REVISED RULES AND STANDARDS FOR ECONOMIC AND SOCIALIZED HOUSING PROJECTS
TO IMPLEMENT BATAS PAMBANSA BLG. 220
RULE I
GENERAL PROVISIONS
RULE II
MINIMUM DESIGN STANDARDS AND REQUIREMENTS FOR ECONOMIC AND SOCIALIZED
HOUSING PROJECTS
B. Planning Considerations
1. Area Planning
Project design should consider cost reduction and future improvement/expansion, integrate land
allocation and alignment with existing networks, and follow DPWH specifications for lot sizes, right-of-
way, open space, and common uses.
2. Site Preservation/Alteration
a. Slope
Grading and ditching should be done to prevent erosion and flooding, with slopes and grades to
prevent depression.
b. Preservation of Site Assets
Trees with a diameter of 200 mm or more, shrubs and desirable ground cover must be preserved,
and good quality top soil must be preserved for finishing grades of yards, playgrounds, parks and
garden areas.
c. Ground cover materials must be planted to provide permanent cover.
3. Easements
Subdivision projects must comply with the provisions of the Water Code of the Philippines, NPC, fault
traces identified by PHIVOLCS, right-of-way of other public companies, and adequate easement for
roads abutting national roads. Other related laws must also be observed.
4. Circulation
The road network should serve the subdivisions as one integrated unit, with roads and pathwalks aligned
to facilitate movement. Streets should conform to the contours of the land, provide major street extension,
minimize critical intersections, and conform to civil work design criteria.
C. Design Parameters
1. Land Allocation
a. Saleable Areas
There shall be no fixed ratio between the saleable portion and non-saleable portion of a subdivision
project.
b. Non-saleable Areas
Non-saleable areas must comply with minimum requirements for open space, including circulation,
community facilities, and parks and playgrounds.
4. Shelter Component
a. Floor Area Requirement
The minimum floor area requirement for single-family dwelling shall be 22 square meters for
economic housing and 18 square meters for socialized housing.
5. Setback/Yard
The minimum setback of dwelling unit both for economic and socialized housing project shall be
as follows:
a. Front Setback 1.5 m.
b. Side yard 1.5 m (from the building line)
c. Rear yard 2.0 m.
d. Abutments May be allowed per requirements of the National Building Code of the Philippines
6. Water Supply
Each lot and/or living unit must be served with water connection, and that the water supply
provided by the local water district must be potable and adequate. The minimum quantity
requirement is 150 liters per capita per day, and each subdivision must have at least an
operational deep well and pump sets with sufficient capacity to provide average daily demand
(ADD). Additionally, the Local Government Unit must provide each community with fire
hydrants and a cistern that are operational at all times, and for a multi-storey building, a water
tank must be provided if the height of the building requires pressure in excess of the main water
line.
9. Drainage System
The drainage system of a subdivision must be durable and of approved installation practices,
with a minimum of a concrete lined canal with load bearing cover.The owner/developer must
provide a catchment area and underground drainage system with adequate RCP, catch basins,
manholes/inlets and cross drains in the locality.
2. Building Design Standards (Applicable for both Economic and Socialized Housing)
a. Dwelling structures must be designed to provide maximum living comfort and safety for one
family.
b. Ceiling Heights
1) Minimum ceiling height for habitable rooms must be measured from the finished floor line to
the ceiling line, and a minimum headroom clearance of 2.0 meters must be provided.
—------------- SEE FIG. 5: MINIMUM CEILING HEIGHTS (PDF PAGE 31)
2) Mezzanine floors must have a clear ceiling height of 1.80 meters and not cover 50% of the
floor area below it. (See Fig. 6: Mezzanine Floor)
3) Interior Stairs
Stairs must provide structural safety and adequate headroom for furniture passage.
—------------- FIG. 10: FIREWALL FOR DWELLING UNITS ON PROPERTY LINE (PDF PAGE
35)
B. Multi-Family Dwellings and Condominiums (Applicable for both Economic and Socialized
Housing)
1. Lot Planning
a. Direct vehicular access to the property must be provided through an improved public street.
b.Access to dwellings must be provided without trespassing, maintenance must be done without
trespassing, utilities and service facilities must be independent.
c. Access to living units.An independent means of access must be provided to each living unit.
d. Non-residential use. Nonresidential use can be allowed if it is harmonious with the residential
character of the property, including hallways and corridors.(See Fig. 11: Non-Residential Use)
—------------- FIG. 12: DISTANCE BETWEEN 2-STOREY BUILDINGS (PDF PAGE 37)
The minimum distance between two buildings with 3 or 4 storeys must be 6.0 meters and the
minimum horizontal clearance between the two roof eaves must be 2.0 meters.
