Professional Documents
Culture Documents
Invigilator’s Signature
(SREDA)
Power Division, Ministry of Power, Energy and Mineral Resources
Important Instruction:
1. This Paper has 50 MCQs + 8 Short Questions + 6 Long Questions = Total 64 Questions.
2. Mark indicated on the right side of each question.
___________________________
3. Fill in correct circle with permanent ink ballpoint pen shown on the top sheet only
Invigilator’s Signature
corresponding to the MCQ given in Section A.
4. Answer in the blank space provided after each question (short/long).
5. Do not put any sign or write anything on the answer script except written answer.
6. Any unfair means, peer talking, keeping any communication device and misbehavior will
lead to cancellation of examination.
1 18 35
2 19 36
3 20 37
4 21 38
5 22 39
6 23 40
7 24 41
8 25 42
9 26 43
10 27 44
11 28 45
12 29 46
13 30 47
14 31 48
15 32 49
16 33 50
17 34
MCQ : [ ]
Short Question : [ ]
Long Question : [ ]
Total Marks : [ ] Signature of Examiner
P1 A (Page 1 of 24)
P1 A (Page 2 of 24)
Section A: MCQ
Fill the appropriate circle in the OMR answer sheet at the top page.
1 x 50 =50
1 An electric kettle has a resistance of 30 Ω and it is connected to a 220 V supply. What
is the power rating (kW) of the kettle?
A) 1.61 C) 2.0
B) 1.5 D) 1.0
B) odometer D) hygrometer
3 The most of the primary energy consumption by the world comes from
B) oil D) nuclear
A) Plan-Do-Check-Act C) Plan-Do-Check-Achieve
B) Performance-Do-Check-Achieve D) Perceive-Design-Check-Achieve
8 For a particular project, PERT estimates the time to completion of the project as 6
months more likely, 13 months pessimistically and 5 months optimistically. What is
the expected time to completion of the project?
A) 7 months C) 8 months
B) 6 months D) 5 months
9 Which of the following is usually not included in the direct cost of a project?
P1 A (Page 3 of 24)
10 Which of the following is related to certification of energy management system?
B) ISO-45000 D) ISO-45001
11 What is the energy efficiency calculated from the following energy balance diagram?
A) 0.225 C) 1.0
B) 0.775 D) 0.525
B) 15 D) 10
A) 1 day C) 7 Days
B) 3 Days D) 15 days
14 What is the world benchmark energy consumption (mmscf/ton of urea) for urea
manufacturing?
A) 20 C) 30
B) 25 D) 44
15 How much power generation potential (kW) is available in a run of river mini
hydropower plant for flow of 40 litres/second with a head of 12 metres? Assume
system efficiency of 60%.
A) 2.8 C) 4.8
B) 1.4 D) 288
16 25. What is the net calorific value of methane (CH4) in kJ/kg, if the Gross Calorific
Value of methane is 890 kJ/mol and the heat of vaporization of water is 44 kJ/mol?
A) 44,556 C) 40,000
B) 50,000 D) 45,500
P1 A (Page 4 of 24)
19 Direct Current (DC) is
A) Watt C) Amp
B) Volt D) Mho
A) W-h C) W or kW
B) Volt D) A-h
23 A 70W fan PF 0.7, runs for 10h/day in a 230V line taking current 0.5A from supply.
Power consumption of the fan per day is
A) >800W C) =800W
24 In Fahrenheit Scale, freezing and boiling temperature in degree at air pressure are
A) 212 C) 76
B) 100 D) 0
A) 0.5 C) 1.5
B) 1 D) 2
A) 2400J/kg°C C) 2300J/kg°C
B) 4200J/kg°C D) 3200J/kg°C
P1 A (Page 5 of 24)
30 Heat is transferred from hot to cold body by
A) 5 primary modes C) 3 primary modes
A) air C) solid
B) gas D) liquid
B) 60% calcium nitrate and 40% sodium D) 60% potassium nitrate and 40%
nitrate calcium nitrate
B) sunlight, bio-mass, sea-tide, wave etc. D) natural gas, falling water, crude oil etc.
