Medical Collage Infrastructure Construction Development Committee

(MCICDC), Geta, Kalika


Consultant:- SILT-Moonlight-Eversafe Jv
Contrctor:-Uchchakoti Nirman Sewa Pvt.Ltd.
CONCRETE POUR CRD FOR CAST -IN-SITU PCC

Construction of Water Supply System with Overhead Tank, Mutipurpose Hall, Temple,Septic Tank and Allied Works

Ref. No. CONTRACT NO: NCB/MCICDC/WSOHT/078/079-001


DATE: Temperature:
STRUCTURAL IDENTIFICATION/JOB:

FORMWORK:
1. LINE/PLUMB: …………………………………………………… 2. LEVEL: …………………………………
3. CONCRETE BOTTOM LEVEL: ……………………………………… 4. CONCRETE TOPLVL: …………
5. DIMENSIONS & SIZE: ……………………………………………… 6. DEVIATION: None (mm) ……
7.SLOPE: ……………………………………………………………..

REINFORCEMENT:
1. MAIN BAR DIA: ………………………………………………………… 2. DISTRIBUTION BAR: ………
3. RINGS: …………………………………………………………….. 4. SPACING: ………………………………
5. L-HOOKS: …………………………………………………………….. 6. LAPS: None (mm)
7. DETAILS OF INSERTS: ………………………………………………
8. BAR PALCING: ………………………………………………………… 9. CHAIRS: ………………………………
10. SPACE BAR: …………………………………………………………… 11. JUNCTION DETAILS: ………
12. COVER & COVER BLOCKS: ……………………………………
12. BENT UP AND CURTAILMENT: ……………………………
14. ELECTRICAL CONDITION: …………………………………… 15. SANITARY DUCTS: ……………

CONCRETE:
CEMENT BRAND:…………………………………………………. CEMENT QUANTITY:…………(BAGS)
QUANTITY OF CONCRETE (Target) : ………………………… GRADE OF CONCRETE: ……………
QUANTITY OF CONCRETE (Exact) : ……………………………
W/C RATIO:
ADMIXTURE:

PROPORTIONS OF COCRETE:
CEMENT QUANTITY: F.A:
WATER: C.A:

MATERIALS QUANTITY DETAILS:


QUANTITY AVAILABLE: THEORETICAL CONSUMPTION:
CA: m3 CA: m3
FA: m3 FA: m3
CEMENT: …………………………………………………………….. CEMENT: ……………………………………

STARTING TIME: ……………………………………………………………COMPLETION TIME: …………………

ANY OTHER DETAILS: …………………………………………………


REMARKS:
…………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………….
………………………….. ………………………….. …………………………..
Prepared by Checked by Verified by