PROJECT NAME : WIDENING AND UPGRADATION TO 2 LANE WITH PAVED SHOULDER CONFIGURATION AND

GEOMETRIC IMPROVEMENTS FROM KM 8.000 TO KM 65.000 (PACKAGE-1) ON AIZAWL-TUIPANG SECTION

Joint Site Visit & Inventory Reg:,Slope Protection Structures


AE & EPC Contractor joint Visit

Chainage Length
S.No. Side Slope Countermeasure
Start End Length

1 08+400 08+460 60 RHS Seeding & Mulching,

2 10+450 10+530 80 RHS F-500 Crib Work

3 10+980 11+020 40 RHS Seeding & Mulching

4 11+500 11+550 50 RHS Seeding & Mulching

5 11+840 11+860 20 RHS Seeding & Mulching

6 12+060 12+160 100 RHS Rockfall prevention & Fence

7 12+600 12+700 100 RHS Rockfall prevention & Fence

8 15+660 15+720 60 RHS F-500 Crib Work

9 16+380 16+480 100 LHS Gabion Wall at LHS Culvert Chute Drain

10 18+470 18+490 20 RHS Seeding & Mulching

11 18+495 18+520 25 RHS Seeding & Mulching

12 18+690 18+730 40 RHS Seeding & Mulching

13 18+790 18+830 40 RHS Seeding & Mulching

14 19+380 19+440 60 RHS Seeding & Mulching

15 22+680 22+730 50 RHS F-500 Crib Work &Seeding & Mulching

16 24+810 24+850 40 RHS Seeding & Mulching

17 25+820 25+900 80 RHS Seeding & Mulching

18 32+260 32+290 30 LHS Seeding & Mulching

19 34+180 34+220 40 RHS Seeding & Mulching

20 42+420 42+480 60 LHS F-300 Crib Work

21 42+850 42+870 20 LHS Seeding & Mulching

22 47+430 47+490 60 RHS Seeding & Mulching

23 48+540 48+580 40 LHS Anchor Work

24 52+060 52+140 80 RHS F-300 Crib Work

25 52+460 52+580 120 RHS Non - Frame Work/Seeding & Mulching

26 52+680 52+750 70 RHS F-300 Crib Work

710313480.xlsx Page 1
Chainage Length
S.No. Side Slope Countermeasure
Start End Length
Gabion with Chute Drain - Two Chute in for Water
27 55+320 55+340 20 RHS
way

28 55+380 55+460 80 LHS Gabion Work

29 55+450 55+550 100 RHS Anchor Work

30 56+100 56+300 200 RHS Rockfall prevention & Fence

31 56+200 56+280 80 LHS Gabion Work

32 56+200 56+320 120 RHS Anchor Work

33 61+700 61+750 50 LHS Turfing

34 64+060 64+160 100 RHS Rockfall prevention & Fence

Gabion Wall Beside Retaining wall


35 350 BHS Gabion Wall
Protection &Cascade

Total SLOPE COUNTERMEASURE Length Unit L As Per Schedule Qty. Remarks

Gabion Wall 630 m3 630 3430

Groundwater Drainage 0 m 0 2010

Earth removal 640 m3 640 8190

Hydroseeding 0 m2 0

Vegetation mat 0 m2 0

Seeding and Mulching 795 m2 795 2000

Rockfall prevention wall (H=3m) 500 m3 500 2436

Rockfall prevention fence (H=2m) 500 M 500 560

Non-frame 120 m2 120 1200

Crib work (F300) 210 m2 210 900

Crib work (F500) 190 m2 190 3450

Anchor works 260 m2 260 4450