1. FORMWORKS AND 206,800.00 4.14 240 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 0.26 100.00%
SCAFFOLDING
2. EXCAVATION/ 123,304.50 2.47 90 0.412 0.412 0.412 0.412 0.412 0.412
5. REINFORCING STEEL BARS 689,591.80 13.80 90 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3
8. SUPPLY AND 126,500.00 2.53 75 0.506 0.506 0.506 0.506 0.506 50%
INSTALLATION OF
COLORROOF ROOFING
9. DOORS AND WINDOWS 315,700.00 6.32 150 0.632 0.632 0.632 0.632 0.632 0.632 0.632 0.632 0.632 0.632
10. CEILING WORKS 277,200.00 5.55 150 0.555 0.555 0.555 0.555 0.555 0.555 0.555 0.555 0.555 0.555
12. PLUMBING WORKS 278,929.45 5.58 90 0.93 0.93 0.93 0.93 0.93 0.93
13. ELECTRICAL WORKS 209.000.00 4.18 75 0.836 0.836 0.836 0.836 0.836
14. PAINTING WORKS 243,520.20 4.87 150 0.487 0.487 0.487 0.487 0.487 0.487 0.487
15. KITCHEN COUNTER AND 219,373.00 4.39 30 2.195 2.195 0.00%
CABINETS
16. SUPPLY AND 90,288.00 1.81 60 0.4525 0.4525 0.4525 0.4525
INSTALLATION OF
STAINLESS STEEL RAILINGS
17. SUPPLY AND 88,000.00 1.76 30 0.88 0.88
INSTALLATION OF
ARCHITECHTURAL SUN
BUFFERS
18. TOTAL 4,995,596.30 100 240
days
PLAN PERIODIC 7.6 7.6 4.5 4.5 4.1 4.1 12.3 12.3 12.3 12.3 11.5 3.7 3.7 3.2 3.2 3.2
CUMULATIVE
ACTUAL PERIODIC
CUMULATIVE
VARIANCE PERIODIC
CUMULATIVE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ACTUAL (PhP) PERIODIC
CUMULATIVE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00