plant, Shikrapur, Tal. Shirur, Dist Pune - 412208.
Maharashtra
JCAPCPL-BLR SY, c/o Tata Steel stockyard, Bangalore, Channasandra Ring Road, Doorvaninagar
Bangalore Stockyard
Post, Ramamurthynagar, Bangalore - 560016
C/O Swetal Enterprise ,Mahalgaon, Pardhi Petrol Pump,16 KM Stone, Bhandara Road, Nagpur -
Nagpur Stockyard
440008.
C/O Continental Warehousing Corporation, Nhava Seva Limited, Near Nirma Factory, Taluka
Ahmedabad Stockyard
Viramgam, Village Sachana
Faridabad Stockyard 33A & B, Bata Hardware Road, Industrial Area, NIT, Faridabad, Haryana – 121001.
Contact Details
Category Manager (mjunction) Shubhrajyoti de : 9163348107
Auction Related Shahid Imam: 8873002755
PSMS (mjunction) mj.jcap@mjunction.in
Lot Confirmation related 033-44091849 / 44091789 / 8336033395
Money Receipt Section/Payment Related: 033-44091807 / 8336988819 / 8336033395
Delivery Order Related 033-44091806 / 8336988814
Material Value Refund Related 8336925997
TCS Related 033-44091849 / 44091789 / 66106326 / 8336033395
Payment Deviation/Disablement in JCAPCPL Auctions 033-66031759 / 44091882 / 8336993678
Collection of Delivery Order- JCAPCPL-Jamshedpur 0657-6519985 / 7033098848
E Mail for any issue related to PSMS mj.jcap@mjunction.in
For time bound resolution of unresolved issues log into our customer care portal Type in www.metaljunction.com> Go to "Important Links" > Click on "Customer Complaints">
Log in with your user id and password and write the details of issue.
For any issue of PSMS at mjunction Avijit Bose - 8336033395
For Any unresolved Issues at mjunction for PSMS Anamul Haque (9163348182) anamul.haque@mjunction.in
For Any Issues at mjunction Shahid Imam (8873002755) - shahid.imam@mjunction.in
For Any unresolved Issues at mjunction Anup Chand Lal - anup.lal@mjunction.in
For any unresolved issues at JCAPCPL SPC’s: ( Lot availability, SKU Partha Biswas, partha.biswas@jcapcpl.com
replacement etc. Ashlesha Ashwini, ashlesha.ashwini@jcapcpl.com
Contact person for Inspection and delivery of Material Related issue at different location
TSDPL Jamshedpur Balwant Pandey- 9905160302
TSDPL Faridabad Arup Mohanty- 9015144198
TSDPL Pune Rajendra shelar- 9623451123
Allied Hi Tech(UNIT - 7), Ballabgarh Ajeet- 8076343249
Allied Unit 3 - Gurugram ,Haryana Rahul- 8586977616
Kumaravel- 9841369256
Pos-Hyudai Steel Mfg. (I) Pvt Ltd.
Posh Metal- Pune Akhilesh : 9867006706
Prithla Stockyard-CA
Amit Jha- 8178591379
HYUNDAI STEEL CORPORATION_Sriperumbudur
NAVEEN KUMAR - 9171341186
Bangalore Stockyard Bhaskar : 9060829128
Chennai Stockyard Samir Mukherjee :9677255744
Swetal Enterprises - Nagpur CA Amit- 9881900584
Ahmedabad Stockyard Ritesh : 7573016724
Faridabad Stockyard Sudipta Dutta :8510030099
Region CCO Coordinator Phone no. Email ID CCO Location Phone no. Email ID
JCAP/TSDPL_FBD/2007/12 6425 614 Rejected & Scrap CR Trims (YANKEE 1 UNIT = 35 MT ) 140 MT YANKEE
JCAP/TSDPL_FBD/2007/13 6425 672 Rejected & Scrap CRCA Cut Ends (YANKEE 1 UNIT = 35 MT ) 140 MT YANKEE
JCAP/TSDPL_FBD/2007/14 6425 685 Rejected & Scrap Pup Coils (YANKEE 1 UNIT = 50 MT ) 200 MT YANKEE
JCAP/TSDPL_FBD/2007/15 6425 2633 Rejected & Scrap CRCA Off Cuts (YANKEE 1 UNIT = 35 MT ) 140 MT YANKEE
Material List - TSDPL_PUNE
Arising for a
LOT NO. Plant Material No Material Description UOM Auction Type
month
JCAP/TSDPL_PUNE/2007/16 6424 614 Rejected & Scrap CR Trims 50 MT ENGLISH NO TIES
JCAP/TSDPL_PUNE/2007/17 6424 672 Rejected & Scrap CRCA Cut Ends 50 MT ENGLISH NO TIES
JCAP/TSDPL_PUNE/2007/18 6424 685 Rejected & Scrap Pup Coils (YANKEE 1 UNIT = 35 MT ) 70 MT YANKEE
JCAP/HSI/2007/24 6438 2633 Rejected & Scrap CRCA Off Cuts (YANKEE 1 UNIT = 50 MT ) 500 MT YANKEE
Payment and Lifting schedule
LOT DETAILS PAYMENT SCHEDULE LIFTING SCHEDULE(No. of working days from the next date of Delivery Order)
Note: Lot Validity – Validity days to be considered of 30 days closure from release of First DO. (As auction is on Arising Basis)
JCAPCPL can cancel any auction & no complaints by anyone will be consider in whomsoever level.
JCAPCPL would accept material value payments through online payment mode only
Regarding non availability of Material – 3 days advance information will be communicated
1. Requirements of participation:
1.1 Registration: Before participation in the e-Auction, a prospective bidder shall be required to get registered with mjunction services limited. For
details visit
www.auction.metaljunction.com
1.2 Security Deposit: Non-Interest bearing security deposit of Rs. 50000 (Rupees Fifty Thousand only) has to be deposited.
: Details as under:
*All the customers will have a unique account number. The unique account number is an alpha numeric code consisting of 13
characters. The Customer’s unique “account number” is a combination of the MJ’ SAP code along with the 7 digit bidder SAP ID
and can be used as reference for all subsequent transactions. The Customer’s Account Number detail is available in “Profile” after
the customer logs into our website using the user id and password.
2. Customers are advised to ensure that they inspect the materials on offer on the scheduled date as mentioned in the catalogue,
before participating in the auction. It is retreated that all materials are offer / sold by JCAPCPL on “AS-IS-WHERE-IS” and “NO-
COMPLAINTS” basis, and no complaint what so ever shall be entertained
regarding the quality of materials after the sale.
3. Bidding modalities:
3.1 Price Bid Basis: In Indian rupees as per unit of measurement as given in Material List.
3.2 Bid Increment : Rs.100/- ( Rupees Hundred only)
3.3 All the prices shall be quoted in Rs./MT basis (ex-Location basic exclusive of all taxes.).
3.4 Type of Auction: As mention in material list.
3.5 Bid Validity: Bid shall be valid for six working days from next date of auction.
4.3. Any change in taxes and levies applicable at the time of lifting shall be applicable.
4.4. It is the responsibility of the buyer to furnish the valid GST no. & necessary documents to Mjunction before participating in the auction. In case during the
transactions, it is found that valid GST no. has not been provided, then all necessary liabilities if any & so accrued would be on account of the buyer. JCAPCPL
& Mjunction would not be responsible for any such liabilities.
4.5. Applicability of TDS u/s 194O in Sales through E-Auction Platform. TDS u/s 194O:
Category Scrap:-
1. This transaction falls u/s 206C (1). Hence Section 194Q will not be applicable.
2. Compliance in relation to section 206AB (Furnishing of I.T Return for past 2 Years) will be taken directly from Income Tax Portal till 28th June-2021. If any
compliance made in IT Portal by the customer after 28th June-21, then it shall be communicated to Metal Junction over mail. In case of non-compliance as per
section 206AB of Income Tax Act 1961, higher rate of TCS @ 5% will be charged during invoicing.
3. W.e.f 1st of July 2021, invoicing will be done as per new Income Tax provision.
4. Form 27C & Form 27G shall become inoperative & higher rate of TCS shall be charged, if the customer defaults u/s 206AB of Income Tax Act 1961.
1. This transaction falls u/s 194Q/206(1H) depending upon the customer`s previous year turnover
2. Customer has to ensure deduction of TDS u/s 194Q at their end (if applicable). JCAPCPL shall not be responsible for any non-compliance at customer end.
3. To avoid administrative difficulties, the buyer is required to pay full amount against the purchase; and the amount for TDS u/s 194Q shall be paid separately
to the Government. The TDS shall be treated as security deposit with JCAPCPL and on submission of TDS certificate the same can be refunded/adjusted
against future purchases. Illustration showing TDS amount payable.
Refer the below example for TDS computation assuming the sales has crossed the minimum threshold limit
Example:-
Amount Paid to JCAPCPL
TDS PAYABLE = ---------------------------------- X 0.10%
(100% - 0.10%)
4. In case the buyer has not submitted the declaration w.r.t turnover prior to the date of auction, then JCAPCPL will assume the turnover to be <10 Cr & TCS
@ 0.1% will be collected accordingly during invoicing.
5. Compliance in relation to section 206AB (Furnishing of I.T Return for past 2 Years) will be taken directly from Income Tax Portal till 28th June-2021. If any
compliance made in IT Portal by the customer after 28th June-21, then it shall be communicated to Metal Junction over mail. In case of non-compliance as per
section 206AB of Income Tax Act 1961, higher rate of TCS @ 5% will be charged during invoicing.
6. W.e.f 1st of July 2021, invoicing will be done as per new Income Tax provisions
IMPLEMENTATION OF TAX COLLECTED AT SOURCE (TCS) ON SALE OF GOODS WITH EFFECT FROM October 1, 2020
Finance Act 2020 introduced a new Section 206C (1H) for extending the scope of Tax Collected at Source (TCS) on sale of any Goods with effect from 1st of
October 2020. Hitherto, TCS was only applicable on sale of certain specific category of goods e.g., Scrap, Coal etc.
The salient features of section 206C(1H) are briefly enumerated below-
1. With effect from 1st April 2021, TCS on sales will be as follows:-
TCS on Scraps @ 1%
TCS on other goods @ 0.1%
2. In view of above, to facilitate the dispatches buyer are requested to pay the excess amount for the balance quantity or confirm the adjustment in quantity
within the deposited amount.
3. TCS shall be collected on the consideration in excess of Rs. 50 Lakhs in a financial year.
4. TCS shall not be collected under this section, if it is covered by any other provision of TCS/TDS under Income Tax Act. For example – TCS on Coal, Scrap.
In view of above amendment TCS component will be incorporated in all our sales invoices and Debit notes after GST component i.e., TCS will be computed
on total invoice value inclusive of GST. You are requested to process payment of the Sales Invoice inclusive of the TCS component. Such TCS component
will appear in 26AS at the end of the quarter and necessary TCS Certificate as per Income Tax Act will be issued.
Note: In case of Scrap & Coal by product sales also (where the current provision of TCS @1% is applicable), TCS will be incorporated in the sales invoices &
Debit Notes.
Customers are required to submit Form 27C/Form 27G against the month of dispatch/expected dispatches. In the absence of Form 27C, TCS will
be charged at the time of invoicing.
•
5. Payment terms & conditions :
5.1 Payments: Payment shall be accepted only thru’ online mode.
6.3 Lifting with Ground Rent: Lifting with GR @ Rs. 1 per Rs.100 per day shall be allowed up to two (02) working days from the
last date of original validity period of the DO.
6.4 DO validity can be extended Only ONCE against each Delivery Order upto a maximum of 2 days from last date of original validity period of the
DO, subject to receipt of GR Payment through online mode before the expiry of original validity period of DO & validity would be extended after receipt of
Credit of the GR Payment. Kindly note that all Delivery Orders (DO) which meet the Lot Closure Norms shall be automatically closed within one day from
the date of expiry of original Delivery Order (DO) validity.
6.5 Loading shall be given strictly as per the statutory norms & safety norms. Given by JCAPCPL.
6.6 The Delivery Order shall be issued against one to one correspondence with Lot. The lifting to be done as per the DO issued. No
mixing of materials of different DO's allowed for lifting and invoicing process".
6.7 Buyers will be able to lift the material from stock yard based on DO No communicated by MJ .
6.8 Kindly note that material on auction might slightly vary in quantity post lot confirmation intimation and no detention charges
to be claimed if the Material Invoicing is stuck up due to ITS / SAP issue while vehicle is under loading inside Plant
6.9. If, for any reason, JCAPCPL is not able to give the material within twenty four (24) hours after the placement of vehicle then the buyer will
have the option to take refund of the unlifted quantity.
For all SPC batches (Slit coil / Secondary Batches) – Please consider the qty. for approval whose lot qty. will come less than -1 MT Request to
release such qty. when approval received from SPC Manager only with valid reasons only. it is applicable for slit coils/seconds batches &
applicable for SPC’s only .
“With effect from 1st July’16 it will be mandatory for all customer representatives to furnish the Original Police Verification document of their
customer representative obtained from the SSP’s office Jamshedpur along with other existing requisite documents to get the Delivery Orders from
Mjunction Office JSR”.
7. Penalties:
7.1 The following penalties shall be applicable in the eventuality of a buyer defaulting in making the payment as per the stipulated schedule for each
lot, in a financial year:-
Security Deposit will be forfeited & defaulting customer will be debarred from participation in future eAuctions for a period of 3 months
from the date of debarment.
7.2 In case of non- lifting of full lot quantity after making full payment, a penalty equivalent to 20% of the material value for the un-lifted quantity
against each lot shall be recovered from the customer.
7.3. For any E WAY Bill issue - customers/ transporters need to inform respective plant within 24 hrs only via official communication. If any
issue found after expiry of E way BILL validation, JCAPCPL or any Issued respective plant will not be responsible for any such lapses by
customers or their authorised transporters. For any vehicle issue /Indiscipline issue arises by Transporters/Drivers during Vehicle operation
in plant, For any such deviation/indiscipline behaviour found a penalty of Rs. 25000 (Rupees Ten Thousand only) will be imposed on the
customer & also debarment could be imposed for customers too.
Please note: If any vehicle loaded from more than approved qty in case of scrap material, as loading is done purely on eye estimation. Customers
have the option to pay upto +3 tonnes from more than approved lot for Invoicing purpose to avoid multiple loading/handling/unloading process. This
has to be done purely on Approval basis.
9. Refund: Refund will be processed on the basis of request letter having details of auctions, SO and material lifted post Lot Closure,.
If any on receipt of required documents (Original Copy) i.e. .Refund Request letter & cancelled cheque.
9.1 Refund would be process only when gross/cumulative refundable amount is equal to and more than Rs 500. Any refund below Rs 500 would
be hold back and would be processed only when gross/cumulative refundable amount is exceeds threshold limit of Rs 500 at any point of time. No
refund application would be submitted to F&A for refund amount below than Rs 500.
For any issue, Authorised Transporters supervisors to inform to dispatch office, if any unsafe incidents/action done by themselves only (
Transporter/ Authorised Supervisor/Drivers ) he is liable to get penalised as per safety mandates. Please note authorised supervisor of concerned
transporter is to come @ JCAPCPL with valid gate pass only & he has to be available along with drivers for all loading/weighment/vehicle
placement/ for maintaining & following safety standards /Collecting documents throughout the entire operation from entry to exit.
JCAPCPL reserves the right to track IP address, MAC number and geolocation of bidding customers whenever customers participate in any
auction on the mjunction auction platform for JCAPCPL.. Further, Customers are requested to install the necessary apps in the devices we use
for log in and bidding in mjunction auction platform to enable tracking of the MAC number and geolocation.
1. Only Sundays are excluded for counting purpose for payment schedule. Second and Fourth Saturday of month is excluded for counting
purpose of payment schedule as per notification of RBI.
2. All the material loaded in the vehicle is to be covered in order to follow the safety compliance circulated by TSL. If the mandatory safety
compliance is not followed then JCAPCPL can penalize the buyer/authorised representative as deemed fit.
3. Customer/ Transporter/Authorized Representative/ Lifters/Drivers are not allowed to take any photograph /Videos within
JCAPCPL EX WORKS /ALL JCAPCPL STOCKYARS’S & SPC’S Plant premises for any lifting of seconds/scrap materials. If anyone
found to do that a heavy penalty will be imposed & also debarment could be done.
Jurisdiction:
Any dispute arising out of any contract shall be decided in Jamshedpur by the courts in Jamshedpur and by no other courts. The courts in
Jamshedpur shall have exclusive jurisdiction to adjudicate upon any such dispute.
Assume that the total quantity available is 800 mt. and Bidders bid for certain quantity (in MT) at a certain price as illustrated in following table
(minimum bid quantity is assumed as 200 MT= 1 UNIT):
B 9.40 1 15000 1
F 9.39 2 14800 2
D 9.36 1 14800 0
A 9.32 1 14800 1
E 9.34 1 14800 0
C 9.30 2 14750 0
Explanation for the Allocation of Quantity
Bidder B is the highest bidder @ Rs.15000/MT, hence the system allocates his bided quantity i.e., 200 mt = 1 Unit
There are 4 bidders @ Rs.14800/Mt.
Since bidder F’s bid was for 400 MT ( 2 Unit ) (Highest at Rs.14800/MT) the system allocates his bid quantity in full.
Since bidder A placed his bid earlier than bidder D & bidder E i.e. 9.32 Hrs hence the software gives first preference to Bidder A
and allocates bidder A the available quantity ( i.e. 200 MT = 1 Unit) first.
Since, all the quantity is exhausted at higher bid price than Rs.14750/MT, therefore no quantity
STANDARD OPERATING PROCEDURES FOR CARRYING OUT OPERATION DURING AND AFTER COVID-19
LOCKDOWN
2. Introduction : This Guideline is prepared to carry out the operations during and
after the lockdown period due to COVID-19 outbreak. All precautionary measures need to be
ensured at JCAPCPL Plant/All Stockyard’s/ ALL SPC’s so that all Vendors / Suppliers
/Customers / Contract workers /Visitors/Transporters’/ Supervisors/ Driver’s representatives
etc. are safe and secure. By following this Guideline, the chain of corona spread shall be
effectively broken and normal Operation can be resumed safely.
Scope : This Guideline applies to the following areas within JCAPCPL Plant/All Stockyard’s/ ALL SPC’s
premises & also to following places @ respective plant:
a. Works Area
b. Canteen building
c. Truck/Trailer parking
d. All Loading Points @ respective plants/ Weighbridge
4. Preparedness:
5.1 Communication:
• Communication to all relevant customers & all external agencies on resumption.
• Communication to Customers considering all workplaces and common spaces for protection and
prevention awareness – Social Distancing and other precautionary measures as per mandated
guidelines.
• Advisories issued by MHA from time to time to be widely circulated & communicated to all
Customers/Authorized Transporters/Drivers to each loading Plant.
• Intensive communication and training on good hygiene practices shall be taken up by each customer
to their Authorized Transporters/Drivers as per MHA guideline time to time.
a) All vehicles and machinery entering the plant should be disinfected / sanitized.
1. PURPOSE: This Procedure provides the minimum mandatory required guidelines to establish & ensure effective
consequence management (Cost recovery) for contractors / whoever deals business directly or indirectly with JCAPCPL
2. SCOPE: This procedure covers all minor & major cost recovery as applicable to JCAPCPL
3. DEFINITION:
Minor Cost Recovery: - Cost recovery below one lakh and recovered against Safety rules & procedures violation.
The amount deducted under minor head will be nonrefundable.
