The daily HSE report from the Dammam Independent Sewage Treatment Plant project provides an update on activities in progress across various locations, including excavation, rigging, hot work, and steel fixing, noting that work is satisfactory except for housekeeping in the laboratory. No incidents or near misses were reported and the weather was clear with a temperature of 22°C. Housekeeping inside the laboratory was poor and the EPC team was informed to clean it.
The daily HSE report from the Dammam Independent Sewage Treatment Plant project provides an update on activities in progress across various locations, including excavation, rigging, hot work, and steel fixing, noting that work is satisfactory except for housekeeping in the laboratory. No incidents or near misses were reported and the weather was clear with a temperature of 22°C. Housekeeping inside the laboratory was poor and the EPC team was informed to clean it.
The daily HSE report from the Dammam Independent Sewage Treatment Plant project provides an update on activities in progress across various locations, including excavation, rigging, hot work, and steel fixing, noting that work is satisfactory except for housekeeping in the laboratory. No incidents or near misses were reported and the weather was clear with a temperature of 22°C. Housekeeping inside the laboratory was poor and the EPC team was informed to clean it.
Cloudy ☐ Stormy ☐ Clear ☒ Cold ☐ Hot ☐ Rainy ☐ 22o C Dammam
Sr.# Activities in Progress Locations Remarks
a) Inlet Headwork b) Chlorine Contact Tank 1 Excavation Satisfactory c) Secondary Clarifier D d) Biological Tank A&B a) Material Yard 2 Rigging b) Balancing Tank Satisfactory c) Primary Clarifier D a) Warehouse Hot Work 3 b) Balancing Tank Satisfactory (Welding, Grinding & Cutting) c) Material Yard 4 Working at Height a) Primary Clarifier D Satisfactory a) Balancing Tank 5 Steel Fixing & Shuttering b) Biological Tank D Satisfactory c) Primary Clarifier D 6 Road Work a) All Site Area Improved & In Progress 7 Scaffold Erecting a) Primary Clarifier D Satisfactory a) Primary Clarifier D 8 Work at night Satisfactory b) Material Yard 9 Housekeeping a) Laboratory Not Satisfactory (1)
Incident: Location Description
No Near Miss No HSE Violation: No Other: 1- Poor housekeeping inside the laboratory: EPC team has been informed to clean it.