You are on page 1of 3

No.

Name of Student Intended Learning Topic/s Week


Outcomes Schedule
CE 417 - CE Laws, Contracts, Specifications and Ethics Section: CEA_CE_4b Final Term Exam
CO1 Group 1
1 ACERA, Mara Ronquillo Total Project Cost 8.0 General Week 12
2 AGUILAR, Llanie Yin 8.1 Professional
Zulieta Engineering Cost
3 ALCIDO, Miashyll Angelou 8.2 Construction
Jimeno Cost
4 BANDOLIS, Neuhydele
5 Caballero
BAUTISTA, Mae Flor
Yamaro
Group 2
6 BESINGA, Ahl Sydric 8. Total Project Cost 8.3 Legal, Land, Week 12
James Ladisla Administration,
7 CAHOY, Keneth Dave Staffing and
Gomera Financial Costs
8 CANOOG, Maria Elireza 8.4 Contingency
Tambis Allowance
9 CARRETERO, John Rohi
Lazo
10 CULTURA, Kyle John
Olano
CO2 Group 3
11 DADIOS JR., Fernando Implementing Rules and Implementing Rules Week 12
Maaliao Regulations on the and Regulations on
12 DADOLE, Karl Graig Procurement of the Procurement of
Adrian Bicada Consulting Services for Consulting Services
13 DE LOS REYES, Dario Jr. A. Government Projects. for Government
Projects.
14 ELLEVERA, Princess Girlie
Asombrado
15 ENTROLISO, Jessa May
Medel
Group 4
16 EPONDULAN, Jinelle 9.1 RA 544: An Act to 9.1 RA 544: An Act Week 13
Nagac Regulate the Practice of to Regulate the
17 ESITO, Geo Rosales Civil Engineering in the Practice of Civil
18 FLORES, Winchester Philippines Engineering in the
Batilo Philippines
19 GA-AS, Lalaine Lace
Waban
Group 5
20 HILUDO, Claire Darleen 10. Discuss the 10. Discuss the Week 13
Sissy Suclatan RA 9184: The RA 9184: The
21 IPANAG, Miles Gizza Government Procurement Government
LOMANTAS Reform Act. Procurement Reform
22 LEOP, Iza Marie Galaroza Implementing Rules and Act. Implementing
23 LLAUSAS, Jan Marie Regulations on the Rules and
Marba Procurement of Regulations on the
24 MACASA, Azzalea Nicole Consulting Services for Procurement of
Marie Hisona Government Projects and Consulting Services
for Government
Projects and

Group 6
P.D 1594 and its P.D 1594 and its Week 14
25 MORALES, Maejelou implementing Rules and implementing Rules
Nayre Regulations as Amended and Regulations as
26 MOSQUEDA, Samuel Jr. Amended
Wapin
27 NAMOCATCAT,
Lensearfwyn Pacheco
28 OSIAS, Katie Shulammite
Casinillo
Group 7
29 PELIAS, Jhon Carla Bucag Discuss the CIAP Discuss the CIAP Week 14
30 PENASO, Kevin Cosmo Document 102:Uniform Document
31 POBLETE, Kyla Amor General Conditions of 102:Uniform
Banal Contract for Private General Conditions
32 QUERENCIA, Benjie Abut Construction, of Contract for
Private Construction,
Quiz Week 14
Group 8
33 REQUIRME, Niño Rey Extracts from the New Extracts from the Week 15
Casul Civil Code: Obligations New Civil Code:
34 RIZADA, Piolo Louie and Contracts and The Obligations and
Ricaborda Civil Engineering Contracts and The
35 ROCKWELL, Eary Seboco Professional Civil Engineering
ROMERO, Juniel Navarro Professional
36 SABA, John Michael
Alguzar
Group 9
37 SAMPORNA, James PD 1096: The National PD 1096: The Week 15
Darryn Simon Building Code and its National Building
38 SIA, Kennette Kyle Acas Implementing Rules and Code and its
39 SY, Gwyneth Ingrid Regulations. Implementing Rules
Granada and Regulations.
40 UNABIA, James Rafael Seminar: Trends and
Issues Concerning Civil Seminar: Trends and
Vajon
Engineering Practice Issues Concerning
41 WABE, Rizalou Dimple Civil Engineering
Fabe Practice
Final Term Exam Week 18
Midterm Exam Week 9-10

You might also like