Professional Documents
Culture Documents
0
T-TS-07-001 Technical Schedules
400kV s.c. Transmission Lines 4xACSR-Tern Page 1 of 12 Date: 10/26/2021
A.3 The services of a competent field service engineer or technician is required under this contract.
(is, is not)
Employer's
Contractor's Data
Requirement
B. TECHNICAL DATA
e) Degree of Contamination (Equiv. Salt deposit density, mg/cm2) Heavy to Very Heavy
Design Wind Velocity:
a) Maximum design wind, 3s gust, factored according to IEC 60826 40m/s
f) b) Exceptional design
wind, 3s gust, factored according to IEC 60826
Terrain category: "B", according to IEC 60826
g) Anticipated Contamination Sources During transport and storage Sea Salt
1. Type Stockbridge
2. Material steel, aluminium alloy
3. Applied Conductor ACSR-Tern
4. Damper Weight Specify
30m to 60m, in
3. Spacing
appropriate spans
4. Armor rod required (Yes, No) Yes
B.3.3 Hardware - Fibre OPGW
a) Non Insulated Suspension Clamp/Attachment
1. Type Pivot
2. Material aluminium alloy
3. Applied Earth Wire 48 core OPGW
4. Ultimate Breaking Strength (kN) 60
5. Slip Strength (kN) 20% UTS conductor
6. Armour Rods (Used, Not Used) used
7. Galvanizing coating weight, if applicable Specify
b) Insulated Suspension Clamp/Attachment
1. Type Pivot
2. Material aluminium alloy
3. Applied Earth Wire 48 core OPGW
4. Ultimate Breaking Strength (kN) 60
2. Installation Bolted
b. The material offered should have been in the actual service for not less
5
than: (years)
B.6 Submittals
B.6.1 Contractor shall answer Yes, if documents are submitted with his
proposal. If yes, indicate what portion of the document proposed, i. e.
page no., volume no., etc.
a. Assembly drawing(s) showing view of complete string assembly(ies)
Yes
4. Weight, m *
* Note:
All damages caused to public roads, streets or public structures shall be compensated by the
Contractor at his own expense.
B.7.2 Packing
a. Each crate, box or package must have a packing list and in addition to the
usual and customary marks, the following identifying marks shall be
included:
1. Client Name
2. Project name and ID
3. Destination
4. Case No.
5. Gross Weight (kg)
6. Net Weight (kg)
7. Dimension (L x W x H)
B.8 Mandatory Spares and Spare Parts
B.8.1 The Contractor shall provide spare insulators for the Project as stated in
the Schedule of Quantities. It is understood that these spares will be used
only by the Employer in case of damage or failure outside the warranty
period. The Contractor therefore is obliged to provide sufficient quantities
as replacement for failures during construction and the duration of the
warranty period.
Component: Effect:
3. Weight
3. Weight
C.4 Other Technical Data for Guy Wire Markers and Materials
a) Suspension Clamp for Conductor
1. Manufacturer
2. Place of Manufacture
3. Weight
4. Place of testing and inspection
Contractor's Exception:
D.2 Clarifications
D.2.1 The Contractor may, but is not required to, provide clarification to his Submission in the space
provided or on a properly identified attached sheet.
Contractor's Clarification: