Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
B. Terms used in this document, the following terms and B. Dalam dokumen ini dipergunakan pengertian,
abbreviations : istilah dan singkatan sebagai berikut :
- Civil Works : all work related to theconstruction of - Pekerjaan Konstruksi : seluruh pekerjaan
buildings or making any other physical form yang berhubungan dengan pelaksanaan
konstruksi bangunan atau pembuatan wujud
fisik lainnya;
- OE : Ownner Estimates - HPS : Harga Perkiraan Sendiri;
- Joint Venture/Joint Operation (J.O) : - Kemitraan/Kerja Sama Operasi (KSO) :
collaborative effort among providers that each kerjasama usaha antar penyedia yang
party has the rights, obligations and responsibilities masing-masing pihak mempunyai hak,
are stated clearly on a written agreement; kewajiban dan tanggung jawab yang jelas
berdasarkan perjanjian tertulis;
- QDS : Qualification Data Sheet - LDK : Lembar Data Kualifikasi;
- Bid Committe : Team for implementing the - Pokja ULP : Kelompok Kerja ULP yang
Procurement of Goods / Services berfungsi untuk melaksanakan Pengadaan
Barang/Jasa.
D. Procurement forthis prequalification is financed from D. Pengadaan melalui pra-kualifikasi ini dibiayai
the funding sources listed in the QDS. dari sumber pendanaan yang tercantum dalam
LDK.
E. Pre-qualification is open and can be followed by all E. Pra-kualifikasi ini terbuka dan dapat diikuti oleh
participants in the form of corporation or partnership / semua peserta yang berbentuk badan usaha
joint operation/J.O. atau kemitraan/KSO
3
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Project Management Unit for The Development of Unit Pengelola Proyek untuk Pembangunan Proyek
Medical Education and Research Center and Two Pengembangan Pusat Pendidikan & Penelitian
University Hospitals Project, Ministry of Education and Kedokteran dan Dua Rumah Sakit Pendidikan,
Culture, through the Bid Committee will carry out the Kementerian Pendidikan dan Kebudayaan melalui Pokja
Pre-qualification for construction work package financed ULP akan melaksanakan Prakualifikasi untuk paket
by Islamic Development Bank (IDB) Project No. IND-137 pekerjaan konstruksi yang dibiayai oleh Islamic
as follows: Development Bank (IDB) Project No. IND-137 yaitu
sebagai berikut:
Scope of works: Construction work for the Medical Lingkup pekerjaan: Pekerjaan Konstruksi untuk
Education and Research Center, University of pembangunan Pusat Pendidikan & Penelitian
Indonesia Kedokteran UI
Building area and height: The building should cover Luas dan tinggi bangunan: Luas bangunan adalah
a total area of 21,120 m2, with 12 storeys and 2 sebesar 21,120 m2, dengan tinggi 12 lantai serta 2
basement levels lantai basement
Funding Source: Islamic Development Bank (IDB) Sumber pendanaan: Bank Pembangunan Islam
Project No. IND-137 Fiscal Years 2013 (IDB) Proyek No. IND-137 Tahun Anggaran 2013.
c. Provide at least 9 (nine) experts who have c. memiliki minimal 9 (sembilan) orang Tenaga
expertise with appropriate qualifications and Ahli dengan kualifikasi yang sesuai, serta harus
must meet the requirements of expertise / memenuhi persyaratan keahlian/spesialisasi,
specialization, experience and managerial skills pengalaman, dan kemampuan manajerial yang
required in accordance with qualification data diperlukan sesuai Lembar Data Kualifikasi
sheet (QDS) (LDK);
d. have the technical supporting staffs with d. memiliki tenaga pendukung teknis dengan
qualification capabilities needed for kemampuan kualifikasi yang diperlukan untuk
4
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
implementing this construction work and must pelaksanaan pekerjaan konstruksi ini serta
meet the experience requirements, technical harus memenuhi persyaratan pengalaman,
and managerial skills required in accordance kemampuan teknis dan manajerial yang
with the qualification data sheet (QDS) diperlukan sesuai dengan lembar data
kualifikasi (LDK);
e. has a certificate of financial support from state e. memiliki surat keterangan dukungan keuangan
owned/private bank for at least USD dari bank pemerintah/swasta sebesar USD
1,750,500,- (IDR exchange rate used at the 1.750.500 (Nilai tukar rupiah yang digunakan
date of PQ Doucment submission); adalah pada tanggal pemasukan PQ dokumen);
f. have the ability to provide facilities/ equipment/ f. memiliki kemampuan menyediakan fasilitas/
supplies to carry out this construction work, in peralatan/ perlengkapan untuk melaksanakan
accordance with the qualification data sheet pekerjaan konstruksi ini sesuai dengan lembar
(QDS). data kualifikasi (LDK);
F. A person prohibited from representing more than 1 F. Seseorang hanya dapat mewakili 1 (satu)
(one) company in the register and take the Pre- perusahaan untuk mendaftar dan mengambil
Qualification Documents. Dokumen Pra-Kualifikasi.
5
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
A. General A. Umum
2.1 Applicants and parties related to this procurement 2.1 Perusahaan Peserta dan pihak yang terkait dengan
are obliged to adhere to ethical procurement with no pengadaan ini berkewajiban untuk mematuhi etika
action as follows: pengadaan dengan tidak melakukan tindakan
sebagai berikut:
a. attempting to influence members of the bid a. berusaha mempengaruhi anggota Pokja ULP
committee in any form and manner, to meet the dalam bentuk dan cara apapun, untuk
wishes of participants as opposed to the Pre- memenuhi keinginan peserta yang bertentangan
Qualification Documents, and / or legislation; dengan Dokumen Pra-Kualifikasi, dan/atau
peraturan perundang-undangan;
b. conspiracy with other participants to set the b. melakukan persekongkolan dengan peserta lain
qualifications, so that the reduce / prevent / untuk mengatur hasil kualifikasi, sehingga
minimize / eliminate competition and / or harm mengurangi/menghambat/memperkecil/meniada
others; kan persaingan yang sehat dan/atau merugikan
pihak lain;
c. create and / or submit documents and / or other c. membuat dan/atau menyampaikan dokumen
information that is not correct to meet the dan/atau keterangan lain yang tidak benar untuk
requirements in Pre-Qualification Documents. memenuhi persyaratan dalam Dokumen Pra-
Kualifikasi.
2.2 Applicants based on bid committee assesment that 2.2 Perusahan Peserta yang menurut penilaian Pokja
are proven to act as referred to para 2.1 shall be ULP terbukti melakukan tindakan sebagaimana
imposed the following matters: dimaksud dalam angka 2.1 di atas dikenakan sanksi
sebagai berikut:
a. Administrative sanctions, such as aborted from a. sanksi administratif, seperti digugurkan dari
the qualification or cancellation of passed proses kualifikasi atau pembatalan kelulusan
qualification; kualifikasi;
b. Black List sanction; b. sanksi pencantuman dalam Daftar Hitam;
c. A civil lawsuit and / or c. gugatan secara perdata; dan/atau
d. Reporting as crime to authorities. d. pelaporan secara pidana kepada pihak
berwenang.
2.3 Imposition of sanctions by the Bid committee 2.3 Pengenaan sanksi oleh Pokja ULP dilaporkan
reported to the PA/KPA (Project Manager and kepada PA/ KPA (Manajer Proyek dan Direktur
Project Director). Proyek).
3.1 The parties in carrying out the duties, functions and 3.1 Para pihak dalam melaksanakan tugas, fungsi dan
roles, are prohibited from owning/ perform multiple perannya, dilarang memiliki/ melakukan peran
roles or affiliated. ganda atau berafiliasi.
