400kV s.c. Transmission Lines 4xACSR-Tern Page 1 of 10 Date: 10/25/2021
Fabrication & Manufacture of optical earth wire and materials per Specification Yes
A.3 The services of a competent field service engineer or technician is required under this contract.
(is, is not)
Employer's
Contractor's Data
B. TECHNICAL DATA Requirement
Note: The Tenderer is required to provide all the information required under the
column "Contractor's Data". Although not given by the Employer, the Contractor’s
data shall be based on international standard.
B.1 Site Conditions and Environment
B.1.1 The expected environmental and meteorological conditions for the location of the
optical earth wire installation are as follows:
a) Elevation above sea level (m) < 1000
c. No of Fibres 48 cores
k. Standard Specify
B.3.4 Other Technical Requirements
a. Optical earth wire Lay (right, left) Right
b. Length of Lay (outer layer) mm Specify
c. Corrosion Inhibitor (grease) requirements (Yes, No) Specify
d. Weight of optical earth wire (dry), kg/m Specify
e. Weight of optical earth wire (with grease), kg/m Specify
f. Length per reel, m Specify
g. Length tolerance (%) Specify
h. Provided with the following accessories (insulated and not-insulated)
1. Splice box Yes
2. Dead end clamp assembly Yes
3. Suspension Clamp Assembly Yes
g. Additional tests are required (Yes, No) If Yes, see paragrafph B.4.2 Specify
b.
The material offered should have been in the actual service for not less than: (years) 5
b. The material offered should have been in the actual service for not less than: (years) 5
The responsibility will lie on the Contractor whether the dimensions of his supplied equipment and materials in
crate or in box will be appropriate for loading, unloading and transported to the Project Site.
The Contractor must at his own expense, conduct an ocular route survey of all roads, bridges, overpasses, etc.,
from the Port of Entry to the Project Site and examine for himself the conditions of all roads and bridges.
The Contractor shall check the capacity and availability of loading and unloading facilities which will be
utilized in connection with his transport operation, as well as its characteristics, taking appropriate measures to
avoid damaging the same, All costs related to the reinforcements of roads, bridges and the like, if any, shall be
borne by the Contractor. The Contractor shall coordinate his own transport program and shall advise the
proper authorities of the transit of the heaviest items to be transported and shall comply with the instructions
given by said authorities.
All damages caused to public roads, streets or public structures shall be compensated by the Contractor at his
own expense.
B.6.2 Packing
a. Each crate, box or package must have a packing list and in addition to the usual and
customary marks, the following identifying marks shall be included:
1. Client Name
Total attenuation calculation of concatenated OPGW for each line segment (i.e. end- Yes
f.
to-end attenuation) including all splices. Calculated as per ITU-T G.652
B.10.2 The choice of OPGW by the Contractor, whether having a single or double layer to withstand the fault current,
shall be such that the sag of the OPGW when strung shall be approximately equal to that of the overhead ground
wire. When this is not possible, the Contractor shall see to it that the required clearance between the OPGW and
the phase conductors is met. The Contractor shall submit the clearance diagram together with design
computation for Employer’s review and approval.
B.10.3 The associated hardware and accessories are also given in the price schedules on a “Lot” basis. The Contractor is
required to make his own review and assessment of the quantities using the Contractor’s standard practice for
installation.
In accordance with the Design Basis, the operating environment for this installation _______________(will,
will not) affect the life expectancy of the components used in this equipment. If there be an effect, the following
components will be affected as follows:
Component: Effect:
Employer's
C.3 Other Technical Data for the Optical earth wires and Materials Requirements Contractor’s Data
a. Optical earth wires:
1. Optical earth wire Manufacturer Specify
2. Reel Manufacturer Specify
3. Optical earth wire Reel Length & Tolerance, m/% Specify
4. Outside Diameter over lagging, m Specify
5. Overall width, mm Specify
6. Drum Diameter, mm Specify
7. Shipping weight per reel, kg Specify
b. Compression Cable Splice Assembly
1. Manufacturer Specify
2. Type and Designation Specify
c. Compression Cable Dead-End Assembly
1. Manufacturer Specify
2. Type and Designation Specify
3. Breaking Strength, KN Specify
d. Compression Dies
1. Manufacturer Specify
2. Die Set Designation Specify
e. Hydraulic Compressor
1. Manufacturer Specify
2. Compression Designation Specify
3. Capacity Specify
4. Voltage (AC or DC) Specify
f. Hydraulic Pump
1. Manufacturer Specify
2. Designation Specify
g. Comealong
1. Manufacturer Specify
2. Designation Specify
h. Filler Compound
1. Manufacturer Specify
2. Quantity per tube, kg. Specify
3. Number of Tubes (each) Specify
4. Total, kgs. Specify
D. STRESS-STRAIN CURVE COEFFICIENTS A0, A1, A2 and A4
a. Initial
1. Outer Specify
2. Core Specify
b. 10-year Creep
1. Outer Specify
2. Core Specify
c. Final
1. Outer Specify
2. Core Specify
E. INFORMATION ON THE EARTH WIRE RELATIVE TO THE
Employer Contractor
PREPARATION OF THE SAG AND TENSION CHARTS
Maximum Wind, Min.
a. Maximum loading condition
Temperature
b. Maximum tension at maximum load on optical earth wire: 40% of OPGW UTS
c. Temperature Range ( C)
o
0 to 50
d. Range of Span, m 300 - 900
F.1 Exceptions
F.1.1 If Contractor's Tender contains any exception(s) to the requirements of this specification, he shall state it (them)
here or on a properly identified attached sheet. Any exceptions taken may render Contractor's Tender as non-
complying. Any exception(s) stated by the Contractor anywhere else, except in this section, will be disregarded
by Employer. If the Contractor has no exceptions, state "NONE".
Contractor's Exception:
F.2 Clarifications
F.2.1 The Contractor may, but is not required to, provide clarification to his Tender in the space provided or on a
properly identified attached sheet.
Contractor's Clarification: