You are on page 1of 11

FYP B Progress Report

Name: Moontarij Jahan Orvy


ID:1001852221
Date:03-03-2023 (as incomplete file send previously)
Date:17-03-2023

FYP Title: Phytoremediation of heavy metals from wastewater by


ornamental plants

Week-8:
• Meeting with supervisor about showing calibration curve.
• Taking data for every 2 days of absorbance for both plants.
• Doing some research about the process dying on particular plants literature review .
• Taking data for every cod samples and pH, COD for both samples.
• Work on FYP A as per changes for chapter 2 And 3.

Week-9:
• Send all the data for until day 15th of the experiment to supervisor.( all the data attached
with excelsheet)
• Take the data for 18 th until today pH, COD and absorbance.
• Analysing physical observation of plant color change of leaves,roots,and also for dying
solution in the container.
• Observing about pH and COD value.
• Work on FYP A as per changes.
• taking concentration data from calibration curve of each container of samples.

Week-10:
• Take the data for 21 th until pH, COD and absorbance ( all the data attached with excel).
• Meet with supervisor for chapter 2 sub topic discussion.
• Analysing physical observation of plant color change of leaf,height and also for dying in
excelsheet.
• Work on FYP A Chapter 2 and 3 completed and already have shown to supervisor.

WEEK -11
• Meet with supervisor and show all the data until 21st day.
• Reading some journals as per format for chapter 4 graph.( refer all dr thung journals)
• Work on FYP A finalized chapter 2 and 3 as per changes.
• Start work on chapter 4.

Physical observation and color change for samples: (18TH DAY)

Plant A ( orange) Plant B ( orange)


Plant A ( methylene blue) Plant B ( methylene blue)

Plant figure :15 th day.


Plant B 21ST Day.(mb) Plant A 21ST Day.(mb)

Plant B 21ST Day.(Or) Plant A 21ST Day.(Or)

Plant A 21ST Day.(mb) Plant A 21ST Day.(Or)


Plant B 21ST Day.(mb) Plant B 21ST Day.(Or)

All the data attached to excel sheet:

PLANT B FOR BOTH SAMPLES GROWTH


40
35
30
25
20
15
10
5
0
plant plant plant plant plant plant plant plant plant plant plant
B0 b 6 b 12 b 15 b 21 B 0R b 3 b 6 b 12 b 15 b 21
MB MB MB MB OR OR OR OR OR

LEAF HEIGHT
PlANT A For Both Samples Growth
35
30
25
20
15
10
5
0
plant plant A plant A PLANT plant A plant A plant plant A plant A Plant plant A plant
A 0 6 MB 12 MB A 15 18 MB 21 MB A 0R 6 OR 12 OR A 15 18 OR A 21
MB OR OR

LEAF HEIGHT

COD AGAINST DAY 21


450
400
350
300
250
200
150
100
50
0
0 2 4 6 8 10 12 14 16 18 20 22

MB A MB B OR A OR B WW A WW B
0
50
100
150
200
250
300
350
400
450

6.65
6.7
6.75
6.8
6.85
6.9
0
MB 5PPM A
MB 10PPM B

2
OR 20 PPM A

MB A
WW PLANT A
MB 20PPM A

4
OR 5PPM A

4
OR 10PPM B

MB B
MB 5PPM A
MB 10PPM B

6
6
OR 20 PPM A
WW A

OR A
MB 20PPM A
8

9
OR 5PPM A
OR 10PPM B

PH VS DAY 15
MB 5PPM A
OR B
10

MB 10PPM B

11
COD AGAINTS DAY 15

OR 20 PPM A
WW A
12

MB 20PPM A
WW A

OR 5PPM A

13
OR 10PPM B
14

MB 5PPM A
MB 10PPM B

15
WW B

OR 20 PPM A
16

WW A
0
2
4
6
8
10
12
14
6.65
6.7
6.75
6.8
6.85
6.9

0
MB 5PPM A
MB 20PPM B

2
OR 10PPM B

MB 5 A
MB 10PPM A

4
4
OR 5PPM A
OR 20PPM B
MB 20PPM A

6
6

MB 10 A
OR 10PPM A
WW A

8
MB 5PPM B

9
OR 20 PPM A

10
WW B

MB 20 A
MB 10PPM B

DAYS
11
OR 5PPM B

12
MB 5PPM A
PH VS DAY 21

MB 20PPM B
13

OR 5 A
14
OR 10PPM B
MB 10PPM A

16
OR 5PPM A
15

OR 20PPM B

OR 10 A
MB 20PPM A

18
18

OR 10PPM A
METHYLENE BLUE AND ORANGE PLANT A 21

WW A

20
MB 5PPM B
21

OR 20 PPM A

OR 20 A
22
WW B
METHYLENE BLUE AND ORANGE PLANT A
14

12

10

0
2 4 6 9 11 13 15 18 21

MB 5 A MB 10 A MB 20 A OR 5 A OR 10 A OR 20 A
PLANT B METHYLENE BLUE AND
ORANGE DYE 21 DAYS
20

15

10

0
2 4 6 9 11 13 15 18 21

MB 5 B MB 10 B MB 20 B OR 5 B OR 10 B OR 20 B

METHYLENE BLUE AND ORANGE PLANT


A 15 days( last PR updated)
16
14
12
10
8
6
4
2
0
2 4 6 9 11 13 15

MB 5 A MB 10 A MB 20 A OR 5 A OR 10 A OR 20 A
METHYLENE BLUE AND ORANGE PLANT A 15 DAYS
15

10

0
2 4 6 9 11 13 15

MB 5 A MB 10 A MB 20 A OR 5 A OR 10 A OR 20 A

20 PLANT B METHYENE BLUE AND ORANGE 15 DAYS


18
16
14
12
10
8
6
4
2
0
2 4 6 9 11 13 15

MB 5 B MB 10 B MB 20 B OR 5 B OR 10 B OR 20 B

You might also like