Professional Documents
Culture Documents
By:
Villacrusis, Danica U.
Perez,Alexandra Mae M.
Avellana, Hyram M.
Hapita, Patrick F.
Rogel, Evanel D.
Boaloy, Evan C.
Aban, Cindy P
2023
FOREWORD
2
Acknowledgement
3
Table of Contents
4
Project Overview
5
PROBLEM 1: SINGLE – PHASE LINE INTENDED FOR THE POWER
REQUIREMENT OF A CERTAIN FACILITY
Design a single phase line that will supply the requirement of the facility. Provide
computation for the transformer rating, size of conductor, overcurrent and surge
protection. Prepare also bill of materials.
6
4−2.5 Hp ACU =( 2.5 ×746 ) × 4=7,460 W
2−2.5hp Water Pump=( 2.5 ×746 ) × 2=3,730 W
1.5 kW Lighting Load=1,500 W
3−6 hp 1 Ø Motor=( 6 ×746 ) × 3=13,428 W
3 kW Appliance Load=3,000W
29,118 W ×1.10=32,029.8W
32,029.8 W ÷ 0.8=40,037.25VA
Transformer rating:
40,037.25VA
Primary Current = =1.75 A
(1.732 x 13 , 200)
40,037.25 VA
Secondary Current =174 .7 A
230
7
SKETCH EE - 115: Dis tributio n S ys te m and
N S ubs tatio n De s ig n Project No. Page No.
SEE SHEET NO. START SHEET NO. 1 Checked by Staked by
AS-PLAN STAKING SHEET
OF 1 Date Date
PRIMARY CONDUCTOR 1/0 6/1 ACSR PROJECT MAP REF. Released by Final Inv. by
NEUTRAL CONDUCTOR 1/0 6/1 ACSR SUBSTATION Date Date
RULING SPAN 50 METERS LINE
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
N O.
N O.
N O.
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
C 60 1f 1 35 SP 1 A1 1 M2-9
D 50 1f 1 35 SP 1 A1 1 M2-9
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
1f 8 35 SP 4 A1 0 50 KvA 1 M2-11A 5 E1-2 5 F2-1 5 J5 0 1,353 ACSR
1f 2 A3 7 M2-9 451 INS
451 1f 1 A4 0 ACSR
1 A5 8
INS
9
20 Deadend Assembly, Primary 2
21 Deadend Assembly, Neutral 2
22 Locknut, 5/8’’ 5 9.00 45.00
TOTAL COST OF A4
Washer, 2 1/4’’ Square With 13/16’’
23 2 25.00 50.00
Hole
24 Insulator, Suspension, 6’’ 2 400.00 800.00
Bolt, Oval Eye, 5/8’’ x Required
25 2
A5 Length
26 Shackle, Anchor 1 310.00 310.00
27 Deadend Assembly, Primary 1
28 Deadend Assembly, Neutral 1
29 Locknut, 5/8’’ 2 9.00 18.00
TOTAL COST OF A5
10
TOTAL COST OF M2-9
43 Connector 1
44 Rod, Ground 5/8'', Dia. 8' - 0'' 1 500.00 500.00
45 Clamp, Ground Rod 1 20.00 20.00
M2-11
46 Staples Ground Wire 1 140.00 140.00
47 Ground Wire, Minimum No. 6 Copper
48 Ground Wire Extension
TOTAL COST OF M2-11
Bolt, Machine, 5/8’’ x Required
49 1
Length
Washer, 2 1/4’’ Square With 11/16’’
50 1 25.00 25.00
Hole
Washer, Curved, 3'' Square x 1/4’’
51
With 11/16’’ Hole 37.00
52 E1-2 Screw, Lag, 1/2’’ x 4’’ 18.00
53 Connectors
54 Clamp, Guy, 3-Bolt 2 280.00 560.00
55 Guy Attachment 1
56 3/8'' Guy Strand 180.00
57 Clamp, Bonding, Guy 1 160.00 160.00
58 Locknut, 5/8'' 2 9.00 18.00
TOTAL COST OF E1-1
Washer, 4'' Square x 1/2’’ With
59 1 100.00 100.00
13/16’’ Hole
F2-1 Rod, Anchor, Thimble Eye 5/8'' x 7' -
60 1 450.00 450.00
0''
61 Anchor, 8'' Dia. X 4' - 0'' 1 1500.00 1500.00
TOTAL COST OF F2-1 2050.00
12
PROBLEM 2: SINGLE – PHASE DISTRIBUTION LINE WITH
UNDERBUILT AND OPEN SECONDARY
Demand
1 0.75 kW
2 1.5 kW
3 2.5 kW
Design a single phase distribution line that will supply the project. Compute
the size of transformers and conductors using diversity factor. Determine the size of
current protection of each transformer and at the tapping point. Provide also voltage
drop computation for the secondary line. And lastly, prepare bill of materials for the
created design.
