Conditioner loading and Dry Ash loading

Dated 02-05-2023 Level wet Dry Brick


Shift-C in mtr. loading Balker Top up plant
Ash plant #3 2000 ton 14.40 0 10
Ash plant #3 1000 ton 9.70 0
Ash plant #3 340 ton 12.80 0
Ash plant #5 silo -1 14.18 7
Ash plant #5 silo-2 12.70 7
Dfat silo New 1000 ton. 0.01 0 0
Dfat silo Old 600 ton 4.00 0 19
Total 0 24 19 0