Major Cost recovery: - Cost recovery above one lakh and recovered against major safety non-compliance which will
have potential to cause or caused fatal or serious injury or property damage or Lost Time Injury (LTI)
Unwanted /Unauthorized
movement inside the
5.1 plant.
g) Sleeping / taking rest near the gas drip pot & water seal inside the plant
i) Overstaying & doing some work for their personal benefit in the plant
Revised Rules, Regulations & procedures to deal with above (SL 5.1) non-compliance
Revised Rules, Regulations & procedures to deal with above (SL 5.3) non-compliance
Driving or Working
under the influence
plant
Block RFID for 30 working days CO/CA write to Sr. Manager Sr. Manager HRM
2nd Time
HRM & Sr. Manager Safety
Revised Rules, Regulations & procedures to deal with non-compliance to Safety standards within all Operation.
Minor Safety non-compliance that do not meet JCAPCPL safety norms which are specified below or similar reasons which are not specified
6. Safety procedure/rules
Starting Fatality / Serious injury Cost of Rs. 25,000/- (Rs.
potential job without adequate Twenty-five thousand will be
CO/CA write to Sr.
safety measures like Fire recovered from every such Sr. Manager
6.a Prevention / Protection, Rescue noncompliance
Manager HRM & Sr.
for Confined space, Fall HRM
Manager Safety
protection, Positive Isolation,
Guarding/Barricading.
*Consider to small vendor base at JCAPCPL, contractor administrator (CA) may propose a penalty (20,000/-) in lieu of suspension to
F&A.
** R1 to R8 mentioned in page no # 12
7.
Sl. Attributes on Non-Compliance Recommendations for
Action Execution
No. to Safety Standards execution
Any Contractor’s / Vendor’s/ Gate pass of the employee will Sr. Manager
CO/CA write to Sr.
Transporter’s/ Supplier’s
employee found working with be seized & A cost of HRM
Rs.10,000/- per Manager HRM, DDM
7.a different vendor without
noncompliance will be (F&A) & Sr. Manager
&
authorization from parent
recovered from the vendor Safety
vendor DDM (F&A)
who engaged for the work
Safety
Other Common Examples (illustrative & not exhaustive) of First aid / Fatal/Serious Injury potential/
“Unsafe Acts” for implementation of Life Saving Rules
Areas/Activities/Standards Unsafe Acts
a) Not wearing/utilising designated PPE that are required for the work/area Person not using Kool Coat while working with
PPE high power electrical equipment/ operating breaker or wherever it is made compulsory.
b)
a) Welding is done without connecting the return Earthing line from the same job to the welding machine
Welding & Gas Cutting b) Welding is performed without Earth Leakage Circuit Breaker (ELCB)
c) Gas cylinder hose / valve / torch condition w.r.t gas cylinder standard
a) Getting on or off the moving equipment/ Locomotive / trailer / truck Crossing the rail tracks under or in between the
wagons.
b)
Crossing under the barrier when closed.
c)
Working on rail tracks without work permit.
Rolling Stocks/ Rail Logistics d)
e) Not putting red flag during the reversing or movement of trailer / truck / wagon for safe movement.
a) Person working near gaseous area or gas line without use of appropriate gas detectors.
Gas Safety b) Person sleeping or taking rest near the drip pot or under the gas pipelines.
VI. Work permit found from *requester / taken by, instead of issuer
agency even though job has completed. (* for different agency)
c) Working inside confined space without clearance from competent person nominated by JCAPCPL
Reckless Endangerment a. Observed being engaged in horseplay & work practices that place employees or fellow workers at risk of injury
Electrical Safety a) Not followed the procedure of “Test before Touch” before working on any electrical conductor
Persons observed in following activities during Material Handling Working on or under a suspended load
Suspended loads left unattended
a)
Oblique pulling of material
b)
Hoisting systems c)
Moving Machinery a) Person found touching moving machine/equipment without being authorised by his superior.
a) Working without positive isolation for those jobs for which Energy isolation is required.
b) Red/ Blue Lock not put by the individual, even though the positive isolation with Yellow/Black locks has been done by
Positive Isolation the Equipment owning agency.
