You are on page 1of 1

TEST

31. ANT LOCATED AT LEADING EDGE OF VERTICAL STAB = HF ANT


32.UNIT MEASUREMENT OF INDUCTIVE REACTANCE =OHM (Xl = 2 * 3.14 * FL )
( L = INDUCTIVE = HENRY )
33. INCR RESISTANCE OF CONDUCTOR = INCR LENGTH AND DECR CROSS-
SECTION AREA
34.ELECTRONIC SW = TRANSISTOR
35.DC – AC = STATIC INVERTER
36.HF RADIO WAVE = CAN REFECT IN AN IONIZED LAYER AND GND SURFACE TO
ARCHIVE LONG-RANGE COMMU
37.GET MORE CONDUCTIVITY WIRE GAUGE = AWG 00
38.METHOD CHARGE NICKEL CADMIUM BATTERY = CONSTANT VOLTAGE AND
VARYING CURRENT
39.BINARY F415 = 1111010000010101
40.CLEARANCE BTW WIRE HARNESSES ARE MINIMUM AND WHAT LINE SHOULD
HAVE MAX CLEARANCE = OXYGEN LINE
41. SEQ INSP SYS OF DT = 1. RECEIVING INSP 2. IN-PROCESS INSP 3. FINAL INSP
4. TEST RECORD
42.SAFA (SAFETY ASSESSMENT OF FOREIGN AIRCRAFT) PROGRAMME IS ONE OF
ACT OF =EASA
43.CALIBRATION SPECIFIED BY USER = CALIBRATION BEFORE USE
44.HANDLE ELECTROSTATIC DISCHARGE COMPONENT=GND WRIST STRAPS
SHALL BE IN CONTACT WITH OPR SKIN BEFORE HANDLING ESD DEVICES
45.RETENTION PERIOD A/C LOG = FIVE YEAR
46.HANDLE EUROPEAN REG A/C = TTQM 21
47.A/C TYPE DO NOT CERTIFY OPR ETOPS = B744 ,B734
48.QMR (TTPM-QP) IN ISO 9001/2000 = DT
49.DOCUMENT CAN FIND PROCEDURE TO CONTROL ELECTRONIC DOCUMENT =
TTPM-QP
50.DOCUMENT NEED TO HAVE THE READ AND SIGN SYS ACC. TO TTPM-QP 905
= CUSTOMER INFORMATION /NOTE /BULLETIN
51.T1 (กองควบคุมระบบความปลอดภัย) = INSTALL FIRE ACTING ,INSP PERSON IN-OUT
WORK AREA
52.T2 (กองงานด ้านสิง่ แวดล ้อม) = จัดเก็บ and TA-S = (แผนกธุรการ) = จำหน่าย
53. SECURITY MANUAL = TSP
54. AOT REQ CHK CAR DIVER LICENSE SPECIAL CHK EYE , EAR = EFF JUN/
2006
55.ENVELOPMENT POLICY MANUAL = TTQM
56. CEMIST LEAK MANUAL PROCEDURE = TTPM –EP

You might also like