NDE REQUEST FORM RT PT  UT MT HT SR

Request No : GS-DPT-166 Location : Maintenance of Tank, Vessels & Project : JO/SC459/MM19


Welding Services

Date: 11-May-23 Area : GS YARD Activity : FINAL DP EXAMINATION Criteria ASME B31.3 ED-2020

NDE Welder Joint No. /


S. NO Tag No/ Line No Size Rating Type Material Remarks
Class No Nozzle No.

1 2"-F-0138-AS ( 11 V002) 100% - FLG-1 2" 150# FACE CS PIPE-1

2 2"-F-0138-AS ( 11 V002) 100% - FLG-2 2" 150# FACE CS TEE-1

3 2"-F-0138-AS ( 11 V002) 100% - FLG-3 2" 150# FACE CS PIPE-2

4 6"-E-0013-BS (11 V002) 100% - FLG-1 6" 150# FACE CS PIPE-4

5 6"-E-0013-BS (11 V002) 100% - FLG-2 6" 150# FACE CS PIPE-4

6 6" LEVEL BRIDLE (11 V002) 100% - FLG-1 1" 150# FACE CS END CAP-1

7 6" LEVEL BRIDLE (11 V002) 100% - FLG-2 2" 150# FACE CS PIPE-6

8 6" LEVEL BRIDLE (11 V002) 100% - FLG-3 2" 150# FACE CS PIPE-8

10 6"-E-0113-AS (11 V002) 100% - FLG-1 6" 150# FACE CS ELBOW-1

11 6"-E-0113-AS (11 V002) 100% - FLG-2 6" 150# FACE CS ELBOW-2

NOTE : FINAL DP EXAMINATION FOR FLANGE SERRATION SURFACES.


Requested by Reviewed by Approved by

Name A.SAM RAJA

Signature

Date 11-May-23
RT=RADIOGRAPHIC TEST PT=PENETRANT TEST UT=ULTRASONIC TEST MT=MAGNETIC PARTICLE TES
HT=HARDNESS TEST PWHT=POST WELD HEAT TREATMENT
Format No.: JO/SC459-QCF-048, Rev.0