You are on page 1of 6

OUTPUT UJI NORMALITAS

Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 Motivasi Kerja,
. Enter
Kompetensib

a. Dependent Variable: Produktivitas Kerja


b. All requested variables entered.

Model Summaryb

Adjusted R Std. Error of the


Model R R Square Square Estimate

1 .645a .416 .406 2.45646

a. Predictors: (Constant), Motivasi Kerja, Kompetensi


b. Dependent Variable: Produktivitas Kerja

ANOVAa

Model Sum of Squares df Mean Square F Sig.

1 Regression 524.023 2 262.011 43.421 .000b

Residual 736.169 122 6.034

Total 1260.192 124

a. Dependent Variable: Produktivitas Kerja


b. Predictors: (Constant), Motivasi Kerja, Kompetensi

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) 13.807 3.033 4.552 .000

Kompetensi .481 .069 .518 6.967 .000

Motivasi Kerja .212 .066 .239 3.208 .002

a. Dependent Variable: Produktivitas Kerja


Residuals Statisticsa

Minimum Maximum Mean Std. Deviation N

Predicted Value 36.9196 45.7284 41.5920 2.05572 125


Std. Predicted Value -2.273 2.012 .000 1.000 125
Standard Error of Predicted
.223 .671 .365 .109 125
Value
Adjusted Predicted Value 36.8080 45.7141 41.5919 2.05465 125
Residual -8.04617 5.38644 .00000 2.43656 125
Std. Residual -3.276 2.193 .000 .992 125
Stud. Residual -3.292 2.238 .000 1.003 125
Deleted Residual -8.12592 5.61064 .00011 2.49287 125
Stud. Deleted Residual -3.434 2.276 -.002 1.013 125
Mahal. Distance .033 8.252 1.984 1.779 125
Cook's Distance .000 .091 .008 .013 125
Centered Leverage Value .000 .067 .016 .014 125

a. Dependent Variable: Produktivitas Kerja


One-Sample Kolmogorov-Smirnov Test

Unstandardized
Residual

N 125
Normal Parameters a,b
Mean .0000000
Std. Deviation 2.43656465
Most Extreme Differences Absolute .058
Positive .036
Negative -.058
Test Statistic .058
Asymp. Sig. (2-tailed) .200c,d

a. Test distribution is Normal.


b. Calculated from data.
c. Lilliefors Significance Correction.
d. This is a lower bound of the true significance.
OUTPUT UJI MULTIKOLINEARITAS

Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 Motivasi Kerja,
. Enter
Kompetensib

a. Dependent Variable: Produktivitas Kerja


b. All requested variables entered.

Coefficientsa

Collinearity Statistics

Model Tolerance VIF

1 Kompetensi .866 1.155

Motivasi Kerja .866 1.155

a. Dependent Variable: Produktivitas Kerja

Coefficient Correlationsa

Model Motivasi Kerja Kompetensi

1 Correlations Motivasi Kerja 1.000 -.366

Kompetensi -.366 1.000

Covariances Motivasi Kerja .004 -.002

Kompetensi -.002 .005

a. Dependent Variable: Produktivitas Kerja

Collinearity Diagnosticsa

Variance Proportions

Model Dimension Eigenvalue Condition Index (Constant) Kompetensi Motivasi Kerja

1 1 2.992 1.000 .00 .00 .00

2 .005 24.272 .06 .37 .92

3 .003 29.650 .94 .63 .08

a. Dependent Variable: Produktivitas Kerja


OUTPUT UJI HETEROSKEDASTISITAS

Variables Entered/Removeda

Variables Variables
Model Entered Removed Method

1 Motivasi Kerja,
. Enter
Kompetensib

a. Dependent Variable: ABS_RES


b. All requested variables entered.

Model Summary

Adjusted R Std. Error of the


Model R R Square Square Estimate

1 .233a .054 .039 1.42581

a. Predictors: (Constant), Motivasi Kerja, Kompetensi

ANOVAa

Model Sum of Squares df Mean Square F Sig.

1 Regression 14.216 2 7.108 3.497 .033b

Residual 248.018 122 2.033

Total 262.234 124

a. Dependent Variable: ABS_RES


b. Predictors: (Constant), Motivasi Kerja, Kompetensi

Coefficientsa

Standardized
Unstandardized Coefficients Coefficients

Model B Std. Error Beta t Sig.

1 (Constant) 6.586 1.761 3.741 .000

Kompetensi -.062 .040 -.147 -1.557 .122

Motivasi Kerja -.055 .038 -.134 -1.418 .159

a. Dependent Variable: ABS_RES

You might also like