BINA-KATNI3RD LINE PROJECCT

DrgNo 3x4 (filling 2.00M 25/Apr/23


Ch. 1076/2 Section 1

Top slab Bottom slab End wall Effoctive Effectlve


Cover Haunch
Box Slze Barrel Length thicknos Thickness Span Helght
thicknoss

11.495 0.40 0.40 0.40 2.40 4.66 0.05 0.20 0.20


2.00 4.15
Cut. Total Unit Total Wt|
Sr.Bar Shape of Bar Dia of bar| Spacing |No of Bars Remark
No Mark Length Length WURmt_in Mt

1.070
200 116 6.990 810 840 2.469 2.002 Side Wall Vertical maln steel
20

1 070

700

2 12 0.200 58 6.106 354.1


148 0.889 0.315 Top Slab Top Maln Steel
2

2.7700 16 0.100 116 2.700 313.2 1.580 0.495 Top Slab Bottom Steel

4 2 0.200 6.106 354.148 0.889 0.315 Raft Bottom Main Steel

2.700

16 0 100 116 2.700 313.200 1.580 0.495 Raft Top Steel


5 2.700

LO Side Wall Vertical Steel


12 100 230 4.850 1115.500 0.889 0.992

0.30
1.173 0.200 116 1.773 205.622 2.469 0.508 Haunch Steel Top Level
7 f1 20

0.30
0.30

2 20 0.200 116 1.773 205.62 2.469 0.508 Haunch Steel Raft Level
1.173
0.30

0.10
.100 4872 0.490 2387.280 0.617 1.473 Shear Link for Raft & Top Slab
91& g4 10

o.10

0.10

10 g3 10 01100 9976 0.490 4888.240 0.617 3.016 Shear Link for R.C.C. Wall

0.10

10 0.100 116 1.395 1321.820 0.617 0.816


Distribution Steel for Raft&
11.395 TopSSlab

11.395 10 100 168 1 11.395 1914 360 0617 .T|82 Distribution Steel For R.C.C.
Wall