—------------- FIG. 13: DISTANCE BETWEEN 3 - STOREY BUILDINGS (PDF PAGE 38)
The minimum distance between buildings with more than 4 storeys is 10 meters and the
horizontal clearance is 6.0 meters, but in cases where the two sides are blank walls, it is 2.0
meters and the horizontal clearance is 1.0 meters.
—------------- FIG. 14: DISTANCE BETWEEN BLANK WALLS OF TWO BUILDINGS (PDF
PAGE 38)
The measurement of distance between two buildings should be made at the shortest point, as
seen in Fig. 15.
6) Elevator Requirements (If Applicable) (Amended per Board Res. No. 824, Series of 2008)
Elevators are required for buildings 6 storeys and beyond, and must comply with the National
Building Code, Accessibility Law, National Industry Standards and Fire Code.
Section 7. Variances/Exemptions
Variances from standards and requirements may be granted if they do not cause unnecessary
hardship due to regional considerations, location, and other factors.
2. A set of the following documents duly signed and sealed by a licensed geodetic engineer:
A. Vicinity map showing land uses, access, facilities, and utilities within 500 meters of
project boundaries, drawn to any convenient scale.
B. Topographic plan to include existing conditions as follows:
a. Boundary sewers, gas lines, fire hydrants, electric and telephone poles and street
lights must be within/adjacent of the reference or tie point (BLLM #).
b. Streets, easements, width and elevation of right-of-way within project and
adjacent areas.
c. The most important details are the location, size and elevations of sanitary and
storage facilities.
d. Ground elevation should be indicated at all breaks in grade, along drainage
channels, and at selected points not more than 25 meters apart. Contours with an
interval of 0.50 meter should be indicated for slopes over 2%.
e. Watercourses, marshes, rock and wooded areas, preservable trees, houses, barns,
shacks, and other significant features are present.
f. Proposed public improvements are major improvements planned by public
authorities for future construction within/adjacent to the subdivision.
C. Survey plan of the lot(s) as described in TCT(s).
3. At least 2 copies of certified true copy of title(s) and current tax receipts
4. Right to use or deed of sale of right-of-way for access road and other utilities when applicable,
subject to just compensation for private land.
Approval of the Preliminary Subdivision Development Plan will be valid only for a period of
180 days from date of approval.
a.A licensed civil engineer must sign and seal at least two copies of a road design/plan, including
a profile, roadway sections, and structures.
b. At least 2 copies of storm drainage and sanitary sewer system must be signed and sealed by a
licensed engineer or civil engineer. The profile shows the hydraulic gradients and properties of
drainage lines and structures.
C. At least 2 copies of a site grading plan with finished contour lines superimposed on the
existing ground must be signed and sealed by a licensed civil engineer.
4. At least two copies of water system layout and details must be signed and sealed by a licensed
engineer or civil engineer.
5. Certified true copy of tax declaration covering the property(ies) subject of the application for
the year immediately preceding;
6. Zoning Certification from HLURB Regional Office.
7. Certified true copy of DAR Conversion Order.
8. Certified true copy of Environmental Compliance Certificate (ECC) or Certificate Of Non-
Coverage (CNC), whichever is applicable, duly issued by the DENR;
9. At least 2 copies of project description for projects having areas of 1 hectare and above to
include the following:
a. Project profile indicating the cost of raw land and its development (total project cost),
amortization schedule, sources of financing, cash flow, architectural scheme, if any, and work
program;
b. Audited financial statement for the last 3 preceding years;
c. Income Tax Return for the last three 3 preceding years;
d. Certificate of registration with Securities and Exchange Commission (SEC);
e. Articles of incorporation or partnership;
f. Corporation by-laws and all implementing amendments, and
g. For new corporations (3 years and below) statement of capitalization and sources of income
and cash flow to support work program.
10. Plans specifications, bill of materials and cost estimates duly signed and sealed by the
appropriate licensed professionals.
