T-TS-05-001 Technical Schedules
400kV s.c. Transmission Lines 4xACSR-Tern Page 1 of 12 Date: 10/25/2021
A.3 The services of a competent field service engineer or technician is required under this contract.
B.2 Quantities
B.2.1 The quantities of insulators and its accessories required under this contract
are indicated in the Schedule of Quantities
B.3 Technical Characteristics and Requirements
The Employer's requirements are indicated below. The Contractor shall
indicate their data corresponding to the said Employer's requirements to
facilitate evaluation and to compare Contractor's compliance to the
specifications.
22. Provided with the required suspension clamp(s) and attachment to the
type of structure mentioned above (Yes, No) Yes
2.Type (Specify AC or DC & Fog type or Standard type) AC, Fog type
3. Standard specification applied Refer T-SS-006-001
4.Class and Type (kN)
Specify
- tension sets
- supension sets Specify
All damages caused to public roads, streets or public structures shall be compensated by the Contractor
at his own expense. Contractor’s Data
B.6.2 Packing
a. Each crate, box or package must have a packing list and in addition to the
usual and customary marks, the following identifying marks shall be
included:
1. Client Name
B.8.2 For disc type suspension and tension insulators, the Employer’s requirement is based on IEC standards.
For a complete assembly, the total leakage distance is given and the Contractor may submit a different
number of units in a string provided that the total leakage distance requirement can be met.
Component: Effect:
Contractor's Exception:
D.2 Clarifications
D.2.1 The Contractor may, but is not required to, provide clarification to his Submission in the space provided
or on a properly identified attached sheet.
Contractor's Clarification: