Mounting Structures (Tracking System)

Manufacturer
Model
Mounting structures manufacturer shall have supplied
mounting structures for at least 500 MW (DC) of Yes/No Yes
accumulated capacity
Mounting structure model shall be proven technology
(included tested, commissioned and successfully
operated for at least one (1) year preceding the Bid
Submission Deadline)) in at least two operational PV
Yes/No Yes
plants above 10 MW (DC) with similar ambient
conditions, and accumulated installed capacity of the
mounting structure model shall be equivalent to at least
50 MW (DC)
Tracker technology
Number of trackers per block
Corrosion protection Yes/No Yes
Type of corrosion protection
Tracker Torque Tubes shall be batch hot-dip galvanized Yes/No Yes
Design maximum wind speed (3-sec gust, 10 m height) Km/h

Stow strategy control system in line with the
requirements set in section 4.19.1 of the Part II of Yes/No Yes
the RFP.
 Successful wind tunnel tests in line with the
requirements set in section 4.19.1 of the Part II of Yes/No Yes
the RFP.
 Successful tracker dynamic analysis in line with
the requirements set in section 4.19.1 of the Part Yes/No Yes
II of the RFP.
 Successful results for tracker stress, stability and
connections verifications, both by calculation and
by actual loading tests, and stability check for Yes/No Yes
operational and maximum wind speeds in line
with the requirements set in section 4.19.1 of the
Part II of the RFP.
Peak power per tracker system kWp
Back tracking Yes/No Yes
Designed/protected to withstand large amounts of
Yes/No Yes
dust/sand in the air
Type of protection against large amounts of dust/sand in
Type
the air
Duration of warranty for the design, material, and
installation of the structure (fixed or tracking), Years ≥ 10
substructure, power unit, piles, and foundations
Lifetime design guarantee Years ≥ 25