You are on page 1of 5

Material and labour cost List For CW

No Item Unit Unit Price Qty


1 For Excavation
Excavation work m3 7000 182.58

2 For PCC concrete


(a)Cement Bags 10,500 45
(b)Chipping Sud 120,000 3
(c)Sand Sud 25,000 1.5

3 For Foundation Concrete(1:1:2)


(i)Cement Bags 10,500 300
(ii)Chipping Sud 120,000 14
(iii)Sand Sud 25,000 7
(iv)Rebar Ton 1,130,000 3.5
(v)5ply wood Sheet 19,000 27
(vi)Timber wood (3"x2") Ton 850,000 2
(vii)Nail Viss 6,000 15
(viii)Binding wire Viss 6,000 25

4 For BTS & Power Pad Slab (1:1:2)


(i)Cement Bags 10,500 89
(ii)Chipping Sud 120,000 3.5
(iii)Sand Sud 25,000 2
(iv)Rebar Ton 1,130,000 1.65

5 For Tower erection


Tower erection fees 45,000 35

6 For Fence (wall and fence Beam)


Brick work Pcs 110 3500
Cement Bags 10,500 30
sand Sud 25,000 1
(i)Cement 10,500 30
(ii)Chipping 120,000 1
(iii)Sand 25,000 1
(iv)Rebar 1,130,000 0.1

7 Gravel filling Sud 120,000 2


Plastic sheet 30,000 1

8 Other
4'' PVC pipe Nos 30,000 3
4'' elbow socket Nos 3,500 6
2'' PVC pipe Nos 15,000 3
2'' elbow socket Nos 1,250 6
Cement Transport Car fee Nos 45,000 2
Rebar Transport Car fee Nos 45,000 1
Wooden,5ply wood,other materials Nos 45,000 1
Tarpaulin(for temporary water tank,cover for cement 80,000 1
Mixer machine rent fees Day 30,000 8
Vibrator Day
Water Gal
Labour fees log 6,000,000 1
t For CW
Amount Remark

1,278,060

7.59
472,500
360,000
37,500
-
- 33.13
3,150,000
1,680,000
175,000
3,955,000
513,000
1,700,000
90,000
150,000
-
- 9.833
934,500
420,000
50,000
1,864,500

-
1,575,000
-
-
385,000
315,000
25,000
315,000 3.6
156,000
12,500
113,000
-
240,000
30,000

-
90,000
21,000
45,000
7,500
90,000
45,000
45,000
80,000
240,000
-
-
6,000,000
-
-
26,660,060
33.13 9 298.17