Any other specific Fatality/Serious Injury Potential Unsafe Act / not removing isolation lock after job completion declared by
Division/Dept
the Divisions or Department
Work Site not in order during the Cost of Rs. 10,000 (Rs. Ten CO/CA to write to ADM
job. Thousand) will be recovered DDM/DM
for every such noncompliance. Procurement & DDM
8.a
(F&A)
(F&A) with mark a copy to
Sr. Manager Safety
Work site not found in order after Cost of Rs. 10,000 (Rs. Ten CO/CA to write to ADM
the job has been completed i.e. Thousand) will be recovered for DDM/DM
Civil, Electrical, Mechanical every such non-compliance Procurement & DDM
8.b
maintenance and other jobs. (F&A)
(F&A) with mark a copy to
Sr. Manager Safety
Contractor's employee entering Cost of Rs. 1,000 (Rs. One CO/CA to write to ADM
without job/found idling inside Thousand) will be recovered DDM/DM
Works. per employee for every such Procurement & DDM
8.d
occurrence (F&A)
(F&A) with mark a copy to
Sr. Manager Safety
Not attending the first-aid station Cost of Rs. 10,000 (Rs. Ten CO/CA to write to ADM
(Within 30 minutes.) after the Thousand) will be recovered DDM/DM
injury. per employee for every such Procurement & DDM
8.e
occurrence (F&A)
(F&A) with mark a copy to
Sr. Manager Safety
*Consider to small vendor base at JCAPCPL, contractor administrator (CA) or Functional Head may propose a penalty (50,000/-) or
10% of workorder which ever higher in lieu of suspension
Minor Safety non-compliance that do not meet JCAPCPL safety norms which are specified below or similar reasons which are not specified
** Needs approval from CO/CA or concern HOD to Safety dept. through e mail.
Major safety non-compliance - Dangerous occurrence ( which has potential to become fatal / LTI or cause serious injury or in the event of death
11 of contractor labour arising out of a fatal accident or permanent total disablement) which are specified below or any other reasons which are not
specified.
This is applicable for order value less than or equal to Rs. 01 Cr.
Major non-compliance of safety a) 10% of the order value of CO/CA to write to ADM CFO
that has resulted in LTI / the vendor whose workmen
permanent disablement / a fatal has met with the accident Procurement & DDM
accident at the work site/ road,
(F&A) with mark a copy
caused due to negligence of the b) (50% of the annuity value -
to Sr. Manager Safety.
vendor or its employee or its as recovered from the vendor
agent or creating emergency as in 'a' above) / number of
situations resulting in serious active vendors - shall be
loss to company property or deducted from all active
production. vendors" for monthly payment
to victim family.
c) Contractor /Transporter/
Supplier (Who will be found
guilty during the enquiry)
should be suspended for a
minimum period of twelve
months (Block vendor code).
1. Vehicle dashing which has a) *Contractor /Transporter/ CO/CA to write to ADM Sr. Manager (HRM)
potential to result into fatal injury. Supplier should be suspended
for a minimum period of 03 Procurement & DDM
months every time and the job
2. Serious accident due to (F&A) with mark a copy
will be done, if any, at risk and
malfunction of brake or any other to Sr. Manager Safety.
cost of the party.
part of the vehicle.
11.b
4. Rolling of vehicle which has
potential to cause serious
damage/ accident due to
improper parking of the vehicle.
Vehicle forcibly entering the Cost of Rs.10,000 ( Rs. Ten CO/CA to write to ADM
manned / unmanned level Thousand ) will be recovered
Procurement & DDM DDM (F&A)
crossing despite stop signal. for every such non-compliance
12.b
(F&A) with mark a copy
Vehicle found moving in Cost of Rs. 5,000 ( Rs. Five
to Sr. Manager
restricted road/ wrong direction. Thousand ) will be recovered
Safety.
for every such non-compliance
High speed, wrong overtaking, Cost of Rs. 5,000 ( Rs. Five CO/CA to write to ADM
Wrong Parking on road, driver Thousand ) will be recovered
Procurement & DDM DDM (F&A)
talking on mobile while driving, for every such noncompliance).
person found sitting in material
(F&A) with mark a copy
body, Employee found sitting
to Sr. Manager Safety.
inside cabin without proper
permission, Not using seat belt,
12.c
not putting proper barricades
around break-down vehicle,
Crane movement in nonspecified
time, Vehicles, jumping the red
traffic light and any other non-
compliance of safe driving
norms.
