Professional Documents
Culture Documents
Mechanical Engineering Department
Mechanical Engineering Department
DEPARTMENT
POLITEKNIK KOTA BHARU
DJJ42022 INDUSTRIAL MANAGEMENT
GROUP 5
2|Page
TABLE OF CONTENTS.
INTRODUCTION…………………………………………………………………..3
CONTENTS………………………………………………………………………4-12
APPENDIX…………………………………………………………………………14
BIBLIOGRAPHY…………………………………………………………………...15
3|Page
INTRODUCTION
We chose Hash Cream as our case study because it fulfils the requirements of
our assignment deals with industrial design, construction, management, and
application of science and engineering principles to improve the entire industrial
infrastructure and industrial processes.
4|Page
CONTENTS.
Company Background.
Introduction to product
Ice cream
a beloved frozen dessert enjoyed by people of all ages around the world. It is
a treat that brings joy, refreshment, and a delightful indulgence on a hot
summer day or any time of the year.
known for its smooth, creamy texture and a wide variety of flavours, making it
a versatile and customizable dessert.
Available flavours; Vanilla, Chocolate, Rainbow, Strawberry, Vanilla Chips,
Chocolate Chips, Yam, Durian, Tea, Peppermint Chips, Corn, Cream
Cookies.
Provided in;
o 470ml tub container
o 100ml cup
o 1L tub container
o 6L tub container
o Ice cream box 5L
o Ice cream catering.
5|Page
Method of Production/by Step.
Mixers
Batch Freezers
Hardening Cabinets
6|Page
Preparation of the floor plan.
Plan layout.
Kitchen
Mixing
Owner house
procedure
Ice cream Ice cream
machine machine
Packaging
Ingredients
Labelling office
Freezer
Locker
7|Page
Floor plan.
Floor plan of hash cream factory
OFFICE
8|Page
Preparation of process chart and flow diagram.
Process chart.
9|Page
FLOW PROCESS CHART
10 | P a g e
Preparation of proposed layout.
Kitchen
Mixing
procedure
Ice cream
machine
Owner house
Ice cream
Ingredients
machine
Packaging
Freezer office
Labelling
Locker
11 | P a g e
Line balancing after.
12 | P a g e
DESIRED CYCLE TIME
420
Cd = =4.375 minutes/unit
96
30+20+15+10+5 80
N= = =18.29→ 18 work station
4.375 4.375
13 | P a g e
DISCUSSION
During our discussion, we explored various topics related to ice cream production,
including machine selection, floor plan preparation, line balancing. These aspects
are crucial for ensuring efficient and effective ice cream manufacturing operations.
By optimizing tasks, allocating resources wisely, and implementing efficient
workflows, ice cream manufacturers can maximize productivity, minimize costs, and
meet customer demands. It is essential for manufacturers to stay informed about
industry best practices and adapt them to their specific business needs in order to
thrive in a competitive market.
CONCLUSION
In conclusion, the case study focused on the ice cream manufacturing process and
management aspects. We discussed various key elements such as machine
selection, floor plan preparation, line balancing, cost estimation, and production
capacity. By carefully considering these factors and implementing effective
strategies, ice cream manufacturers can optimize their operations and achieve
successful outcomes.
14 | P a g e
APPENDIX
15 | P a g e
BIBLIOGRAPHY
16 | P a g e