You are on page 1of 1

Contingency Plan

Name of Production: Euphoria Producers Name: Pippa Contact Number: 07752 559885

Location / Potential problem Effect on production Control Measure Existing measures


scene
Poole college – One of the powder crew Don’t have enough people Have back up people to do the Find people I can have as back up on
green screen – mates can’t come to throw the powder – powder incase the day and know they will be happy
scene one – nine can’t do production to it to help.
effect
Scene one – Can’t get hold of the The main idea of the piece Have a backup idea for the Have a go with the back up Idea,
nine powder paint won’t work and the piece powdered paint – flour and colour make sure collect Ingredients before
won’t have the colour it to specific colours hand
theme in it
Scene one – Costume isn’t made in Won’t have a costume Have a backup costume incase – Have a costume as last resort sorted
nine time / arrives easy to get at home

Scene one – Cameras aren’t booked Can’t film Have to film another time - be Bring In my own camera, have
nine out better at booking equipment out video and photo camera at hand
ahead of time from home.
Scene one – Green screen room in Don’t have a studio that Book out the green screen room Have a flat space outside to film, or
nine use works to film in ahead of time so I know its look into booking a dance studio
accessible to me when I need it room out as well.

You might also like