Annexure F

DAUSA LALSOT KAUTHUN ROAD PROJECT


LIST OF HINDRANCE / OBSTRUCTION AS ON 30.09.2019
Length (mtr) Hindrance in Hindrance /
Sl. Ch. Ch.
No. From To Side Obstruction
MCW SR MCW SR Related To
District: Dausa, CALA: SDO-Dausa .
1 3+358 3+368 RHS 10 SR High mast light

2 3+780 3+800 RHS 20 SR Samadhi

Entry exite
3 5+190 5+195 LHS 5 Water Tank
section

4 5+980 5+990 LHS 10 SR Structure & Land

5 6+000 6+020 LHS 20 SR Boundry wall &


Land
Structure, Poles &
6 6+220 6+560 RHS 340 SR
Trees

7 6+960 7+040 LHS 80 SR Land & Structure

Entry exite
8 8+870 8+890 RHS 20 section STR

Land & Structure


9 15+340 15+500 LHS 160 Toll Plaza (Land for extra
lane)

Tube well (left


10 16+860 16+880 RHS 20 SR out)
11 18+850 18+940 LHS 90 SR Land
Total ( 0 to 19 ) 185 590
District: Dausa, CALA: SDO-Lalsot .
Structure-small
12 20+940 20+960 RHS 20 SR room

13 20+970 20+990 LHS 20 SR Temple

14 21+040 21+200 RHS 160 SR Land, Structure &


Electric pole
Structure & Land
15 21+600 21+650 LHS 50 MCW (Left out)

16 22+500 22+750 RHS 250 MCW Land

17 23+650 23+740 LHS 90 SR Structure (Left


out)
18 23+740 23+920 LHS 180 SR Land
19 23+920 24+000 LHS 80 SR STR

20 23+850 23+890 RHS 40 SR Structure


Annexure F
Sl. Ch. Ch. Hindrance /
No. From To Side Obstruction
MCW SR MCW SR Related To
District: Dausa, CALA: SDO-Dausa .

21 24+580 24+880 RHS 300 SR Land & Structure

22 27+100 27+210 LHS 110 MCW Land

23 27+740 28+140 LHS 400 MCW Land


24 27+740 28+140 RHS 400 MCW Land
25 27+980 28+010 RHS 30 SR Land
Structure (Water
26 28+100 28+120 RHS 20 SR tank)

27 30+520 30+770 RHS 250 MCW STR& Land

Total ( 19 to 34 ) 1460 940


28 34+180 34+220 RHS 40 SR Structure
29 34+650 34+900 LHS 250 50 MCW SR STR& Land
30 34+650 34+900 RHS 250 MCW HT LINE

31 34+830 34+920 LHS 90 SR Land

32 36+270 36+290 LHS 20 SR STR


33 41+100 41+420 LHS 320 MCW STR & Land
34 41+100 41+420 RHS 320 MCW STR & Land
35 42+600 42+680 LHS MCW Land
36 42+600 42+680 RHS MCW Land
37 48+100 48+200 LHS 100 MCW Land
38 48+100 48+200 RHS 100 MCW Land
Total ( 34 to 49 ) 1340 200
39 51+390 51+450 LHS 60 MCW STR
40 51+440 51+510 RHS 70 MCW STR
41 55+800 56+000 LHS 200 MCW STR & Land
Total ( 49 to 60 ) 330 0
Grand Total 3315 1730
DAUSA LALSOT KAUTHUN ROAD PROJECT
LIST OF HINDRANCE / OBSTRUCTION AS ON 31.05.2020
Sl. Ch. Ch. Length Hindrance / Obstruction
No. From To Side Mtr SR Related To
Khasra No. Str No. Name of Person Problem

District: Dausa, CALA: SDO-Dausa .


1 3+780 3+840 RHS 60 S.R Samadhi Samadhi
2 6+220 6+560 RHS 340 S.R Structure, Poles & Trees Ramji lal bairwa,etc Award done but disbursement pending
3 6+960 6+980 LHS 20 S.R Land & Structure 86/2 121 Kamlesh Sharma Award done but disbursement pending
4 15+470 15+485 LHS 15 MCW Structure Babu lal
Land & Structure (Land for
5 15+710 15+780 LHS 70 Toll Plaza extra lane) court stay

6 18+850 18+940 LHS 90 S.R Land 529/4 Disbursement done


but land owner not allowing to execute the work
Total ( From Km. 0 to Km. 19 ) 595
District: Dausa, CALA: SDO-Lalsot .

20+980 20+990 RHS 10 S.R

Structure no-177,178 & 179 report submit to SDM by


8 23+920 24+000 LHS 80 S.R STR Jagdish
Tehsildar

Total ( From Km. 19 to Km. 34 ) 90

14 34+830 34+920 LHS 90 S.R Land 1314 Mahadev Disbursement done


but land owner not allowing to execute the work

Total ( From Km. 34 to Km. 49 ) 90


Sl. Ch. Ch. Side Length SR Hindrance / Obstruction Khasra No. Str No. Name of Person Problem
No. From To Mtr Related To

Total ( From Km. 49 to Km. 83.453 ) 0


Hindrance length in Service Road 690 Rm

Hindrance length in MCW 15 Rm

Hindrance length in Drain 0 Rm

Hindrance length in Truck Lay Bye 0 Rm

Hindrance length in Toll Plaza 70 Rm

Total Hindered Length as on Date 775 Rm


v   Status of Utility Shifting – Electrical Lines & Water Pipe Lines.
Completed
Total
Sr. No. Particulars Unit Scope Till This
Previous Month

1 Electrical Poles Nos.


2202 2160 32

2 Transformers Nos.
87 80 4

3 Pipe line Length Rm.


20815 ### 69

4 Hand Pump Nos.


123 118

v   Status of Tree Cutting


Completed
Total
Sr. No. Particulars Unit Till This
Scope
Previous Month

1 Tree Cutting Nos. 2965 ### 33

STATUS OF RELOCATION OF RELIGIOUS STRUCTURES


Relocated
Total
Sr. No. Particulars Unit Scope Till This
Previous Month

1 Temples & Boundary Wall Nos. 18 12 2


2 Chabutara Nos. 7 6 1
3 Samadhi/ Mazaar Nos. 4 2 2
Status as on 30.06.20

Completed
Balance
Total

2192 10

84 3

20815 0

118 5

Completed
Balance
Total

2905 60

TURES
Relocated
Balance
Total

14 4
7 0
4 0