You are on page 1of 10

TPM461

Komplesi dan Kerja Ulang Sumur


Wijoyo Daton
Completion

Completion is a mean of designing, selecting and installation of


tubular goods, tools and other equipment into the wellbore in
order to flow, pump or control production or injection rate
Completion Milestone

1st extensive
1st oil well Casing Standardization casing program

1814 1880 1890

1300 1861 1882 1905

Caspian Sea well 1st blowout Packer Developed 1st cemented casing
Completion Milestone

1st electric log


1st gas lift API standard for tool joint

1911 1925 1927

1910 1913 1926 1930

Drillpipe introduced 1st dual completed well 1st ESP Well depth
exceed 10.000 ft
Completion Milestone

1st coiled tubing


1st gun perforation Through tubing workover

1933 1958 1963

1932 1943 1960 1967

1st gravel pack 1st subsea compeltion Cement Bond Log Computerized well
developed monitoring

As deeper wells were drilled, the problems associated with surface water prompted the use of a casing or conduct
or to isolate water and prevent caving of the wellbore walls. Further development of this process led to fully cased
wellbores in which the interval of interest is perforated
Well Completion

Completion fluid is pumped Well testing

Logs are run Treating the payzone

Remedial cementing Equipment installation

Perforating Putting the well on stream


and assessing performance
Requirements

1 Safe
3 basic
requirements in
completing a well
2 Efficient

3 Reliable

In short, it is the technical efficiency of the entire completion system, viewed alongside the
specific company objectives, which ultimately determines the completion configuration and
equipment used
Well Phase Cost
Well Lifetime

Schlumberger, 2010
Thank you

You might also like