FlexLink offers an overhead merging unit that allows Installation: Simple installation to standard conveyors
the merging of two lanes of products into one using standard fittings.
lane.The unit allows a range of products up to a max-
Non standard units: Non Standard version of the merg-
imum production rate of 400 products per minute.
ing unit are available please contact:
EDS@flexlink.com if you have a nonstandard RFQ for
Standard features this device.
Height Adjustment: Height can be adjusted to suit a
range of different product heights.
Compact Design: The unit is both modular & compact.
The unit is supplied as a complete module that can be
integrated into any line new or existing.
Robust Design: The system is robust and designed to
operate within a production line without reducing the sta-
bility of the conveyor system and without operator inter-
face.
Smooth Product Handling: Smooth Product merge
with minimal supervision required by the operator.
Clean Design: Clean design with minimal dust ingress.
Technical specification:
X65: 10mm - 65 mm
Functional operation
X85: 10 mm - 60 mm
The packet merge module consists of two interlocked
Minimum/Maximum width: arms which are placed in the product paths, forming a
go/no-go system.
Max Product width: 80 mm
When product moves freely under one arm, it locks shut
Minimum/Maximum pack weight: the other track and prevents products coming through.
Once the product on the first track is through the merge
Minimum Pack weight: 25 g
unit, the arm lowers and the production on the second
Maximum Pack weight: 250 g track is free to move forwards.
Thus packets are automatically fed into the same track
with no danger of jams occurring.
Operating parameters
Product gap The unit operates with a production flow of free - flowing
products - in the event that any downstream conveyors or
The merge unit is designed to work with gaps between equipment stops then the flow of products on the con-
the products, however it can operate with queues of prod- veyor must be controlled.
uct. It should be noted the ideal running situation should The products that have passed through the merge unit
be with gaps of free flowing product into the merge. If the will accumulate against the downstream stoppage and
system runs with long queues of product it is likely that build back towards the merge unit.
the merge will not be efficient as the queue will prevent A photo-eye must be positioned across the conveyor
both sides of the infeed conveyors merging into one lane approximately 1000mm in front of the merge unit such
that when the photo eye becomes covered the conveyors
stop immediately to prevent build back into the merge
area.