B) 26-30% D) 41-45%
P1 A (Page 6 of 24)
41 For the below project network diagram, critical path is
A) A – B – D – E – H – I C) A – C – F – G – H – I
B) multimeter D) thermo-anemometer
A) Tachometer C) Voltmeter
B) Ammeter D) Multimeter
A) reduce energy per unit production C) support all kind of energy resources
regardless of social impact
A) y2 = a2 + b2x C) y = ax + b
B) y = ab + cx2 D) y = ax + bx2 + c
P1 A (Page 7 of 24)
Section B: Short Question
Marks
o o
01 Five kg water is to be heated from -10 C to 200 C at atmospheric 5
pressure. How much heat in kJ is required? List all assumptions, if any.
[Given: Specific Heat for ice, liquid water and water vapor are 2.1 kJ/kg,
4.2 kJ/kg and 2.1 kJ/kg respectively. Latent heat of melting and latent heat
of vaporization are 334 kJ/kg and 2265 kJ/kg, respectively]
P1 A (Page 8 of 24)
03 List ten equipment used in energy audit work. 5
P1 A (Page 9 of 24)
05 What is energy? State the relationships of work, energy and power with 5
examples.
P1 A (Page 10 of 24)
06 A 3phase water pump motor’s measured parameters are 400V, 7 Amp and
5
0.8 PF. Find monthly energy consumption of machine running 2h/day.
P1 A (Page 11 of 24)
08 In a textile mill, an evaporator concentrates a liquor containing solids of
6% by w/w to produce an output containing 30% solids w/w. Calculate 5
the evaporation of water per 100kg of feed to evaporator?
P1 A (Page 12 of 24)
Section C: Long Question
Marks
01 Work Breakdown Structure (WBS) is the process of dividing complex 10
projects to simpler and manageable tasks. The project managers use this
method for simplifying the project execution. The WBS to manufacture a
component consisting of part X and Y is given below. Draw the project
network diagram and find the time to complete the project using CPM
method.
P1 A (Page 13 of 24)
02 A fuel gas containing 95 mole% methane and the balance ethane is burned 10
completely with 25% excess air. The stack gas leaves the furnace at 900
o
C and is cooled to 450oC in a heat exchanger in which heat lost by
cooling gases is used to produce steam from liquid water for heating,
power generation, or process applications. Perform the following:
a) Taking as a basis of calculation 100 mol of the fuel gas fed to the
furnace; calculate the amount of heat (kJ) that must be transferred from
the gas in the waste heat boiler to accomplish the indicated cooling.
b) How much saturated steam at 50 bar can be produced from boiler
feedwater at 40oC for the same basis of calculation? (Assume all the heat
transferred from the gas goes into the steam production.) [necessary data
tables are attached]
P1 A (Page 14 of 24)
P1 A (Page 15 of 24)
03 Energy consumption and production data collected for furnace in a 10
foundry over a period of 18 months. During month 9, a heat recovery
system was installed. Using the plant monthly data and CUSUM
techniques, estimate the savings made with the heat recovery system. The
plant data is given in Table for Q-03:
P1 A (Page 16 of 24)
04 a) What is a project? Briefly describe Project Development Cycle (PDC) 5+5
steps.
b) “Gantt Chart is a tool for displaying the progress of a project” –
explain. What is the limitation of Gantt Chart?
P1 A (Page 17 of 24)
P1 A (Page 18 of 24)
05 a) Briefly Describe Plan-Do-Check-Act (PDCA) cycle. 5+5
b) A 3phase 10kW motor has actual input 415V, 12 A, and 0.7PF when
measured during motor running. If the nameplate details of the motor are
415V, 18.2A and 0.9PF, find out the motor loading and the actual input
power of the motor.
P1 A (Page 19 of 24)
06 Using the given data in the activity table, 2x5
P1 A (Page 20 of 24)
P1 A (Page 21 of 24)
Data Table -01: Specific Enthalpies of Selected Gases: SI Units
26/8/2019
34
P1 A (Page 22 of 24)
Data Table -02: Properties of Saturated Steam: Temperature Table
26/8/2019
36
26/8/2019
35
P1 A (Page 23 of 24)
P1 A (Page 24 of 24)