13
Total Connected Loads (Transformer 1)
6000+20000=26,000 W
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
14
OVERCURRENT PROTECTION:
15
Total Connected Loads (Transformer 2)
10500+21000=31,500W
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
OVERCURRENT PROTECTION:
16
Use code Swan ACSR
10500+21000=31,500W
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
17
OVERCURRENT PROTECTION:
18000+12000=30,000W
18
38.824 ÷ 2=19.412 kVA
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
OVERCURRENT PROTECTION:
19
= 108.7 x 1.25 = 135.87 A
20
SKETCH EE - 115: Dis tribution Sys tem and
N Subs tation Des ign Project No. Page No.
SEE SHEET NO. START SHEET NO. 1 Checked by Staked by
AS-PLAN STAKING SHEET
OF 1 Date Date
PRIMARY CONDUCTOR 1/0 6/1 ACSR PROJECT MAP REF. Released by Final Inv. by
NEUTRAL CONDUCTOR 1/0 6/1 ACSR SUBSTATION Date Date
RULING SPAN 50 METERS LINE
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
N O.
N O.
N O.
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
B 50 1f 1 40 SP 1 A1 1 M2-9
C 50 1f 1 40 SP 1 A4 90 1 M2-9 2 E1-2 1 J5
F 50 1f 1 40 SP 1 A1 1 G11 1 M2-9
G 50 1f 1 40 SP 1 A1 1 G11 1 M2-9
F 50 1f 1 35 SP 1 A1 1 G11 1 M2-9
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
1f 8 40 SP 9 A1 5 G11 0 M2-11A 5 E1-2 1 F2-1 2.00 4 J5 0 2,178 ACSR
1f 2 A3 13 M2-9 726 INS
726 1f 1 A4 0 ACSR
21
INS
22
BILL OF MATERIALS
UNIT TOTAL
ASSEMBL QT
NO. DESCRIPTION COST COST
Y Y
(PHP) (PHP)
1 Insulator, Pin Type 1
2 Pin, Pole Top, 20’’ 1 245.00 245.00
Bolt, Machine, 5/8’’ x Required
3 2
Length
Washer, 2 1/4’’ Square With 13/16’’
4 3 25.00 75.00
A1 Hole
5 Screw, Lag, 1/2’’ x 4’’ 2 18.00 36.00
6 Washer, Spring, 5/8’’ 3 75.00 225.00
Bolt, Single Upset, Insulated, 5/8’’ x
7 1
Required Length
8 Locknut, 5/8’’ 3 9.00 27.00
TOTAL COST OF A1
9 Insulator, Pin Type 2
10 Pin, Pole Top, 20’’ 2 245.00 490.00
Bolt, Machine, 5/8’’ x Required
11 4
Length
Washer, 2 1/4’’ Square With 13/16’’
12 3 25.00 75.00
A2 Hole
13 Washer, Spring, 5/8’’ 4 75.00 300.00
14 Bracket, Pole Top, 1/4'' x 3'' 2
15 Bracket, Rigid Clevis, Insulated 1 125.00 125.00
21 Shackle, Anchor 1 310.00 310.00
22 Angle Assembly, Primary 1
23 Angle Assembly, Neutral 1
24 Locknut, 5/8’’ 1 9.00 9.00
TOTAL COST OF A3
Washer, 2 1/4’’ Square With 13/16’’
25 4 25.00 100.00
Hole
26 Insulator, Suspension, 6’’ 4 400.00 1600.00
Bolt, Oval Eye, 5/8’’ x Required
27 4
A4 Length
28 Shackle, Anchor 2 310.00 620.00
29 Deadend Assembly, Primary 2
30 Deadend Assembly, Neutral 2
31 Locknut, 5/8’’ 5 9.00 45.00
TOTAL COST OF A4
1 A1
2 A2
3 A3
4 A4
5 A5
6 G11
7 M2-9
8 M2-11
9 E1-2
10 F2-1
11 J5
26
PROBLEM 3: VEE – PHASE DISTRIBUTION LINE WITH UNDERBUILT
AND OPEN SECONDARY
27
As shown in the map is a housing project. The demand of each household is
shown in the table below.
Demand
1 0.75 kW
2 1.5 kW
3 2.5 kW
Design a vee - phase distribution line that will supply the project. Compute the
size of transformers and conductors using diversity factor. Determine the size of
current protection of each transformer and at the tapping point. Provide also
voltage drop computation for the secondary line. And lastly, prepare bill of materials
for the created design.
6000+20000=26,000 W
28
Assume Power Factor @ 85%
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
OVERCURRENT PROTECTION:
29
Primary Current = (Transformer VA Rating) / (Primary Voltage)
10500+21000=31,500W
30
Provide 1-25 kVA Single Phase Transformer
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
OVERCURRENT PROTECTION:
31
Total Connected Loads (Transformer 3)
10500+21000=31,500W
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
OVERCURRENT PROTECTION:
32
= 1.09 x 1.25 = 1.3625 A
18000+12000=30,000W
25,000
Primary Current = =1.09 A
(1.732 x 13 , 200)
25,000
Secondary Current =108.7 A
230
33
For Primary: Use 1-ACSR (Swan)
OVERCURRENT PROTECTION:
Masolve VD
34
35
SKETCH EE - 115: Dis tribution Sys tem and
N Subs tation Des ign Project No. Page No.
SEE SHEET NO. START SHEET NO. 1 Checked by Staked by
AS-PLAN STAKING SHEET
OF 1 Date Date
PRIMARY CONDUCTOR 1/0 6/1 ACSR PROJECT MAP REF. Released by Final Inv. by
NEUTRAL CONDUCTOR 1/0 6/1 ACSR SUBSTATION Date Date
RULING SPAN METERS LINE
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
N O.
N O.
N O.
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
B 50 2f 1 40 SP 1 B1 1 M2-9
C 50 2f 1 40 SP 1 B4 90 1 M2-9 2 E1-2 1 J5
E 60 2f 1 40 SP 1 B3 60 1 M2-9 1 E1-2 1 J5
F 50 2f 1 35 SP 1 B1 1 G11 1 M2-9
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
2f 8 40 SP 9 B1 5 G11 0 M2-11A 5 E1-2 1 F2-1 2.00 4 J5 0 2,178 ACSR
2f 2 B3 13 M2-9 726 INS
726 2f 1 B4 0 ACSR
36 INS
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
NO
NO
NO
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
.
.
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
H 50 2f 1 35 SP 1 B1 1 G11 1 M2-9
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
2f 10 35 SP 8 B1 2 G11 0 M2-11A 2 E1-2 2 F2-1 2.00 2 J5 0 1,650 ACSR
2f 2 B5 10 M2-9 550 INS
550 2f 0 ACSR
37
INS
38
23 Connectors
24 Nut, Eye, 5/8'' 2
25 Jumpers
26 Shackle, Anchor 2
27 Deadend Assembly, Primary 4
28 Deadend Assembly, Neutral 2
29 Locknut, 5/8’’
TOTAL COST OF B4-1
39
43 Transformer 1 84000.00 84000.00
44 Jumpers, #6 S.D. Copper
45 Washer, Spring, 5/8’’ 75.00
46 Bracket, Transformer 1 1200.00 1200.00
47 Bracket, Combination and Arrester 1 1100.00 1100.00
TOTAL COST OF G11
48 Connector 1
49 Staples Ground Wire 1 140.00 140.00
M2-9
50 Ground Wire Clip 1 135.00 135.00
51 Ground Wire, Minimum No. 6 Copper
TOTAL COST OF M2-9
52 Bolt, Machine, 5/8’’ x Required Length 1
Washer, 2 1/4’’ Square With 11/16’’
53 1 25.00 25.00
Hole
Washer, Curved, 3'' Square x 1/4’’ With
54
11/16’’ Hole 37.00
55 Screw, Lag, 1/2’’ x 4’’ 18.00
E1-2
56 Connectors
57 Clamp, Guy, 3-Bolt 2 280.00 560.00
58 Guy Attachment 1
59 3/8'' Guy Strand 180.00
60 Clamp, Bonding, Guy 1 160.00 160.00
61 Locknut, 5/8'' 2 9.00 18.00
TOTAL COST OF E1-1
Washer, 4'' Square x 1/2’’ With 13/16’’
62 1 100.00 100.00
Hole
F2-1
63 Rod, Anchor, Thimble Eye 5/8'' x 7' - 0'' 1 450.00 450.00
64 Anchor, 8'' Dia. X 4' - 0'' 1 1500.00 1500.00
TOTAL COST OF F2-1
40
Washer, 2 1/4’’ x 2 1/4'' x 3/16'', 13/16’’
66 1 25.00 25.00
Hole
67 Bolt, Eye, 5/8'' x Required Length
68 Connectors
69 Bolt, Double Upset
70 Clevis, Secondary, Swinging, Insulated 110.00
71 Insulator, Spool
Bolt, Single Upset, Insulated, 5/8’’ x
72
Required Length
73 Clamp, Loop, Deadend 55.00
74 Sleeve, Offset, Splicing
75 Bracket, Insulated
76 Transformer Secondary Bracket
77 Locknuts 9.00
TOTAL COST OF J5
41
PROBLEM 4: THREE – PHASE LINE INTENDED FOR THE POWER
REQUIREMENT OF A CERTAIN FACILITY
As shown in the map is a facility that requires 3Ø supply. It has the following
load:
9 - 2.5 hp ACU
3 - 30 hp 1Ø Motor, 380 V
6 kW Appliance Load
Design a 3Ø line that will supply the facility and consider primary metering.
Provide
42
43
TOTAL CONNECTED LOADS
50,000
Primary Current = =2.19 A
(1.732 x 13 , 200)
50,000
Secondary Current =217.39 A
230
44
SKETCH EE - 115: Dis tributio n S ys te m and
N S ubs tatio n De s ig n Project No. Page No.
SEE SHEET NO. START SHEET NO. 1 Checked by Staked by
AS-PLAN STAKING SHEET
OF 1 Date Date
PRIMARY CONDUCTOR 1/0 6/1 ACSR PROJECT MAP REF. Released by Final Inv. by
NEUTRAL CONDUCTOR 1/0 6/1 ACSR SUBSTATION Date Date
RULING SPAN 40 METERS LINE
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
N O.
N O.
N O.
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
B 50 3f 1 40 SP 1 C3 1 M2-9
C 60 3f 1 40 SP 1 C1 1 M2-9
D 50 3f 1 40 SP 1 C1 1 M2-9
E 60 3f 1 40 SP 1 C3 1 M2-9 1 E1-2 1 J5
F 60 3f 1 40 SP 1 C1 1 M2-9
G 50 3f 1 40 SP 1 C4 1 M2-9 2 E1-2 2 J5
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
3f 0 35 SP 5 C1 1 G310 0 M2-11A 4 E1-2 0 F2-1 2.00 4 J5 0 1,290 ACSR
3f 2 C3 8 M2-9 430 INS
430 3f 1 C4 0 ACSR
45
INS
Bldg A Bldg D
Bldg C
Power Facility
4 - 10 hP ACU
2 - 2.5 hp ACU
8 - 2.5 hp ACU
6 kW Lighting Load
3 kW Lighting Load
2 kW Appliance Load
9 kW Appliance Load
1 - 12 hp Water Pump
Bldg E
Bldg B
8 - 10 hP ACU
10 - 2.5 hp ACU
3 kW Lighting Load
3 kW Lighting Load
9 kW Appliance Load
6 kW Appliance Load
1 - 12 hp Water Pump
1 - 12 hp Water Pump
3 - 30 hp 3Ø Motor, 380 V
46
note: The facility will utilize underground secondary lines
Bldg C, Water Supply, Bldg D, and Bldg E have also common feeder.
Design a distribution line that will supply the site. Provide computation for the
rating of the equipment, size of primary conductor, and overcurrent protection on the
primary side. Determine the size of the conductor and conduct voltage drop
calculation in the secondary lines. Determine also the size of the main circuit breaker
and the protection of the two secondary lines. Prepare bill of materials.
47
Total Load:
Building A:
Building B:
Building C:
Building D:
Building E:
Water Supply:
Power Facility:
48
Provide 3-333 kVA single phase transformer
49
OVERCURRENT PROTECTION
50
SKETCH EE - 115: Dis tributio n S ys te m and
N S ubs tatio n De s ig n Project No. Page No.
SEE SHEET NO. START SHEET NO. 1 Checked by Staked by
AS-PLAN STAKING SHEET
OF 1 Date Date
PRIMARY CONDUCTOR 1/0 6/1 ACSR PROJECT MAP REF. Released by Final Inv. by
NEUTRAL CONDUCTOR 1/0 6/1 ACSR SUBSTATION Date Date
RULING SPAN 50 METERS LINE
ANGLE
LEAD
POLE BACK P. TOP FORMER GRND. GUY ANC. 2W MISC. RIGHT O
POLE REMARKS
N O.
N O.
N O.
NO. SPAN UNIT SPAN or WIRE DROP SIZE UNITS OF WAY N
MTRS. (A.B.C.) "G" "M" "E" "F" MTRS. UB SIZE "J" MTRS. "K" "M" "RI" S
Q C Q H C Q CODE Q CODE Q CODE Q CODE M Q CODE Q C Q CODE Q Q Q CODE Q CODE Q CODE Q CODE
B 50 3f 1 40 SP 1 C1-3 1 M2-9
D 50 3f 1 40 SP 1 C1-3 1 M2-9
F 60 3f 1 40 SP 1 C1-3 1 M2-9
H 50 3f 1 40 SP 1 C1-3 90 1 M2-9
J 40 3f 1 40 SP 1 C1-3 M2-9
QUAN PH Q HT CL Q CODE Q CODE Q CODE Q CODE Q CODE QTY CD SIZE Q CODE Q CODE Q CODE Q CODE Q CODE QUANTITY CODE
3f 0 35 SP 6 C1-3 1 G312 0 M2-11A 7 E1-2 7 F2-1 7 J5 0 1,710 ACSR
3f 3 C3-2 10 M2-9 570 INS
570 3f 2 C4-1 0 ACSR
51
INS
Technical Specifications
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
References
68
A. PERSONAL INFORMATION
Age: 22
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: F. DAVID ELEMENTARY SCHOOL
2007-2013
Secondary:
2013-2017
2017-2019
2019-2023
69
A. PERSONAL INFORMATION
Age: 22
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: STO. DOMINGO ELEMENTARY
SCHOOL
2007-2013
Secondary:
2013-2017
2017-2019
2019-2023
70
A. PERSONAL INFORMATION
Age: 34
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: MALANDAY ELEMENTARY SCHOOL
1995-2001
Secondary:
2001-2005
2019-2023
71
A. PERSONAL INFORMATION
Age: 22
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: SAN PEDRO ELEMENTARY SCHOOL
2007-2013
Secondary:
2013-2017
2017-2019
2019-2023
72
A. PERSONAL INFORMATION
Age: 22
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: DAET ELEMENTARY SCHOOL
2007-2013
Secondary:
2013-2017
2017-2019
2019-2023
73
A. PERSONAL INFORMATION
Age: 23
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: PANDAN ELEMENTARY SCHOOL
2007-2013
Secondary:
2013-2017
2017-2019
2019-2023
74
A. PERSONAL INFORMATION
Age: 22
Citizenship: FILIPINO
Parents
B. EDUCATIONAL ATTAINMENT
Elementary: SAN VICENTE ELEMENTARY SCHOOL
2007-2013
Secondary:
2017-2019
2019-2023
75
76