Professional Documents
Culture Documents
3 No’s for 4” NPS pipe diameter (Nozzle Joints: N2-J1, J2, J3 & VB) Neck to Flange, Shell, RF
Pad and Vortex breaker joints.
The thermocouples shall be placed in soaking band and gradient band.
Soaking band shall cover complete nozzle.
Approved by QC Engineer
Post Weld heat treatment of the above vessel / item / component / has been carried out in accordance
with this instruction and the Chart is enclosed. Also enclosed are the calibration certificate of Time versus
temperature Chart recorders and Conformity certificate for thermocouples.