DATE :
Attn : Mr Desmond
10. Line check & Calibration sensor tank Gauging.tank sensor all
around 42tanky.
Renew 16 unit sensor
Install new level switch methanol tank
Install new barrier methanol tank
Install new sensor methanol tank 53 and check sensor
methanol tank 52.
11. Testing and commissioning Bilges system and presentation to
class.(17pcs). Install Float switch new type follow Blue ridge
comment (5pcs)
12. CCTV,installation new equipment and assist testing .
a) Monitor 2unit
b) Receiver
13. Test and commissioning Engine telegraph, install 2pcs baby siren
alarm at Engine telegraph panel propulsion PORT & STBD.
14. Line check and calibration draft sensor.4pcs.
15. Function test galley and laundry equipment ;
a) Hot plate
b) Deep fryer
c) Potato peeller
d) Meat slicer
e) Dishwasher
f) Washing machine and dryer
16. Open MRU and send to store ASL for calibration, after finish
install back.
17. Pulling cable DC for supply gyro compass (existing cable size to
small)
18. Test and commissioning level switch tank all vessel.
19. Assist commissioning,installation new equipment Radio
communication system .
20. Assist commissioning, installation new equipment Navigation
system .
21. Assist commissioning, installation new equipment Gyro system.
22. Test and commissioning Heater accommodation and heater
floor bathroom all around deck. Test and presentation to
Owner/charter.
23. Cleaning all panel controll and distribution from dust and rust,
change air intake filter element.
24. Install new capasitor propultion 60pcs)
25. Install monitor BWTS,install solenoid 2pcs,install UV sensor and
selector switch.
26. IAS system ;
a) Install new Module cabinet 3 and cabinet 5 arround
30module
b) Install monitor CCR 4pcs and bridge 2pcs
c) Install CPU bridge console
d) Install printer
27. Dismantle electric equipmen on bridge during carpenter install
new windows ;
1. Down light
2. VDR microphone
3. Cyscan monitor
4. C-joy
5. Flood light
S/N DESCRIPTION Remarks
Scope Of Supply
01 Contractor to provide all testing equipments such as mage
meter, multi meter, clamp meter, VHF radio & etc for testing
requirements.
02 All consumables & tooling for electrical work Sealant compound supply by
yard
03 All consumables & tooling for hot work ( class approved
electrode )
04 A-frame ladder for working at accommodation area Safe for use, certified by yard
safety
05 Extension wire for electrical tooling c/w industry plug.
Distribution panel if require.
06 Ventilation blower dia. 12” & lighting for working inside
tanks.
07 Personal protective equipment for workers Accordance to Yard safety
requirement
08 Working attire for workers – Overall Accordance to Yard safety
requirement
09 Workers insurance, tax as per Indonesia labors rule & service
tax as per Indonesia rule.
10 Equipment& tooling not stated under yard of supply
11 Cost for re-work – due to poor workmanship ( Reject by
owner representatives or surveyor )
12 Welders test cost. ( Welder certificate 4G, 5G & 6G )
13 Certified skill workers such as safety , engineer, supervisor,
foreman, welders, fitter, helpers & etc.
3. Any modification & additional work out from initial scope will consider Variation order.
We trust that the above quotation to you & looking forward to your confirmation.
With Best Regards