nject: Inadequate PPEs at GOR Site (Reminder-01) Project: Government Officer's Residences (GOR), Multan Ithas been observed that the contractor is intentionally not procuring PPEs demand after many verbal assurances since multiple months. Moreover, the contractor is It is clear violation of Conditions of Contract (COC), Section SP-23 Clause (c), where it is clearly mentioned that ‘The Contractor Shall also be responsible for providing all mandatory Personal Protective Equipment (PPE) and necessary stock shall be | maintained” Moreover, it has been noticed that the contractor is repeatedly not responding to instructions related to HSE Department. + It is instructed to procure more than 150 Mandatory PPE’s (Safety of Helmet, Safety Vests, Safety Sioes) according to manpower present on the site along with additional $0 Mandatary PPE’s for future demand. j + Also Procure Job Specific PPE's (Safety Gloves, Face Shields, Ear Plugs, Warning Tape) that are much needed at the site for the Health and Safety of j tthe Workers. + Provide HSE Trainings and TBTs to the Staff and Labour on regular basis. For & on behalf of Associated Consulting Engineers Col (R) Tajammal H. Riaz Resident Engineer Copy to: ~ PMIDAP, GOR Multan Ground Floor, 36-Civic Center-Block, Model Town Extension, Lahore-54700 Pakistan Phones (9242)35170871-74, Fax (9242) 35170875 E Mail aceartsihr@gmall.com

You might also like