nject: Inadequate PPEs at GOR Site (Reminder-01)
Project: Government Officer's Residences (GOR), Multan
Ithas been observed that the contractor is intentionally not procuring PPEs demand
after many verbal assurances since multiple months. Moreover, the contractor is It is
clear violation of Conditions of Contract (COC), Section SP-23 Clause (c), where it is
clearly mentioned that ‘The Contractor Shall also be responsible for providing all
mandatory Personal Protective Equipment (PPE) and necessary stock shall be |
maintained”
Moreover, it has been noticed that the contractor is repeatedly not responding
to instructions related to HSE Department.
+ It is instructed to procure more than 150 Mandatory PPE’s (Safety
of Helmet, Safety Vests, Safety Sioes) according to manpower present on
the site along with additional $0 Mandatary PPE’s for future demand.
j + Also Procure Job Specific PPE's (Safety Gloves, Face Shields, Ear Plugs,
Warning Tape) that are much needed at the site for the Health and Safety of
j tthe Workers.
+ Provide HSE Trainings and TBTs to the Staff and Labour on regular basis.
For & on behalf of
Associated Consulting Engineers
Col (R) Tajammal H. Riaz
Resident Engineer
Copy to:
~ PMIDAP, GOR Multan