11. Application for permit to drill from the National Water Resources Board (NWRB).
12. Traffic impact assessment for projects 30 hectares and above.
13. List of names of duly licensed professionals who signed the plans and other similar
documents in connection with application filed indicating the following information:
a. Surname;
b. First name;
c. Middle name;
d. Maiden name, in case of married women professional;
e. Professional license number, date of issue and expiration of its validity; and
f. Professional tax receipt and date of issue
g. Taxpayer’s identification number (TIN)
Subdivision projects must comply with the approved Comprehensive Land Use Plan and Zoning
Ordinance, and a Development Permit must be issued upon payment of the processing fee.
Surveys and survey returns must be submitted to the LMS for verification and approval.
Section 11. Evaluation of Land Development and Structural Design Components of Project
The Board will determine if the land development scheme and building design are in compliance
with the Rules.
B. Additional Requirements
1. Master deeds with registration and restrictions must be accompanied by a certified copy from
the Register Of Deeds.
2. For subdivision projects:
a. Two copies of Verified Survey Returns with label for all non-saleable areas including but not
limited to parks and playgrounds, community facilities and roads and easements;
b. Copy of the following documents in case the Development Permit was issued by the Local
Government Unit (LGU) pursuant to the 1991 Local Government Code and related issuances:
1) Sangguniang Resolution/Ordinance granting of Development Permit/Subdivision
Development Plan containing the following information:
a) Full name of the grantee or permittee and his address;
b) Complete project name and its location;
c) Date of the resolution or ordinance;
d) Project area;
e) Full listing of title(s) covering the project;
f) Legal basis of the approval (PD 957, BP 220, EO 648 and other related laws)
3) Proof of compliance to Section 18 of RA 7279 (for BP 220 projects whose selling price is
above the maximum selling price of socialized housing project) must include a Development
Permit, License to Sell of socialized housing project, Joint venture agreement with LGU or other
housing agencies, and certified true copy of bond issued by the LGU or other housing agencies.
The minimum selling price of socialized housing projects must not exceed the maximum selling
price of the project.
4) Topographic Plan
c. Project study
d. Copy of brochures and other form of advertisements.
Section 15. Notice of Publication (Per Board Res. No. R-764,Series of 2004)
The Board must publish a notice on application for Certificate of Registration in one newspaper
of general circulation, in English or in Pilipino, reciting that an application for registration
statement for the sale of subdivision lots and condominium units has been filed with the Board.
Additionally, a 3' x 6' billboard notice of the project must be posted on the project site until the
issuance of the license to sell. Failure to publish the notice within two weeks, the
owner/developer must re-file the application for Certificate of Registration.
Section 16. Certificate of Registration (Per Board Res. No. R-764,Series of 2004)
The Board will issue a Certificate of Registration after five days from the completion of the
publication and upon submission of an affidavit of publications, if there is no opposition to the
Registration of the project.
Section 17. License to Sell (Per Board Res. No. R-764,Series of 2004)
The Board will issue a license to sell a disposable subdivision lot or condominium unit in a
registered property within 2 weeks of registration. The owner or developer must submit a work
program, performance bond and payment of the prescribed license fee to the Board.
Documentary requirements must be submitted to prove the proposed sale is not fraudulent.
The Performance Bond required may be in any of the following forms or a combination thereof:
A. A surety bond of 10% of the development cost of the unfinished portion of an approved plan
is acceptable to the Board.; or
B.The Republic of the Philippines is the mortgagee of a property other than the subject of the
application, free from any liens and encumbrance. The value of the property must be at least 10%
of the total development cost.; or
C. Forms of security equivalent to 5% of the development cost of the unfinished portion of the
approved plan must include Cash Bond, fiduciary deposit, certificate of guaranty deposit, letter
from any bank of recognized standing, irrevocable credit line, and refinancing restructuring
program.
Section 20. Conformance to the Requirements of Other Pertinent Laws, Rules and Regulations
Presidential Decree No. 957 and its Implementing Rules are adopted in these Rules.
1. Application for approval of condominium projects
2. Registration of real estate dealers, brokers and salesmen
3. Submission of Semestral Reports on Operations
4. Display of Certificate of Registration and License to Sell
5. Lost or Destroyed Certificate of Registration or License to Sell
6. Advertisement
7. Time of Completion
8. Transfer of ownership or change of name
9. Alteration of Plans
10. Non-Forfeiture of Payments
11. Registration of Conveyance
12. Mortgages
13. Complaints against owners, developers, dealers, brokers, salesmen
14. Administrative fines
15. Criminal penalties
16. Take-over Development
17. Fees
18. Identification of lot subject of sale