CONSTANTINO, TRICIA MAE E.

BSCE-4A

PROJECT NAME

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


CONSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

ITEM NO.
A.1.1(3)
A.1.1(11)
A.1.2(5)
B.4(1)
B.7
B.9
1702(1)
1716(6)
1716(12)
1716(16)
404(1)a
404(1)b
405(1)b3
1710(5)
508(1)
B.9
NSTANTINO, TRICIA MAE E. BSCE-4A

PROJECT NAME

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


CONSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

DESCRIPTION
Construction of Field Office for the Engineer
Provision of Furnitures/Fixtures, Equipment & Appliances for the Field Office for the Engineer
Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the Engineer
Construction Survey and Staking
Occupational Safety and Health Program
Mobilization
Structure Excavation
Structural Steel Sheet Pile, Furnished 40m widel
Structural Steel Sheet Piles, Driven
Steel Sheet Test Piles, Furnished and Driven
Reinforcing Steel, (Grade 40)
Reinforcing Steel, (Grade 60)
Structural Concrete, fc'=27.58 MPA
Grouted Riprop,Class "A"
Handlaid Rock Embankment
Demobilization
PROJECT PROJECT PROJECT
DURATION START DATE END DATE

AGE SYSTEMS
VER
170 CD 02/21/2022 08/10/2022

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DURATION
QUANTITY START FINISH 1 2 3
# OF DAYS
1 15 28-Feb-22 10-Mar-22 XXXXXXXXXXX
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
0.32 3.18 25-Feb-22 28-Feb-22 XXXX
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
1 4 21-Feb-22 25-Feb-22 XXXXX
1,174 7.34 28-Feb-22 07-Mar-22 XXXXXXXX
4,764 6.2 08-Mar-22 14-Mar-22 XXX
4,764 29.78 08-Mar-22 06-Apr-22 XXXX
12 0.19 07-Mar-22 07-Mar-22 X
18,063 6.27 31-May-22 06-Jun-22
4,509 1.57 04-Jun-22 05-Jun-22
730 21.73 07-Jun-22 28-Jun-22
1,047 34.9 16-May-22 19-Jun-22
10,121 40.48 18-Apr-22 28-May-22
1 4 06-Aug-22 10-Aug-22
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
3 4 5 6 7 8 9 10 11 12 13 14

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXX
XXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
14 15 16 17 18 19 20 21 22 23 24 25

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL NO. OF WORKING DAYS : 120


NO. OF UNWORKABLE DAYS : 50
TOTAL NO. OF CALANEDAR DAYS : 170 CD

XXXXXXX
XX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX
###
###
###
###
###
######
###
###
###
###
###
###
25

XX
XX

XX

XX
CONSTANTINO, TRICIA MAE E. BSCE-4A

PROJECT NAME

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


CONSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

ITEM NO.
A.1.1(3)
A.1.1(11)
A.1.2(5)
B.4(1)
B.5
B.7
B.9
1702(1)
1716(6)
1716(12)
1716(16)
404(1)a
404(1)b
405(1)b3
1710(5)
508(1)
B.9
NSTANTINO, TRICIA MAE E. BSCE-4A

PROJECT NAME

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


CONSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

DESCRIPTION
Construction of Field Office for the Engineer
Provision of Furnitures/Fixtures, Equipment & Appliances for the Field Office for the Engineer
Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the Engineer
Construction Survey and Staking
Project Billboard / Signboard
Occupational Safety and Health Program
Mobilization
Structure Excavation
Structural Steel Sheet Pile, Furnished 40m widel
Structural Steel Sheet Piles, Driven
Steel Sheet Test Piles, Furnished and Driven
Reinforcing Steel, (Grade 40)
Reinforcing Steel, (Grade 60)
Structural Concrete, fc'=27.58 MPA
Grouted Riprop,Class "A"
Handlaid Rock Embankment
Demobilization
PROJECT PROJECT PROJECT
DURATION START DATE END DATE

AGE SYSTEMS
VER
170 CD 02/21/2022 08/10/2022

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DURATION
QUANTITY # OF DAYS START FINISH 1 2 3
1 15 28-Feb-22 10-Mar-22 XXXXXXXXXXX
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
0.32 3.18 25-Feb-22 28-Feb-22 XXXX
2 0.25 25-Feb-22 25-Feb-22 X
1 170 21-Feb-22 10-Aug-22 XXXXXXXXXXXXXXXXXXX
1 4 21-Feb-22 25-Feb-22 XXXXX
1,174 7.34 28-Feb-22 07-Mar-22 XXXXXXXX
4,764 6.2 08-Mar-22 14-Mar-22 XXX
4,764 29.78 08-Mar-22 06-Apr-22 XXXX
12 0.19 07-Mar-22 07-Mar-22 X
18,063 6.27 31-May-22 06-Jun-22
4,509 1.57 04-Jun-22 05-Jun-22
730 21.73 07-Jun-22 28-Jun-22
1,047 34.9 16-May-22 19-Jun-22
10,121 40.48 18-Apr-22 28-May-22
1 4 06-Aug-22 10-Aug-22

