CHECK LIST FOR PRE-CONCRETE

PROJECT: PUNE METRO RAIL PROJECT (MAHA METRO RAIL PROJECT)


DOC. No.: SW-PMRP-ICL-PRECON-003
REV. No.: 00
Page No: 1 of 2
GENERAL
a) Structure :
b) Location :
c) Part of structure :
d) Pouring method :
e) Cast level : to RL.
f) Date :
g) Drawing no. :
h) Estimated pouring time :
i) Grade of concrete :
j) Quantity of concrete :
SURVEY
a) Reference approved :
b) Lay out : sketch is drawn in register yes/ no
Approved : yes/ no
: yes/
c) Level checked no

REINFORCEMENT
: submitted –
a) Bar bending schedule yes/no
Approved – yes/
no
b)Tied as per BBS and Drawing - :yes/ no
c) Anti-corrosive treatment done :yes/ no
: yes/
d) Chairs/ spacers provided no
: yes/
e) Cover blocks provided no
f) Quantity :

FORMWORK
a) Dimensions :as per drawing – yes/ no
b) Alignment : OK/ to be corrected
c) Verticality : OK/ to be corrected
d) Leveling : OK/ to be corrected
: yes/
e) Weep holes provided as per drg. no

CHECKED BY - (Date & Sign) WITNESSED BY - (Date & Sign)


STERLING AND WILSON PVT. LTD. CLIENT REPRESENTATIVE
CHECK LIST FOR PRE-CONCRETE

PROJECT: PUNE METRO RAIL PROJECT (MAHA METRO RAIL PROJECT)


DOC. No.: SW-PMRP-ICL-PRECON-003
REV. No.: 00
Page No: 2 of 2

f) Vibratory equipment : provided – yes/ no


: OK/ to be
g) Supports corrected
h) Cleanliness & shuttering Oil : OK/ Not OK

GENERAL ARRANGEMENTS
: OK/ to be
a) Access corrected
: yes/
b) Lighting provided no
c) Communication system : provided – yes/ no
: yes/
d) Safety measures taken no
: OK/ to be
e) General cleanliness improved
f) Stock of material : sufficient/ not sufficient
g) Staff responsible :
h) Labour : sufficient/ to be improved
: available – yes/
I) Stand by equipment no
REMARKS :

CHECKED BY - (Date & Sign) WITNESSED BY - (Date & Sign)


STERLING AND WILSON PVT. LTD. CLIENT REPRESENTATIVE