Vehicle Dashing & damaging Cost of Rs. 25,000 ( Rs. CO/CA to write to ADM
any structure, lamp post Column, Twenty-Five Thousand) or
Procurement & DDM DDM (F&A)
height barrier, barricading, drop actual cost incurred by
gate, signal post road divider,
12.d JCAPCPL for damage caused (F&A) with mark a copy
roundabout, signage post etc.
to Sr. Manager Safety.
if any, whichever is higher, will
be recovered for every such
non-compliance
Repeated Road Safety Violators Vehicle gate pass to be sized *Head, Sec. Works (TSL) through Head workplace
of more than 3 times (within 12 and vehicle to be banned. safety (TSL)
months). Sr. Manager
12.e
Also, RFID card of the Safety Dept.
employee to be blocked for
entry in company premises
Driver absconding after any road An additional penalty of Rs. CO/CA to write to ADM
incident involving contractor’s 10,000/- (Rs. Ten Thousand)
Procurement & DDM DDM (F&A)
12.f vehicle. to be imposed on vendor.
*After receiving information (e – mail) from TSL Road Safety wing, the same to be communicated to Head, Sec. Works (TSL)
through Head workplace safety (TSL) for necessary action.
Major safety non-compliance - Dangerous occurrence ( which has potential to become fatal or cause serious injury or in the event of death of
13 contractor labour arising out of a fatal accident or permanent total disablement) which are specified below or any other reasons which are not
specified. This is applicable for order value more than Rs. 01 Cr.
Attributes 11.b (page 9) of non- 1.A cost of safety will be CA write to ADM CFO
compliances to safety retained by JCAPCPL, for 1st
standards. Non-Compliance as mentioned Procurement officer,
below (R1 to R4), and for 2nd
AGM (HRM) & DDM
Non-Compliance (within 12
(F&A) with mark a copy
Months) as mentioned below
to Sr. Manager Safety.
(R5 to R8). If there is no Major
Safety non-compliance
13.a /Dangerous occurrence within
one year from this incidence,
then 70% of the money will be
returned to the vendor and
30% amount of the penalty will
be retained by JCAPCPL.
Attributes 11.a (page 9) of non- a) "50% of the annuity value CA write to ADM CFO
compliances to safety will be deducted from the
standards. vendor whose workmen has Procurement officer,
met with the accident" for
13.b AGM (HRM) & DDM
monthly payment to victim
family under "SURAKSHA"
(F&A) with mark a copy
scheme of JCAPCPL / Tata
to Sr. Manager Safety.
Steel.
b) A cost of safety will be
retained by JCAPCPL, for 1st
Non-Compliance as mentioned
below (R1 to R4), and for 2nd
Non-Compliance
(within 12 Months) as
mentioned below (R5 to R8). If
there is no Major Safety
noncompliance /Dangerous
occurrence within one year
from this incidence then 70%
of the money will be returned
to the vendor and 30%
amount of the penalty will be
retained by JCAPCPL from
the Contractor /Transporter/
Supplier (Who will be found
guilty during the enquiry) .
Contractor /Transporter/ Supplier to be suspended for a minimum period of three months and every
1 < 1 Cr time the job will be done, if any, at risk and cost of the party.
Note:
1. Only MD has an authority to waive the cost recovery or suspension- fully or partially.
CO : Contractor Owner
CA : Contractor administrator
LTI : Lost time injury FAI : First aid injury
RFID : Radio Frequency Identification
H2 : Hydrogen area
N2 : Nitrogen area
COGD : Coke oven gas de sulphidization.
HOD : Head of the department
F&A : Finance & account
HRM : Human resource management
ADM : Assistance Divisional Manager
DDM : Deputy Divisional Manager