6
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
3.2 Dual role referred to para 3.1 includes: 3.2 Peran ganda sebagaimana dimaksud angka 3.1 di
atas antara lain meliputi:
a. A member of the Board of Directors or Board of a. Seorang anggota Direksi atau Dewan Komisaris
Commissioners of a Business Entity must not be suatu Badan Usaha tidak boleh merangkap
concurrently as a member of the Board of sebagai anggota Direksi atau Dewan Komisaris
Directors or Board of Commissioners on other pada Badan Usaha lainnya yang menjadi
business entities who become participants in the peserta pada pelelangan yang sama;
pre-qualification process;
b. The appointed PMC, DEDC, PSC, and EQC are b. Konsultan PMC, DEDC, PSC, dan EQC dilarang
prohibited as participant of the pre-qualification; berpartisipasi dalam pra-kualifikasi;
c. Cooperative employees of UI or MoEC the c. Pegawai UI atau Kemdikbud, atau pegawai anak
State, or Provincial Owned Entreprises’ perusahaan pada BUMN/ BUMD yang
subsidiaries (BUMN/ BUMD) that follow the merangkap sebagai anggota Pokja ULP atau
Procurement and compete with other pejabat yang berwenang menentukan
companies, serves as a member of the bid pemenang Pelelangan, dilarang berpartisipasi
committe or the authorized officer determines dalam Pra-kualifikasi;
the pre-qualification result, are prohibited as
participant of the Pre-qualification;
3.3 Affiliation refer to para 3.1 is a relationship among 3.3 Afiliasi sebagaimana dimaksud angka 3.1 di atas
the participants and between participants with PPK adalah keterkaitan hubungan, baik antar peserta,
and/or members of the bid committee which include: maupun antara peserta dengan PPK dan/atau
anggota Pokja ULP yang antara lain meliputi:
a. family relationships by marriage and descent to a. hubungan keluarga karena perkawinan dan
the second degree, both horizontally and keturunan sampai dengan derajat kedua, baik
vertically; secara horizontal maupun vertikal;
b. PPK and / or members of the bid committe, b. PPK dan/atau anggota Pokja ULP, baik
either directly or indirectly controlling or langsung maupun tidak langsung
managing the companies participated in the pre- mengendalikan atau menjalankan perusahaan
qualification; peserta;
c. relationship between 2 (two) companies that are c. hubungan antara 2 (dua) perusahaan yang
controlled directly or indirectly by the same party dikendalikan, baik langsung maupun tidak
that is more than 50% (fifty percent) shareholder langsung oleh pihak yang sama yaitu lebih dari
and / or one of its leaders alike. 50% (lima puluh perseratus) pemegang saham
dan/atau salah satu pengurusnya sama.
3.4 UI and other government employees are prohibited 3.4 Pegawai UI dan pegawai pemerintah lainnya
to be participant experts of the pre-qualification. dilarang menjadi Tenaga Ahli perusahaan yang
berpartisipasi dalam pra-kualifikasi.
4. One Qualification Document for Each Applicant 4. Satu Dokumen Kualifikasi Tiap Peserta
4.1 Each applicant, either on behalf of itself and as a 4.1 Setiap perusahaan peserta, baik atas nama sendiri
member of the partnership / joint operation is only maupun sebagai anggota kemitraan/KSO hanya
allowed to submit a Qualification Form Document diperbolehkan menyampaikan satu Dokumen Isian
(the pre-qualification quesionairre). Kualifikasi (instrumen prakualifikasi).
4.2 An applicant as a member of the partnership / KSO 4.2 Setiap perusahaan peserta yang termasuk dalam
is barred from being the member of the other kemitraan/KSO dilarang menjadi anggota
partnerships/ KSO in participating the pre- kemitraan/KSO lainnya yang berpartisipasi dalam
qualification process. proses pra-kualifikasi.
7
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
1.1. Applicants shall examine the entire contents of Pre- 1.1 Perusahaan peserta berkewajiban memahami
Qualification Documents. Negligence convey the keseluruhan isi Dokumen Pra-Kualifikasi. Kelalaian
information required in the Pre-Qualification menyampaikan keterangan yang disyaratkan dalam
document is the sole risk of the participants. Dokumen Pra-kualifikasi sepenuhnya merupakan
risiko perusahaan peserta.
1.2 Applicants may request a written explanation about 1.2 Perusahaan peserta dapat meminta penjelasan
the content of Pre-Qualification Documents through secara tertulis mengenai isi Dokumen Pra-
e-mail to idb.piu@ui.ac.id atau Kualifikasi melalui e-mail ke idb.piu@ui.ac.id atau
merc.fkui@gmail.com merc.fkui@gmail.com
1.3. Bid committee shall respond to any requests put 1.3 Pokja ULP wajib menanggapi setiap permintaan
forward an explanation in writing to participants. penjelasan yang diajukan perusahaan peserta
secara tertulis.
3.1.Before the dateline of submission of Pre- 3.1. Sebelum batas akhir waktu penyampaian Dokumen
Qualification Documents, bid committee can change Pra-Kualifikasi, Pokja ULP dapat mengubah
by setting Addendum for Pre-Qualification Dokumen Pra-Kualifikasi dengan menetapkan
Documents. Adendum.
3.2.Any Addendum set is an integral part of the Pre- 3.2. Setiap Adendum yang ditetapkan merupakan
Qualification document and is distributed to all bagian yang tidak terpisahkan dari Dokumen Pra-
participants. Kualifikasi dan disampaikan kepada semua
peserta.
3.3. Bid committee may extend the dateline of 3.3. Pokja ULP dapat mengundurkan batas akhir waktu
submission of qualification documents when there is penyampaian Dokumen Pra Kualifikasi apabila ada
an addendum of Pre-Qualification Documents. adendum Dokumen Pra Kualifikasi.
8
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
between the original document and copied, the “COPY”. Jika terdapat ketidaksesuaian antara
original documents are valid. dokumen asli dan foto copy, maka dokumen asli
yang berlaku.
3.1. Participants are obliged to fill in and complete the 1. Perusahaan peserta berkewajiban untuk mengisi
Integrity Pact and Pre-Qualification Form / dan melengkapi Pakta Integritas dan Isian Pra-
questionaire forms. Kualifikasi/isian kwesioner.
3.2. Integrity Pact and Pre-Qualification Form must be 2. Pakta Integritas dan Isian Pra-Kualifikasi harus
signed by: ditandatangani oleh:
a. Managing Director / Head of the company; a. Direktur utama/ Pimpinan perusahaan;
b. receiving power of Authority from the President / b. penerima kuasa dari direktur utama/ pimpinan
Head of the company that the recipient's name perusahaan yang nama penerima kuasanya
listed in the deed of its legals or amendments; tercantum dalam akta pendirian atau
perubahannya;
c. head of the subsidiary appointed by the central c. kepala cabang perusahaan yang diangkat oleh
office as evidenced by authentic documents; or kantor pusat yang dibuktikan dengan dokumen
otentik; atau
d. the appointed officer represented the d. pejabat yang menurut perjanjian kerja sama
partnership/KSO based on its agreement. (KSO) berhak mewakili perusahaan yang
bekerja sama.
1.3. Applicants may submit pre-qualification documents 1.3. Perusahaan peserta dapat menyampaikan
by postal/ courier service to the provisions of the bid Dokumen Pra-Kualifikasi melalui pos/ jasa
9
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
committee has been received by the deadline of pengiriman dengan ketentuan sudah diterima
pre-qualification document submission and all risks Pokja ULP sebelum batas akhir pemasukan
of delay and destruction of documents to be Dokumen Isian Pra-Kualifikasi; keterlambatan dan
applicants risk kerusakan dokumen menjadi risiko perusahaan
peserta.
1.4.In the case of Pre-Qualification documents is 1.4. Dalam hal Dokumen Isian Pra-Kualifikasi
submitted through postal / courier service, then the disampaikan melalui pos/ jasa pengiriman, maka
cover is inserted into the outer envelope bearing the dokumen yang sudah dimasukan ke dalam amplop
name and address of the bid committee. tertutup dimasukkan ke dalam sampul luar yang
mencantumkan nama paket pekerjaan dan alamat
Pokja ULP.
