Professional Documents
Culture Documents
Wa Rfi e Qro061 069
Wa Rfi e Qro061 069
RFI-E-069
QRO061
Initiated By:
Martín Zúñiga Bello
RFI-E-069
Walbridge de México
Question:
Originally in the plans of the grounding system, in the area of transformers only one ground wire is
indicated in the low voltage cabinets, which is necessary to install an additional ground wire in the MV
(medium voltage) cabinet for the feeders , because in transformers it has the ground connection screw
and in engineering it marks the wiring of the 3 phases + ground; It is recommended to install an
Signature Attachments: x
Suggestion
Comments:
Routing History:
From Date Sent To Date Received
NOTE: Company Name
cc: Contact Fax # Copies Notes
Unless expressly stated, the information provided in this RFI is not intended to modify any contrac terms or render Walbridge de
Mexico responsible for any aspect of the design caused by proposed deletions, additions and/or modifications to the Contract
Documents that may be contained herein (that responsibility remains with Architect/Engineer). If a party believes that the
information contained herein does modify the terms of their contract or imposes design responsibility upon Walbridge de Mexico,
they are to immediately notify Walbridge de Mexico in writing.