Professional Documents
Culture Documents
com
P. Pages : 2 NRJ/KW/17/4671
Time : Three Hours *0235* Max. Marks : 80
_____________________________________________________________________
Notes : 1. All questions carry marks as indicated.
2. Solve Question 1 OR Questions No. 2.
3. Solve Question 3 OR Questions No. 4.
4. Solve Question 5 OR Questions No. 6.
5. Solve Question 7 OR Questions No. 8.
6. Solve Question 9 OR Questions No. 10.
7. Solve Question 11 OR Questions No. 12.
8. Due credit will be given to neatness and adequate dimensions.
9. Assume suitable data whenever necessary.
10. Diagrams and chemical equations should be given whenever necessary.
11. Illustrate your answers whenever necessary with the help of neat sketches.
12. Use of non programmable calculator is permitted.
OR
b) What are the remedial measures for redamation of water logged areas? 7
3. a) How the vegetative management can improve the water yield and quality of watershed? 7
OR
b) Explain different types of soil erosion and control measures for it. 7
5. a) What are the various water harvesting techniques? Explain any one in detail. 7
NRJ/KW/17/4671 1 P.T.O
www.rtmnuonline.com
rtmnuonline.com
6. a) How the estimation of peak runoff rate is done? Explain the procedure. 7
OR
om
b) What are the different Agencies work for watershed management projects? Explain one of 7
e.c
the programme.
lin
on
OR
nu
rtm
10. a) Write short note on GIS implementation in watershed management. 7
w.
ww
OR
e.c
lin
i) Hydrologic modelling.
rtm
ii) Difference between finite element method and boundary element method.
w.
ww
*******
NRJ/KW/17/4671 2
www.rtmnuonline.com