You are on page 1of 1

TRAINING EVALUATION QUESTIONNAIRE

OPERATION OF EARTH
Topic of Training :
TESTER & TESTING OF
EARTHING PITS
Type of Training : SOP Training Revision No. : 01

Name of the Employee : Department : Engineering

Total Marks: : 10 Time : 15 Minutes

1. Distance between two electrodes from earth pit should be 20 meters.


a. True
b. False
(2)

2. SOP stands for


a. Standard Operating Procedure
b. Standard Operation Process
c. Standard Of Process
d. None of them
(2)
3. After the reading gets stabilize, the value of resistance should be
Less than……ohm?
a. Two
b. Four
c. Five (2)
d. None of the above

4. If the reading is more than 2 ohm, then pour…….and salt solution


to build the required earth resistance?
a. Oil
b. Water (2)
c. HSD
d. None of the above

5. Frequency of checking the resistance of Earth pits is ?


a. Annually
b. Quarterly (2)
c. Half yearly
d. None of the above

(Qualification mark is NLT 80 % of Total Marks)