ELEVATED WORK PLAN (Example) PDF
ELEVATED WORK PLAN (Example) PDF
Provide detailed written plan, which corresponds with the project schedule. Include drawings and sketches for each
phase.
Location of
work:
Fall Protection Systems/ Procedures to be Used on this Project: E.G. Arial Boom Lifts, ½ inch Cable Top Rail
and Mid-rail, Cable Rat Line Designed for fall protection purposes (list # of people allowed to tie off to it), shock
absorbing lanyards with “beamers”, etc.
Implementation of Fall Protection Plan: Where does plan apply (E.G. Walls, Floor Holes, Unguarded Work
Platforms, Ladders, Roofs, Scaffolds, Rigging, Rebar Guarding, Ladders).
1
ELEVATED WORK PLAN (example) Re-Released: 09/2013
Training: Who is trained in the above procedures, who is responsible for training them, and when were they last
trained?
Enforcement: How will you enforce the above policies/ procedures? Describe specific disciplinary policy f or f all
protection infractions.
Changes to Plan: Who do changes go through, who reviews changes, additional training needed?
Rescue Plan: Retrieval method for employee who may become suspended due to an elevated work fall. (Examples:
aerial lift, boom basket, mechanical retrieval device.)