B.9 B.5, B.4(1)


1 4 CD
2 3.43 CD
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
3 4 5 6 7 8 9 10 11 12 13 14

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXX
XXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

1702(1) 508(1)
4 7
7.34 CD 40.48 CD

B.5, B.4(1) A.1.1(3), 1716(12) 1716(12), 1716(16) 1710(5)


3 5 6
3.43 CD 30 CD 14.94 CD 34.90 CD
A.1.1(11), A.1.2(5), B.7

170 CD
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
14 15 16 17 18 19 20 21 22 23 24 25

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

TOTAL NO. OF WORKING DAYS : 120


NO. OF UNWORKABLE DAYS : 50
TOTAL NO. OF CALANEDAR DAYS : 170 CD

XXXXXXX
XX
XXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
XXX
XXX

CRITICAL PATH
(RED LINE)

404(1)a, 404(1)b 405(1)b3 B.9


8 9 10 11
7.84 CD 21.73 CD 4 CD
###
###
###
###
###
######
###
###
###
###
###
###
25

XX
XX

XX

XX
PROJECT NAME

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


CONSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

ITEM NO.
A.1.1(3)
A.1.1(11)
A.1.2(5)
B.4(1)
B.5
B.7
B.9
1702(1)
1716(6)
1716(12)
1716(16)
404(1)a
404(1)b
405(1)b3
1710(5)
508(1)
B.9
PROJECT NAME

NSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS


NSTRUCTION OF RIVER/FLOOD CONTROL PROJECT ALONG DICAYO RIVER

DESCRIPTION
Construction of Field Office for the Engineer
Provision of Furnitures/Fixtures, Equipment & Appliances for the Field Office for the Engineer
Operation and Maintenance of 4x2 Pick Up Type Service Vehicle for the Engineer
Construction Survey and Staking
Project Billboard / Signboard
Occupational Safety and Health Program
Mobilization
Structure Excavation
Structural Steel Sheet Pile, Furnished 40m widel
Structural Steel Sheet Piles, Driven
Steel Sheet Test Piles, Furnished and Driven
Reinforcing Steel, (Grade 40)
Reinforcing Steel, (Grade 60)
Structural Concrete, fc'=27.58 MPA
Grouted Riprop,Class "A"
Handlaid Rock Embankment
Demobilization
TOTAL
WEEKLY PROGRESS TOTAL
COMMULATIVE PROGRESS
MS

###
DURATION
AMOUNT % WT 1 2 3 4 5 6 7
# OF DAYS
100.000% 0.20% 0.00201
462,625.56 15 1.00% 0.20%
196,288.00 170 0.43%
90.000% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085%
260,740.92 170 0.57% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113%
80.000% 0.150%
34,584.76 3.18 0.08%
6,568.90 0.25 0.01%
70.000% 0.057%
330,040.00 170 0.72% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143%
408,516.00 4 60.000%
0.89% 0.222%
270,155.77 7.34 0.59%
50.000% 0.130% 0.130%
890,571.73 6.2 1.93% 0.552% 0.552%
231,803.64 29.78 40.000%
0.50% 0.112% 0.112% 0.112% 0.112% 0.112%
4,299,744.74 0.19 9.33%
30.000%
49.1%
15,374,282.05 6.27 33.36%
3,491,492.77 1.57 20.000%
7.58%
65,107.68 21.73 0.14%
10.000%
5,071,826.97 34.9 11.00%
14,692,430.95 40.48 0.000%
31.88% 1 2 3 4 5 6 7 8 9
- 4
46,086,780.44 100.00%
0.770% 1.225% 50.4% 0.654% 0.453% 0.453% 0.453%
0.770% 1.995% 52.4% 53.1% 53.5% 54.0% 54.4%
DURATION (WEEKS)
8 9 10 11 12 13 14 15 16 17 18 19
Chart Title
0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085% 0.085%
0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113% 0.113%

0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143% 0.143%

5.320% 5.320%
4.825%
0.014% 0.014% 0.014% 0.014%
0.440% 0.440% 0.440% 0.440% 0.440% 0.440%
3.54% 3.54% 3.54% 3.54% 3.54% 3.54%
7 8 9 10 11 12 13 14 15 16 17 18 19 20 2

0.342% 3.884% 3.884% 3.884% 3.884% 4.324% 4.324% 6.102% 10.9% 0.796% 0.796% 0.356%
54.8% 58.7% 62.6% 66.4% 70.3% Row 2974.6% 79.0% 85.1% 96.0% 96.8% 97.6% 98.0%
20 21 22 23 24 25

0.085% 0.085% 0.085% 0.085% 0.085% 0.085%


0.113% 0.113% 0.113% 0.113% 0.113% 0.113%

0.143% 0.143% 0.143% 0.143% 0.143% 0.143%

19 20 21 22 23 24 25

0.342% 0.342% 0.342% 0.342% 0.342% 0.342% 100.0%


98.3% 98.6% 99.0% 99.3% 99.7% 100.0%