2.1. Any pre-qualification document received by the bid 2.1 Setiap Dokumen Isian Pra-Kualifikasi yang
committee after the submission deadline for Pre- diterima oleh Pokja ULP setelah batas akhir waktu
Qualification Document will be rejected. pemasukan Dokumen Isian Pra-Kualifikasi akan
ditolak.
2.2. Pre-Qualification Document sent by post / courier 2.2 Dokumen Isian Pra-Kualifikasi yang disampaikan
service and received after the submission deadline melalui pos/ jasa pengiriman dan diterima oleh
for Pre-Qualification Document, the Bid Committee Pokja ULP setelah batas akhir waktu pemasukan
will open the envelope to find out the name and Dokumen, maka Pokja ULP membuka sampul luar
address of applicants, as well as notify the untuk mengetahui nama dan alamat perusahaan
Applicant concerned to take the document back, peserta, serta memberitahukan kepada
accompanied by document receipt. perusahaan peserta yang bersangkutan untuk
mengambil kembali penawaran tersebut disertai
dengan bukti serah terima.
10
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
3.3 The Bid Committee shall clarify and / or verify 3.3. Pokja ULP melakukan klarifikasi dan/ atau
documents to the issuer, if necessary. verifikasi kepada penerbit dokumen, bila
diperlukan.
3.4 If the result of verification and clarification indicate 3.4. Apabila hasil pembuktian kualifikasi ditemukan
falsification of data, then the applicant is pemalsuan data, maka perusahaan peserta
terminated, business entities and / or managers digugurkan, badan usaha dan/ atau pengurusnya
will be listed in the Black List. dimasukkan dalam Daftar Hitam.
Results of Pre-Qualification wiil be informed to all Hasil Pra-Kualifikasi setelah ditetapkan oleh Pokja
participants and published on the website specified ULP disampaikan kepada semua peserta
in the QDS and the official announcement to the kualifikasi dan diumumkan oleh Pokja ULP melalui
community boards after getting No Objection Letter website yang ditentukan dalam LDK dan papan
from IDB pengumuman resmi untuk masyarakat setelah
mendapat persetujuan IDB.
c. abuse of authority by the Bid Committee and / c. penyalahgunaan wewenang oleh Pokja ULP
or other competent authority. dan/ atau pejabat yang berwenang lainnya.
3.3. The Bid Committee must provide written answers 3.3. Pokja ULP wajib memberikan jawaban tertulis atas
to all objections within 3 (three) working days after semua sanggahan paling lambat 3 (three) hari
receiving a letter of rebuttal. kerja setelah menerima surat sanggahan.
3.4. If the objection is proven then the Bid Committee 3.4. Apabila sanggahan dinyatakan terbukti, maka
shall declare the pre-qualification failed. Pokja ULP harus menyatakan pelelangan gagal.
11
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
3.5. If the objection is not submitted to the Bid 3.5. Sanggahan yang disampaikan bukan kepada
Committee or over the time period, the objection Pokja ULP atau disampaikan diluar masa
shall be regarded as a complaint and has to be sanggah, dianggap sebagai pengaduan dan tetap
responded. harus ditanggapi.
3.6. There is no appeal right for the objection in the 3.6. Tidak ada sanggahan banding dalam proses pra-
pre-qualification process. kualifikasi.
12
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
SECTION IV: QUALIFICATION DATA SHEET BAB IV: LEMBAR DATA KUALIFIKASI (LDK)
(QDS)
A. Scope of Pre-Qualification A. Lingkup Pra-Kualifikasi
Name of the Bid Committee: The Bid Committee Nama Panitia Lelang: Pokja ULP UI (Project No.
under IDB Financing (Project No. IND-137) IND-137 funded by IDB)
Address: Sekretariat PIU, Fakultas Kedokteran, Alamat: Sekretariat PIU, Fakultas Kedokteran,
Universitas Indonesia, Jalan Salemba Raya No. 6, Universitas Indonesia, Jalan Salemba Raya No. 6,
Jakarta 10430, DKI Jakarta – Indonesia Jakarta 10430, DKI Jakarta – Indonesia
E-mail: idb.piu@ui.ac.id or merc.fkui@gmail.com E-mail: idb.piu@ui.ac.id atau merc.fkui@gmail.com
Name of package : Civil Works of Medical Research Nama paket: Pekerjaan Pembangunan Pusat
Center for University of Indonesia (IND-137) Pendidikan dan Penelitian Kedokteran UI (IND-137)
13
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
14
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
[Integrity Pact sample for firm without Joint Operation/ Contoh Pakta Integritas Badan Usaha Tanpa
Kemitraan]
Acting for and on : PT/CV_____________[select appropriate and include the names/ pilih yang sesuai dan
behalf/ cantumkan nama]
Bertindak untuk dan
atas nama
2. will report to the APIP University of Indonesia and / or LKPP know if there are indications of this corruption in the
procurement process/
akan melaporkan kepada APIP Universitas Indonesia dan/atau LKPP apabila mengetahui ada indikasi KKN dalam
proses pengadaan ini;
3. will follow the procurement process in a clear, transparent, and professionals to deliver the best work in accordance with
the laws and regulations;/
akan mengikuti proses pengadaan secara bersih, transparan, dan profesional untuk memberikan hasil kerja terbaik
sesuai ketentuan peraturan perundang-undangan;
4. when breaking the things stated in this INTEGRITY PACT, is willing to accept an administrative sanction, sanctioned the
inclusion in the Black List, was sued in civil and / or reported offenses./
apabila melanggar hal-hal yang dinyatakan dalam PAKTA INTEGRITAS ini, bersedia menerima sanksi
administratif, menerima sanksi pencantuman dalam Daftar Hitam, digugat secara perdata dan/ atau dilaporkan
secara pidana.
__________[Place/ tempat], __ [Date/ tanggal] __________ [Month/ bulan] 20__ [Year/ tahun]
Meterai Rp.6000,-
15
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
[Integrity Pact sampel for Joint Operation (J.O)/ Contoh Pakta Integritas dengan kemitraan (KSO)]
Acting for and on : PT/CV_____________[select appropriate and include the names/ pilih yang sesuai
behalf/ dan cantumkan nama]
Bertindak untuk dan Joint Operation with/ Bekerjasama dengan PT/ CV_____________ [Only for joint
atas nama operation/ bagi Badan Usaha yang bermitra]
ID No/ No.Identitas : ___________ [filled with no.ID cards, driver's license or passport
/ diisi dengan no. KTP, SIM atau paspor]
Acting for and on : PT/CV_____________[select appropriate and include the names/ pilih yang sesuai
behalf/ dan cantumkan nama]
Bertindak untuk dan Joint Operation with/ Bekerjasama dengan PT/ CV_____________ [Only for joint
atas nama operation/ bagi Badan Usaha yang bermitra]
2. will report to the APIP University of Indonesia and/ or LKPP know if there are indications of this corruption in the
procurement process/
akan melaporkan kepada APIP Universitas Indonesia dan/ atau LKPP apabila mengetahui ada indikasi KKN dalam
proses pengadaan ini;
3. will follow the procurement process in a clear, transparent, and professionals to deliver the best work in accordance with
the laws and regulations;/
akan mengikuti proses pengadaan secara bersih, transparan, dan profesional untuk memberikan hasil kerja terbaik
sesuai ketentuan peraturan perundang-undangan;
16
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
6. when breaking the things stated in this INTEGRITY PACT, is willing to accept an administrative sanction, sanctioned the
inclusion in the Black List, was sued in civil and/ or reported offenses./
apabila melanggar hal-hal yang dinyatakan dalam PAKTA INTEGRITAS ini, bersedia menerima sanksi
administratif, menerima sanksi pencantuman dalam Daftar Hitam, digugat secara perdata dan/ atau secara pidana.
__________[Place/ tempat], __ [Date/ tanggal] __________ [Month/ bulan] 20__ [Year/ tahun]
[Name of firm 1/ Nama Penyedia 1 ] [Name of firm 1/ Nama Penyedia 1 ] [Name of firm 1/ Nama Penyedia 1 ]
Meterai Rp.6000,-
17
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
FORM IV : ORGANIZATION CHART (2) .................25 FORM IV : ORGANIZATION CHART (2) ................ 25
FORM VII: AMOUNT OF CONTRACT VALUE FORM VII: AMOUNT OF CONTRACT VALUE
WITHIN LAST FIVE Years.....................31 WITHIN LAST FIVE Years .................... 31
FORM VIII: LIST OF FIRM SHAREHOLDER ........... ..32 FORM VIII: LIST OF FIRM SHAREHOLDER ............ . 32
FORM IX: LIST OF LEGAL DOCUMENTS FORM IX: LIST OF LEGAL DOCUMENTS
INCLUDING Licenses ........................ ..33 INCLUDING Licenses ......................... . 33
FORM XII: FIRM’S PERFORMANCE RECORDS FORM XII: FIRM’S PERFORMANCE RECORDS
OR COMPLETED WORKS FOR OR COMPLETED WORKS FOR
LAST 10 (TEN) YEARS.........................40 LAST 10 (TEN) YEARS ........................ 40
FORM XIII: FIRM’S PERFORMANCE RECORDS OF ON FORM XIII: FIRM’S PERFORMANCE RECORDS OF ON
GOING Contract..............................41 GOING CONTRACT.................................................41
18
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Name of Contractor/ :
Nama Kontraktor
The Attached pre-qualification Form II to XIV inclusive are part of this application
Format II sampai XIV isian kualifikasi terlampir sebagai bagian dari aplikasi ini
19
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
I the undersigned/
Saya yang bertanda tangan di bawah ini:
Name/ Nama : ______________________[ legal representative's name of the business entity/
nama wakil sah badan usaha]
E-mail : ___________________________________
1. I legally have the capacity to sign a contract by notarial act__________________________ [according to the deed of
establishment/ amendment/ power of attorney, stated clearly the number and date of the deed of establishment/ change/
power of attorney. If the partnership/ joint operation then added Letter of Partnership Agreement/ J.O]
saya secara hukum mempunyai kapasitas menandatangani kontrak berdasarkan Akte
Notaris___________________________
[sesuai akta pendirian/ perubahannya/ surat kuasa, disebutkan secara jelas nomor dan tanggal akta pendirian/
perubahan/ surat kuasa. Jika kemitraan/ KSO maka ditambah Surat Perjanjian Kemitraan/ KSO];
4. I am not and will not be involved conflicts of interest with the parties concerned, directly or indirectly in this procurement
process/
saya tidak sedang dan tidak akan terlibat pertentangan kepentingan dengan para pihak yang terkait, langsung
maupun tidak langsung dalam proses pengadaan ini;
5. Business entity that I represent are not included in the Black List, not under the supervision of the courts, not
bankruptcy, and business activity is not being discontinued/
Badan usaha yang saya wakili tidak masuk dalam Daftar Hitam, tidak dalam pengawasan pengadilan, tidak pailit, dan
kegiatan usahanya tidak sedang dihentikan;
6. one and/ or all of the management entity that I represent are not included in the Black List;/
salah satu dan/atau semua pengurus badan usaha yang saya wakili tidak masuk dalam Daftar Hitam;
20
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
7. Name and position of person who may contacted for further information/
Nama dan jabatan personil yang dapat dihubungi untuk informasi lebih lanjut:
Name/ Nama Position/ Jabatan Phone/ Telepon
________________ Administration Manager/ Manajer Administrasi ______________
________________ Technical Manager/ Manajer Teknik ______________
________________ Financial Manager/ Manajer Keuangan ______________
8. data business entity I represent and expressed in the form III to XIV is correct/
data-data badan usaha yang saya wakili dan dinyatakan dalam format III sampai XIV adalah benar
Similarly, this statement I make with the actual and full sense of responsibility. If later found that the data/ documents that I
have to say is not true and there is forgery, then I and the business entity that I represent would be liable to administrative
sanctions, sanctions the inclusion in the Black List, acivil law suit, and/ or reporting the crime to the authorized in accordance
with the provisions of the legislation
Demikian pernyataan ini saya buat dengan sebenarnya dan penuh rasa tanggung jawab. Jika dikemudian hari ditemui
bahwa data/ dokumen yang saya sampaikan tidak benar dan ada pemalsuan, maka saya dan badan usaha yang saya
wakili bersedia dikenakan sanksi berupa sanksi administratif, sanksi pencantuman dalam Daftar Hitam, gugatan secara
perdata, dan/ atau pelaporan secara pidana kepada pihak berwenang sesuai dengan ketentuan peraturan perundang-
undangan.
(Full name of Authorized firms/ nama lengkap wakil sah badan usaha)
[Position on firm/ jabatan pada badan usaha]
21
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
B. If the Applicant is a corporation, answer/ Jika peserta adalah badan usaha, jawab:
22
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
C. If the Application is a Joint Operation answer the followings/ Jika peserta merupakan kerjasama
operasi jawab pertanyaan berikut:
1. Leading Firm/
Pemimpin Kemitraan : ________________________________________
________________________________________
The Applicant should attach additional description for all member companies.
23
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Please give a sufficient description of a corporation or each member company joint operation as indicated in
the following. The Applicant should attach additional sheets wherever necessary/ Jelaskan deskripsi peserta
dan anggota kemitraan seperti permintaan berikut. Perusahaan Peserta dapat menyampaikan lembaran
tambahan jika diperlukan.
1. Name of a corporation of a company/ Nama Badan Usaha : _______________________________
(Full name of Authorized firms/ nama lengkap wakil sah badan usaha)
[Position on firm/ jabatan pada badan usaha]
24
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Please indicate an organization chart with a description of work division of the project, which Applicant is
planning to execute by self or by his member companies in case of joint operation./
Gambarkan diagram organisasi dan jelaskan deskripsi untuk setiap bagian kerja proyek, perusaahan peserta
yang berencana akan melaksanakan proyek secara sendiri atau dengan perusahaan peserta dalam hal
kemitraan.
25
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
BALANCE SHEET
(...................................)
Assets
A. Current Assets
All in IDR (Rupiah)
equivalent to US$
(Exchange rate use 1 US$
= Rp 10.000,00)
26
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
B. Fixed Assets
27
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
A. Current Liabilities
1. Account Payable ……………………………………
2. Loan Payable …………………………………………
3. Notes payable…………………………………………
4. Other Current Liabilities……………………………..
a. ………………………… Rp ………(US $)…
b. ………………………… Rp ………(US $)...
c. ………………………… Rp ………(US $)…
d. ………………………… Rp ………(US $)... (+)
C. Capital
1. Stock Holder ………………………………………… Rp ………(US $)...
2. Retained Earning (Deficit) …………………………. Rp ………(US $)...
3. Allowance/ Reserve ……………………………….. Rp ………(US $)...
4. Income (Loss) for the year …………………………. Rp ………(US $)...
5. ………………………………………………………….
____________________________ ____________________________
Place and Date The Representative
Certified by …………………………………. 1)
Date ………………………………………….
Signature and Stamp ………………………
Note :
(1) Registered Public Accountant
28
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
A. Selling Expenses
………………………………… Rp ………(US $)...
………………………………… Rp ………(US $)...
………………………………… Rp ………(US $).... (+)
29
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
V. Other Expenses
____________________________ ____________________________
Place and Date The Representative
Certified by …………………………………. 1)
Date ………………………………………….
Signature and Stamp ………………………
Note :
(1) Registered Public Accountant
30
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Certified by ……………………………… 1)
Date ………………………………………
Signature and Stamp …………………..
Note :
(1) Registered Public Account.
31
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
32
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
A. Notarial Act including its latest amendment (if any)/ Akte pendirian perusahaan dan perubahannya
(jika ada)
1. Notarial Act/ Akte Pendirian
a. No. Act/ Nomor Akta : _______________
b. Date of Issued/ Tanggal Diterbitkan : _______________
c. Name of Notary/ Nama Notaris : _______________
2. Latest Amendment Notarial Act (if any)/
Akta Perubahan Terakhir (Jika ada)
a. No. Act/ Nomor Akta : _______________
b. Date of Issued/ Tanggal Diterbitkan : _______________
c. Name of Notary/ Nama Notaris : _______________
B. Permit and certificate of Firms/ Ijin usaha dan sertifikat badan usaha
1. Business Permit for Trading/ Surat Izin Usaha Perdagangan (SIUP)
a. Permit for Trading No/ No. Surat Izin
_____________
Usaha Perdagangan :
Date of Issued/ Tanggal diterbitkan________
b. Date of expired/ Tanggal daluwarsa : _______________
c. Issuer of permit/ Instansi pemberi izin
: _______________
usaha
2. Business Permit for National Construction Services/ Ijin Usaha Jasa Konstruksi (IUJK)
3. Certificate for business Entity for Construction Execution Services/ Sertifikat Badan Usaha Jasa
Konstruksi (SBUJK)
Date of
Registered No./ Certificate description/ Issued by/ Date of Issued/ Expired/
No.
No. Register Deskripsi sertifikat diterbitkan oleh Tanggal diterbitkan Tanggal
daluwarsa
33
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
2. Tax/ Pajak
Registration Number of Tax/ Nomor Pokok Wajib Pajak (NPWP)
NPWP : _______________________
Issuer /Dikeluarkan oleh : ________________________
34
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
1. Audited Financial Statements for the Last Three Years/ Audit keuangan untuk tiga tahun terakhir
Audited by/ di audit oleh :
Name of Public Accountant Office/
Nama Kantor Akuntan Publik : _________________________
Address/ Alamat : _________________________
Date of Audited/ Tanggal dilakukan audit : _________________________
Name of auditor/ Nama auditor : _________________________
Register No of auditor/ No register Auditor : _________________________
35
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
36
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Note *) Please attach a copy of each expertise certification (SKK/SKA)/ Lampirkan salinan Sertifikat keahlian
**) Please attach a copy of academic certificate/ Lampirkan salinan ijasah terakhir
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
37
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
i. Experience/ Pengalaman
Description of Work
Assigned Position/
Engaged/ Deskripsi Name of firm/ Nama Reference/
Year/Tahun Posisi dalam
Pekerjaan yang Perusahaan Referensi
proyek
ditangani
This statement is made with the actual and full sense of responsibility. If later found that the data/ documents that I have to
say is not true and there is forgery, then I and a business entity would be liable to administrative sanctions, sanctions the
inclusion in the Black List, a civil law suit, and/ or reporting the crime to the authorized in accordance with the provisions of
the legislation.
Demikian pernyataan ini saya buat dengan sebenarnya dan penuh rasa tanggung jawab. Jika dikemudian hari ditemukan
bahwa data/ dokumen yang saya sampaikan tidak benar dan ada pemalsuan, maka saya dan badan usahanya bersedia
dikenakan sanksi berupa sanksi administratif, sanksi pencantuman dalam Daftar Hitam, gugatan secara perdata, dan/ atau
pelaporan secara pidana kepada pihak berwenang sesuai dengan ketentuan peraturan perundang-undangan.
(Full name of Authorized and position on firms/ Name of personil/ nama personil
nama lengkap dan jabatan wakil sah badan usaha) Position Proposed/Jabatan yang diusulkan.
38
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Form XI: List of equipments and facilites available for the work/
Format XI: Daftar peralatan dan fasilitas yang tersedia untuk pekerjaan
Existing Output
Type of equipment and Merk and Year of
Quantity/ Capacity/ Kapasitas Condition(%)/ Existing Location/ Ownership**/ Kepemilikan**
No. facility/ Jenis Peralatan Type/ Merk Manufacture/
Jumlah atau output pada Kondisi (%) Lokasi sekarang
dan Fasilitas dan tipe Tahun pembuatan
saat ini
1 2 3 4 5 6 7 8 9
Note **) State whether owned, rented, hired – purchased, or to be rented or hired – purchased
If rented/ hired – purchased (or to be rented/ hired – purchased) include rental/ hired – purchased
Agreement (or letter of item)
Ket. **) Nyatakan dalam milik sendiri, sewa, sewa-beli atau rencana disewa atau rencana sewa-beli
Jika disewa/ sewa-beli (atau rencana akan sewa/ sewa beli) termasuk rencana disewa atau
perjanjian rencana sewa-beli (atau keterangannya)
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
39
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Form XII: Firm’s Performance Records or Completed Works for Last 10 (ten) Years/
Format XII: Pengalaman perusahaan atau daftar pekerjaan selama 10 (sepuluh) tahun terakhir
Owner/ Pemberi Tugas Contract**/ Kontrak** Completion Date/ Tanggal Selesai
Name of Work Description
Dated
Packages/ of works/ Address and Amount Date of Contract Certificate of Completion/
No. Location/ Lokasi and No./
Nama Paket Deskripsi Name/ Nama Phone/ Alamat (USD)/ Nilai Expiry/ Tanggal Sertifikat Penyelesaian
No. dan
Pekerjaan Pekerjaan* dan Telepon (USD) Akhir Kontrak Pekerjaan
Tanggal
1 2 3 4 5 6 7 8 9 10
Note : * Description of Main or Subcontractor Leading Firm or Member of Joint Operation including field of work consist number of stories and building area
** Please attach copy of Contract Document, if applicable, including contract addendum/ amandement, and certificate of completion
Ket. : * Deskripsi dari perusahaan kontraktor utama atau sub-kontraktor atau anggota kemitraan termasuk jenis pekerjaan dengan jumlah lantai dan luasannya
** Lampirkan salinan dokumen kontrak, jika ada, termasuk addendum/ amandemen kontrak, dan sertifikat penyelesaian pekerjaan
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
40
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Note : * Description of Main or Subcontractor Leading Firm or Member of Joint Operation including field of work consist number of stories and building area
** Please attach copy of contract document with minute of progress report
Ket. : * Deskripsi dari perusahaan kontraktor utama, sub-kontraktor atau anggota kemitraan termasuk jenis pekerjaan, jumlah lantai dan luasannya
** Lampirkan salinan dokumen kontrak termasuk berita acara laporan kemajuan
Place and Date/ tempat dan tanggal The Representative/ wakil perusahaan
41
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Name: name of the legitimate representatives of Nama: nama wakil sah badan usaha sesuai dengan
business entities according to legal document dokumen yang sah
ID No.: filled with no.ID cards, driver's license or No.Identitas: diisi dengan no. KTP, SIM atau paspor
passport
Position: filled with the curent possition at the firm Jabatan: diisi sesuai dengan jabatan saat ini
Signature: signed and stamp of firm Tandatangan: bubuhkan tandatangan dan distempel
sah perusahaan
Place: filled the place where the integrity pact is made Tempat: diisi tempat dimana pakta integritas dibuat
Form I Format I
Ref. No.: filled with the reference letter Surat No.: diisi dengan nomor surat
Date of Application: Fill in with the date of PQ document Tanggal Penyampaian: Diisi dengan tanggal
submission pemasukan dokumen PQ
Form II Format II
1. Name of signature according to the deed of 1. Nama penandatangan sesuai akta pendirian/
establishment/ amendment/ power of attorney, perubahannya/ surat kuasa, disebutkan secara
stated clearly the number and date of the deed of jelas nomor dan tanggal akta pendirian/
establishment/ change/ power of attorney. If the perubahan/ surat kuasa. Jika kemitraan/ KSO
partnership/ joint operation then added Letter maka ditambah Surat Perjanjian Kemitraan/
Partnership Agreement/ J.O KSO;
2. Name and position of person who may be 2. Nama dan jabatan personil yang dapat dihubungi
contacted for further information is name of the adalah nama personil yang diusulkan dan
proposed personnel and is responsible for this bertanggung jawab untuk proyek ini
project
B. Fill in the name of Representative, nationality and B. Diisi sesuai dengan nama yang mewakili
address according to Identity number. perusahaan, kewarganegaraan dan alamat sesuai
dengan KTP
42
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
C. Description of Applicant C. Deskripsi Peserta
Please give a sufficient description of a corporation Jelaskan deskripsi peserta dan anggota kemitraan
or each member company joint operation as seperti permintaan berikut. Peserta dapat
indicated in the following. The Applicant should menyampaikan lembaran tambahan jika diperlukan
attach additional sheets wherever necessary (a) Sejarah: Menjelaskan secara singkat pendirian
(a) History: Briefly explain the establishment of perusahaan, bidang bisnis dan perkembangan
companies, business and development of firm to perusahaan sampai saat ini (maksimum 250
date (maximum 250 words). kata).
