T-TS-05-001 Technical Schedules
Transmission Lines 400kV s.c. 4xACSR-Tern Page 1 of 9 Date: 10/25/2021
Fabrication & Manufacture of earth wire and materials per Specification Yes
Employer's Contractor's
B. TECHNICAL DATA Requirement Data
Heavy to Very
e) Degree of Contamination (Equiv. Salt deposit density, mg/cm2)
Heavy
Design Wind Velocity:
a) Maximum design wind, 3s gust, factored according to IEC 60826 40m/s
f) b) Exceptional design
wind, 3s gust, factored according to IEC 60826
Terrain category: "B", according to IEC 60826
g) Anticipated Contamination Sources During transport and storage
h) Other outdoor abnormal conditions: (Yes, No)
1. Chemical pollution sources Sea Salt
2. H2S gas No
3. Other - ionisation of air due to bush fires Some places
B.1.2 Equipment shall be protected for outdoor storage for a period of: year
2
(specify one, other)
B.1.3 Sag/Tension Data
The following data shall be furnished for installation of the OPGW:
a) Initial stringing sag and tension for temperatures ranging from 0° C to 50°
Yes
C in steps of 5° C.Sag data will be furnished for all ruling spans.
b) Final sags and tensions for the following temperature range: 0° C to 50°
c) Recommendation of type, number and location of dampers for vibration
Yes
control.
B.2 Quantities
B.2.1 The quantities of earth wires and its accessories required under this
contract are indicated in the Schedule of Quantities
B.3 Technical Characteristics and Requirements
B.3.1 Earth wires Physical Particulars
a. Type ACS
b. Code Name 7 No. 6 AWG
c. Standard Specification applied ASTM
B.5 Submittals
B.5.1 Contractor shall answer Yes, if documents are submitted with his proposal.
If yes, indicate what portion of the document proposed, i. e. page no.,
volume no., etc.
a. Proposed time bar schedule to meet submission of drawings, delivery,
installation and commissioning schedules
b. Certified Design Test Reports Yes
The Contractor must at his own expense, conduct an ocular route survey of all roads, bridges,
overpasses, etc., from the Port of Entry to the Project Site and examine for himself the
conditions of all roads and bridges.
The Contractor shall check the capacity and availability of loading and unloading facilities
which will be utilized in connection with his transport operation, as well as its characteristics,
taking appropriate measures to avoid damaging the same, All costs related to the
reinforcements of roads, bridges and the like, if any, shall be borne by the Contractor. The
Contractor shall coordinate his own transport program and shall advise the proper authorities
of the transit of the heaviest items to be transported and shall comply with the instructions
given by said authorities.
All damages caused to public roads, streets or public structures shall be compensated by the
Contractor at his own expense.
B.6.2 Packing
a. Each crate, box or package must have a packing list and in addition to the
usual and customary marks, the following identifying marks shall be
included:
1. Client Name
2. Project name and ID
3. Destination
4. Case No.
5. Gross Weight (kg)
6. Net Weight (kg)
7. Dimension (L x W x H)
B.7 Mandatory Spares and Spare Parts
B.7.1 The Contractor shall provide spare earth wires for the Project. It is
understood that these spares will be used only by the Employer in case of
damage or failure outside the warranty period. The Contractor therefore is
obliged to provide sufficient quantities as replacement for failures during
construction and the duration of the warranty period.
1. Number of reels 1
2. Steel reels (Yes, No) Yes
3. Quantity (m) 5000
In accordance with the Design Basis, the operating environment for this installation
_______________(will, will not) affect the life expectancy of the components used in this
equipment. If there be an effect, the following components will be affected as follows:
Component: Effect:
C.3 Other Technical Data for the earth wires and Materials Contractor’s Data
a. Earth wires:
1. Earth wire Manufacturer
2. Reel Manufacturer
3. Earth wire Reel Length & Tolerance, m/%
4. Outside Diameter over lagging, m
5. Overall width, mm
6. Drum Diameter, mm
7. Shipping weight per reel, kg
b. Compression Cable Splice Assembly
1. Manufacturer
2. Type and Designation
c. Compression Cable Dead-End Assembly
1. Manufacturer
2. Type and Designation
3. Breaking Strength, KN
d. Compression Dies
1. Manufacturer
2. Die Set Designation
e. Hydraulic Compressor
1. Manufacturer
2. Compression Designation
3. Capacity
4. Voltage (AC or DC)
f. Hydraulic Pump
1. Manufacturer
2. Designation
g. Comealong
1. Manufacturer
2. Designation
h. Filler Compound
1. Manufacturer
2. Core
c. Final
1. Outer
2. Core
E. INFORMATION ON THE EARTH WIRE RELATIVE TO THE
Employer Contractor
PREPARATION OF THE SAG AND TENSION CHARTS
a. Maximum loading condition Maximum Wind
40% of Earthwire
b. Maximum tension at maximum load on earth wire:
Breaking Load
c. Temperature Range 0-50
d. Range of Span, m 300-900
F. CONTRACTOR'S EXCEPTIONS AND CLARIFICATIONS:
F.1 Exceptions
F.1.1 If Contractor's Submission contains any exception(s) to the requirements of this specification,
he shall state it (them) here or on a properly identified attached sheet. Any exceptions taken
may render Contractor's Submission as non-complying. Any exception(s) stated by the
Contractor anywhere else, except in this section, will be disregarded by Employer. If the
Contractor has no exceptions, state "NONE".
Contractor's Exception:
F.2 Clarifications
F.2.1 The Contractor may, but is not required to, provide clarification to his Submission in the space
provided or on a properly identified attached sheet.
Contractor's Clarification: