You are on page 1of 3

01-04-2023

100000

Asphalt Surface course (50mm) Asphalt Surface course (50mm)


Class B - Concrete (250mm) Class B - Concrete (250mm)
Sub-basecourse (600mm) Sub-basecourse (600mm)
Filling Sand (1000mm) Filling Sand (1000mm)
Geo-Grid ( Td=150kN/m ) Geo-Grid ( Td=150kN/m )
50000 Filling Sand Filling Sand 50000

30500 2500 16000 1000 1000 16000 2500 30500


Road Shoulder Road Road Road Shoulder
1 50 50 1
50 50
1 50 50
1
600 250 900 900 250 600

50

50
250

250
1 1

250

250
250

250
1 1

600

600
1000 1000
1000 1000

1000
250 250

45200

SECTION 1-1 1/100

100 meters main street 2x16 meters asphalt road


01-04-2023

50000

Asphalt Surface course (50mm) Asphalt Surface course (50mm)


Asphalt Binder course (100mm) Asphalt Binder course (100mm)
Basecourse (250mm) Basecourse (250mm)
Sub-basecourse (300mm) Sub-basecourse (300mm)
Filing Sand (1000mm) Filling Sand (1000mm)
Geo-Grid ( Td=150kN/m ) Geo-Grid ( Td=150kN/m )
25000 Filling Sand Filling Sand 25000

11500 2500 10000 1000 1000 10000 2500 11500


1 Road Shoulder Road Road Road Shoulder 1
1 50 50 1
50 50
50 50
300 250 250 100 100 800 800 100 100 250 250 300
100 100

250 100 50

250 100 50
1 1
1 1

1000 1000
1000 1000

300

300
1000

1000
250
250

33500

SECTION 2-2 1/100

50 meters main street 2x10 meters asphalt road


01-04-2023

Asphalt Surface course (50mm)


Asphalt Binder course (100mm)
Basecourse (250mm)
Sub-basecourse (300mm)
Filling Sand (1000mm)
Geo-Grid ( Td=150kN/m )
Filling Sand

20000

Road
50 50
50
100
+7.30 50
100

250 100 50

250 100 50
300 250 250 100 100 250 250 300

1000 1000
1000 1000

300

300
1000
250 250

26700

SECTION A-A 1/100

20 meters asphalt road

You might also like