(b) Main lines of bussiness: Breifly line of bussiness (b) Bidang usaha: menjelaskan bidang usaha
after establishment of companies to now sejak perusahaan didirikan sampai sekarang.
(c) Board of Director and responsibilities: Fill in the (c) Direksi dan Tanggung Jawab: diisi nama
name of board director members and their direksi saat ini.
Form VII: Amount of Sales Within Last Three Years Format VII: Penghasilan selama tiga tahun terakhir
Should be audited by a registered public accountant Harus diaudit oleh akuntan publik yang terdaftar
Form VIII: List of Shareholder Structure Format VIII: Daftar Pemilik Perusahaan
Contained the name of the company's ownership in Diisikan nama kepemilikan perusahaan sesuai dengan
accordance with the Deed of recent changes including akte perubahan terakhir termasuk prosentase
the percentage of ownership kepemilikan
Form IX: List of Legal Documents including Format IX: Daftar Dokumen Keabsahaan
Licenses Administrasi termasuk Lisensi
A. Notary Act A. Akte Notaris
1. Filled with the number, date and name of the 1. Diisi dengan nomor, tanggal dan nama notaris
issuer deed of notary businesses penerbit akta pendirian badan usaha.
2. Filled with the number, date and name of the 2. Diisi dengan nomor, tanggal dan nama notaris
notary issuing entity deed of recent changes, if penerbit akta perubahan terakhir badan usaha,
any apabila ada
43
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
c. Filled with the number and date of proof of c. Diisi dengan nomor dan tanggal bukti laporan
monthly reports (last three months): bulanan (tiga bulan terakhir):
1) PPH section 21; 1) PPH pasal 21;
2) PPH Article 23; 2) PPH pasal 23;
3) PPH 25/pasal article 29; 3) PPH pasal 25/ pasal 29;
4) VAT. 4) PPN.
44
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Form X: List of personnel Format X: Daftar personil
Fill in the names of personnel who will be involved, Isikan nama-nama personil yang akan dilibatkan
including the positions and educational backgrounds, termasuk posisi dan latar belakang pendidikan,
skills and certificates held keahlian dan sertifikat yang dimiliki
Form XI: List of equipment and facility of firm Format XI: Daftar peralatan dan fasilitas yang
available for the work dimiliki perusahaan
Filled with the type, quantity, capacity or output can be Diisi dengan jenis, jumlah, kapasitas atau output yang
achieved at this point, the brand and type, year of dapat dicapai pada saat ini, merek dan tipe, tahun
manufacture, condition (in percentage), the location of pembuatan, kondisi (dalam persentase), lokasi
the current status and ownership/ lease support (own/ keberadaan saat ini dan status kepemilikan/ dukungan
lease purchase/ lease) of each each facility/ equipment/ sewa (milik sendiri/ sewa beli/ sewa)dari masing-
supplies needed. Proof of ownership status should be masing fasilitas/ peralatan/ perlengkapan yang
indicated at the time of verification of Qualifications. diperlukan. Bukti status kepemilikan harus dapat
ditunjukkan pada waktu Pembuktian Kualifikasi.
Form XII: Performance Records of Completed Format XII: Pengalaman perusahaan dari daftar
Works for Last 10 (ten) Years By Participant pekerjaan selama 10 (sepuluh) tahun terakhir
Filled with the name of the work packages, sub-fields of Diisi dengan nama paket pekerjaan, subbidang
work required, the location where the execution of the pekerjaan yang dipersyaratkan, lokasi tempat
work, name and address/ phone of the assigning party/ pelaksanaan pekerjaan, nama dan alamat/ telepon dari
Author Officer Commitment, number/ date and value of pemberi tugas/ Pejabat Pembuat Komitmen, nomor/
the contract, the date of completed work packages tanggal dan nilai kontrak, tanggal selesai paket
according to the contract, and the date of the Minutes of pekerjaan menurut kontrak, dan tanggal Berita Acara
the handover (PHO), for each work package for 10 (ten) serah terima (PHO), untuk masing-masing paket
years. pekerjaan selama 10 (sepuluh) tahun terakhir.
Form XIII: Performance Records of On Going Format XIII: Kinerja perusahaan dari kontrak yang
Contract By Participant sedang dilaksanakan
Filled with the name of the work packages including Diisi dengan nama paket pekerjaan, termasuk
description of main or subcontractor leading firm or deskripsikan dengan jelas sebagai kontrak utama, sub-
member of Joint Operation include of field of work kontraktor atau sebagai pemimpin kemitraan termasuk
consist number of stories and building area, the location jenis pekerjaan jumlah lantai dan luasannya, lokasi
where the execution of the work, name and address/ tempat pelaksanaan pekerjaan, nama dan alamat/
phone of the assigning party/ Author Officer telepon dari pemberi tugas/ Pejabat Pembuat
Commitment, number/ date and value of the contract, Komitmen, nomor/ tanggal dan nilai kontrak, tanggal
the date of completed work packages according to the selesai paket pekerjaan menurut kontrak, dan tanggal
contract, and the date of the Minutes of the progress Berita Acara kemajuan pekerjaan dan prestasi
and percentage of progress. kemajuan pekerjaan dalam persen
45
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
SAMPLE/ CONTOH
LETTER OF PARTNERSHIP/ JOINT OPERATION AGREEMENT (JO)
SURAT PERJANJIAN KEMITRAAN/KERJA SAMA OPERASI (KSO)
intend to participate in the bidding and implementation of contracts together in partnerships/ Joint Operation (JO)/
bermaksud untuk berpartisipasi pada pelelangan dan pelaksanaan kontrak secara bersama-sama dalam bentuk kemitraan/
Kerja Sama Operasi (KSO).
3. Each participant member of the partnership/ joint operation, will take the appropriate sharing in point 2, in terms of
expenses, profits, and losses of a partnership/ joint operation/.
Masing-masing peserta anggota kemitraan/ KSO, akan mengambil bagian sesuai modal yang tercantum pada butir 2,
dalam hal pengeluaran, keuntungan, dan kerugian dari kemitraan/ KSO.
4. Share holding in a partnership/ joint operation will not be altered either during the offer period or throughout the contract
period, except with the prior written consent of Project Manager (PM) and the written mutual consent from each
member of the partnership/ KSO.
Pembagian modal dalam kemitraan/ KSO ini tidak akan diubah baik selama masa penawaran maupun sepanjang
masa kontrak, kecuali dengan persetujuan tertulis terlebih dahulu dari Manajer Proyek (MP) dan persetujuan bersama
secara tertulis dari masing-masing anggota kemitraan/ KSO.
46
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
5. Apart from sharing the set above, each member of the partnership/ JO will perform a full control over all aspects of the
implementation of this agreement, including the right to inspect the financial, purchase orders, receipts, lists of
equipment and labor, subcontracting agreements, letters correspondence, and others/
Terlepas dari modal yang ditetapkan diatas, masing-masing anggota kemitraan/ KSO akan melakukan pengawasan
penuh terhadap semua aspek pelaksanaan dari perjanjian ini, termasuk hak untuk memeriksa keuangan, perintah
pembelian, tanda terima, daftar peralatan dan tenaga kerja, perjanjian subkontrak, surat-menyurat, dan lain-lain.
6. Authority to sign for and on behalf of a partnership/ joint operation given to/ Wewenang menandatangani untuk dan
atas nama kemitraan/ KSO diberikan kepada _________________________ [name of representative participants/
nama wakil peserta] in his capacity as chief executive/ managing director of/ dalam kedudukannya sebagai direktur
utama/ direktur pelaksana _________________________ [name of participant 1/ nama peserta 1] based on the written
approval of all members of the partnership (JO)/ berdasarkan persetujuan tertulis dari seluruh anggota kemitraan/
KSO.
8. This Agreement automatically becomes null and void if the auction is not won by the company/ partnership KSO.
Perjanjian ini secara otomatis menjadi batal dan tidak berlaku lagi bila pelelangan tidak dimenangkan oleh perusahaan
kemitraan/ KSO.
9. This agreement is made in duplicate ____ (_______) that each has the same legal force.
Perjanjian ini dibuat dalam rangkap ____ (_______) yang masing-masing mempunyai kekuatan hukum yang sama.
WITH THIS AGREEMENT all members of partnerships/ KSO sign on date __________ _________ day of
________________________ ____________, __________ months_____year______
DENGAN KESEPAKATAN INI semua anggota kemitraan/ KSO membubuhkan tanda tangan di _________ pada hari
__________ tanggal __________ bulan ____________, tahun ________________________
(_______________) (________________)
(________________) (________________)]
Note/ Catatan:
Letter of Agreement Partnership/ Joint Operation shall be made on a paper sealed/
Surat Perjanjian Kemitraan/ Kerja Sama Operasi ini harus dibuat diatas kertas segel
47
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
2. have a business license in accordance with the laws 2. memiliki izin usaha sesuai dengan peraturan
and regulations (Form IX); perundang-undangan (Format IX);
3. submit statements/ written acknowledgment that the 3. menyampaikan pernyataan/ pengakuan tertulis
company and its management are not in the court's bahwa perusahaan yang bersangkutan dan
supervision, not bankrupt, its business activity is not manajemennya tidak dalam pengawasan pengadilan,
being suspended and/ or directors are acting for and tidak pailit, kegiatan usahanya tidak sedang
on behalf of the company is not currently in serving dihentikan dan/ atau direksi yang bertindak untuk dan
any criminal sentence (Form II); atas nama perusahaan tidak sedang dalam menjalani
sanksi pidana (Format II);
4. any and/ or all of its officers and agencies are not 4. salah satu dan/ atau semua pengurus dan badan
included in the Black List (Form II and VIII); usahanya tidak masuk dalam Daftar Hitam (Fomat II
and VIII);
5. have a TIN and has fulfilled the last tax year tax 5. memiliki NPWP dan telah memenuhi kewajiban
liability (SPT) and has a monthly report Article 21 perpajakan tahun pajak terakhir (SPT Tahunan) serta
Income Tax, Income Tax Article 23 (if any memiliki laporan bulanan PPh Pasal 21, PPh Pasal
transaction), Income Tax Section 25/ Pasal 29 and 23 (bila ada transaksi), PPh Pasal 25/ Pasal 29 dan
VAT (for Taxable Tax) at least 3 (three) last month in PPN (bagi Pengusaha Kena Pajak) paling kurang 3
the current year. Participants can replace this (tiga) bulan terakhir dalam tahun berjalan.
requirement by submitting a Certificate of Fiscal/ Perusahaan peserta dapat mengganti persyaratan ini
SKF; (Form V; VI; VII; and IX Point D) dengan menyampaikan Surat Keterangan Fiskal/
SKF (Format V; VI; VII dan IX butir D);
6. obtain at least 1 (one) job as the provider within 4 6. memperoleh paling sedikit 1 (satu) pekerjaan sebagai
(four) years, both within government and private penyedia dalam kurun waktu 4 (empat) tahun
sector including subcontracting experience (Form terakhir, baik di lingkungan pemerintah maupun
XII); swasta termasuk pengalaman subkontrak (Format
XII);
7. have the ability to sub-field of suitable work (Form III 7. memiliki kemampuan pada sub bidang pekerjaan
and Form IX point B); yang sesuai (Format III dan Format IX butir B)
8. have the ability to provide facilities and equipment 8. memiliki kemampuan menyediakan fasilitas dan
and personnel for the execution of work (Form IV; X peralatan serta personil yang diperlukan untuk
and XI); pelaksanaan pekerjaan (Format IV; X dan XI);
9. submit a list of on going contract (Form XIII); 9. menyampaikan daftar perolehan pekerjaan yang
sedang dikerjakan (Format XIII);
10. has a certificate of financial support from government 10. memiliki surat keterangan dukungan keuangan dari
banks/ private sector to participate in the bank pemerintah/ swasta untuk mengikuti pengadaan
procurement of construction work at least 10% (ten pekerjaan konstruksi paling kurang 10% (sepuluh
percent) of the total value of HPS (Form IX point F) ; persen) dari nilai total HPS (Format IX butir F);
48
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
11. in the event that a participant will do partnerships/ 11. dalam hal peserta akan melakukan kemitraan/ KSO
KSO (Annex – A): (Lampiran A):
a. participants must have a Co-operation a. peserta wajib mempunyai perjanjian Kerja Sama
agreement/ partnership that includes the Operasi/ kemitraan yang memuat persentase
percentage of partnership/ joint operation and kemitraan/ KSO dan perusahaan yang mewakili
the company that represents a partnership/ joint kemitraan/ KSO tersebut;
operation is;
b. evaluation of requirements on the para 1 through b. evaluasi persyaratan pada angka 1 sampai
para 10 will be carried out for any company in dengan angka 10 dilakukan untuk setiap
the partenershp/ joint operation; perusahaan yang melakukan kemitraan/ KSO;
12. has a Basic Ability (KD) on the similar and 12. memiliki Kemampuan Dasar (KD) pada pekerjaan
complexity equivalent of work, provided that: yang sejenis dan kompleksitas yang setara,
dengan ketentuan:
a. KD = 3 NPT, NPT = highest value of a. KD= 3 NPT, NPT= Nilai Pengalaman Tertinggi
experience on suitable sub-areas of work within pada sub bidang pekerjaan yang sesuai dalam
10 (ten) years; 10 (sepuluh) tahun terakhir;
b. in terms of partnership/ joint operation, KD will b. dalam hal kemitraan/ KSO yang diperhitungkan
be calculated for company that representing a adalah KD dari perusahaan yang mewakili
partnership/ joint operation; kemitraan/ KSO;
c. KD at least equal to the total value of HPS; c. KD sekurang-kurangnya sama dengan nilai
d. corporate experience of the sub fields of work, total HPS;
contract value and status of the participants at d. pengalaman perusahaan dinilai dari sub bidang
the time of completing the previous contract pekerjaan, nilai kontrak dan status peserta
pada saat menyelesaikan kontrak sebelumnya;
e. value of work experience can be converted to e. nilai pengalaman pekerjaan dapat dikonversi
value of the present work (present value) using menjadi nilai pekerjaan sekarang (present
the following calculation: value) menggunakan perhitungan sebagai
berikut:
BPS index used is index of the largest Indeks BPS yang dipakai adalah indeks yang merupakan
component of the work; komponen terbesar dari pekerjaan;
13. have Sisa Kemampuan Paket (SKP), provided that: 13. mempunyai Sisa Kemampuan Paket (SKP),
a. SKP = KP - number of on going package of dengan ketentuan:
work a. SKP = KP – jumlah paket yang sedang
KP = Ability to handle package of work for non- dikerjakan
small scale business KP = 6 or KP = 1.2 N KP = Kemampuan menangani paket pekerjaan
N = Number of package of work that most can untuk usaha non kecil KP=6 atau KP=1,2 N
be handled at the same time during the N = Jumlah paket pekerjaan terbanyak yang
period of 5 (five) years; dapat ditangani pada saat bersamaan
selama kurun waktu 5 (lima) tahun
terakhir;
b. in terms of partnerships/ KSO, which taken into b. dalam hal kemitraan/ KSO, yang
account is SKP of all partner companies/ KSO; diperhitungkan adalah SKP dari semua
perusahaan yang bermitra/ KSO;
49
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
14. have a Certificate of Quality Management (ISO) 14. memiliki Sertifikat Manajemen Mutu (ISO) dan/ atau
and/ or have a Certificate of Safety Management memiliki Sertifikat Manajemen Keselamatan dan
and Occupational Health (K3), if required. [For Kesehatan Kerja (K3), apabila disyaratkan. [Untuk
business entities of the partnership company/ KSO, badan usaha yang bermitra/ KSO, persyaratan ini
this requirement is required for the companies that disyaratkan bagi perusahaan yang melaksanakan
perform the work that require a certificate of ISO pekerjaan yang membutuhkan Sertifikat ISO dan/
and/ or Certificate requirements K3]. atau persyaratan Sertifikat K3].
B. Bid Committee examine and compare the data entry B. Pokja ULP memeriksa dan membandingkan
requirements and participants in the Qualification persyaratan dan data isian peserta dalam Dokumen
Form in this document: Isian Kualifikasi dalam hal:
1. completeness of Qualification Form; and 1. kelengkapan Dokumen Isian Kualifikasi; dan
2. fulfillment of qualification requirements. 2. pemenuhan persyaratan kualifikasi.
E. Data may be completed at the latest by the end of E. Data yang kurang dapat dilengkapi paling lambat
the submission qualification Document. sebelum batas akhir pemasukan Dokumen
Kualifikasi
F. Passing Grade is 75.00 (seventy five) F. Ambang Lulus sebesar 75,00 (tujuh puluh lima)
Include the following assessment: Mencakup penilaian sebagai berikut:
1. Financial Assessment (The maximum value of 10 1. Penilaian Keuangan (Nilai maksimum 10 dan
and minimum value of 5) Nilai minimum 5)
2. Assessment Experience (maximum value of 60 2. Penilaian Pengalaman (nilai maksimum 60 dan
and minimum value 30) nilai minimum 30)
3. Assessment of technical capability (the maximum 3. Penilaian kemampuan teknis (nilai maksimum
value of 30 and the minimum value 15) 30 dan nilai minimum 15)
Rating: Penilaian:
For the Value Package (NP) of X, then if: Untuk Nilai Paket (NP) sebesar X, maka bila:
SKK X given a value of 100% SKK X diberikan nilai 100%
0.5 X <SKK <0.9 X given a value of 50% 0,5 X < SKK < 0,9 X diberikan nilai 50%
SKK <0.5 X given 0% SKK < 0,5 X diberi nilai 0%
50
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
where: dimana:
KK = Financial Capability KK = Kemampuan Keuangan
Fp = Turnover Share factor Fp = Faktor perputaran modal
Fp = 6 for service providers Small Business Fp = 6 untuk penyedia jasa Usaha Kecil
Fp = 7 for medium-scale service providers. Fp = 7 untuk penyedia jasa Usaha
Menengah.
Fp = 8 for Big Business service providers Fp = 8 untuk penyedia jasa Usaha Besar
MK = Working Capital MK = Modal Kerja
KB = Net Worth KB = Kekayaan Bersih
a = Current Assets a = Aktiva Lancar
b = Fixed Assets b = Aktiva Tetap
c = Other Assets c = Aktiva Lainnya
d = Short-Term Debt d = Utang Jangka Pendek
e = Long Term Debt e = Utang Jangka Panjang
Fl = Factor liquidity Fl = Faktor likuiditas
Fl = 0.3 for Small Business service Fl = 0,3 untuk penyedia jasa Usaha Kecil
providers Fl = 0,6 untuk penyedia jasa Usaha
Fl = 0.6 for medium-scale service providers Menengah
Fl = 0.8 for Large Business service Fl = 0,8 untuk penyedia jasa Usaha Besar
providers NK = Nilai kontrak dalam pelaksanaan
NK = value of the on going contract Prestasi = Nilai pekerjaan yang sudah
Achievements = The value of work already dilaksanakan
carried out NP = Nilai paket yang akan dilakukan
NP = Values packages will be procured pengadaannya
DB = Bank Support DB = Dukungan Bank
If the total value of time Finance Capabilities and Bila total nilai Sisa Kemampuan Keuangan dan
Bank Support less than 6.25 that the firm Dukungan Bank kurang dari 6,25 rekanan dinyatakan
disqualified/ FAIL the qualification. GUGUR/tidak lulus kualifikasi.
Assessment carried out on the experience of work Penilaian dilakukan terhadap pengalaman
ever done for 10 (ten) years. Work experience pekerjaan yang pernah dikerjakan selama 10
considered to be accompanied by proof of completion (sepuluh) tahun terakhir. Pengalaman pekerjaan
of the work both by service users. yang dinilai disertai bukti penyelesaian pekerjaan
dengan baik oleh pengguna jasa.
Procedures for assessment of the experience: Tata Cara penilaian pengalaman :
Assessment of the experience starts from the Penilaian pengalaman dimulai dari pekerjaan
work that has fields and sub fields similar to the yang mempunyai Bidang dan Sub Bidang yang
work to be auctioned, judged against the 3 (three) sama dengan pekerjaan yang akan dilelangkan,
elements on the numbers 1 through 3. dinilai terhadap 3 (tiga) unsur pada angka 1
sampai dengan 3.
If still not reached the maximum value, the Bila masih belum mencapai nilai maksimum,
assessment followed by a job with the same field penilaian dilanjutkan dengan pekerjaan dengan
but different sub-fields. Bidang yang sama tapi Sub Bidang berbeda.
Pekerjaan dengan Bidang yang berbeda dinilai
Work with different areas rated zero. nol.
51
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
Three elements are considered, namely: Tiga unsur yang dinilai, yaitu:
a. Field work (maximum 20 and minimum value of a. Bidang pekerjaan (nilai maksimum 20 dan
10; for each work package rated 5); minimal 10; untuk setiap paket pekerjaan diberi
nilai 5);
(1) experienced in the field of Architecture, (1) berpengalaman di bidang Arsitektural
Building and Sub Division plant mainly for the (2100), Sub Bidang Bangunan-bangunan
construction of a hospital-rise > 6 floors with Non Perumahanan Lainnya (21005) Gred-
a minimum building area of 20.000 m2 and 7 terutama untuk pembangunan rumah
the construction of campus-rise > 4 floors sakit bertingkat > 4 lantai dengan luas
with an area of > 50.000 m2 will get a weight bangunan minimal 20,000 m2 akan
of 100%. mendapat bobot 100%.
(2) experience in the field of Architecture, (2) berpengalaman di bidang Arsitektural
Building and Sub Division plant mainly for the (2100), