Page 1 C:\Users\USER\Desktop\PLC Works\FINAL PROJECT TEST.

PC7 (Date Printed: 2022/9/23)


ELEVATOR FIRST START AND GROUND FLOOR + ALL ELEVATOR MOVEMENT DOWNWARDS
GR - GROUND REQUEST GS - GROUND STOP (OTHERS ARE RELAYS FOR SWITCHING)

E_DOOR_OPENS E_MOVES_DOWN

INBETWEEN FLOOR REQUESTS AND ELEVATOR MOVEMENT UPWARDS

FLOOR 1
Page 2 C:\Users\USER\Desktop\PLC Works\FINAL PROJECT TEST.PC7 (Date Printed: 2022/9/23)

E_DOOR_OPENS E_MOVES_UP

FLOOR 2

FLOOR 3

FLOOR 4
Page 3 C:\Users\USER\Desktop\PLC Works\FINAL PROJECT TEST.PC7 (Date Printed: 2022/9/23)
FLOOR 5

FLOOR 6

ELEVATOR DOOR OPENING

E_DOOR_TIME

E_MOVES_UP
E_MOVES_DOWN

E_MOVES_DOWN
E_MOVES_UP

E_MOVES_UP
E_MOVES_DOWN

E_MOVES_DOWN
E_MOVES_UP

E_MOVES_UP
E_MOVES_DOWN

E_MOVES_DOWN
E_MOVES_UP

E_MOVES_UP
E_MOVES_DOWN
Page 4 C:\Users\USER\Desktop\PLC Works\FINAL PROJECT TEST.PC7 (Date Printed: 2022/9/23)

E_DOOR_OPENS

E_DOOR_OPENS E_DOOR_TIME

EMERGENCY SHUTDOWN SWITCH AND RESET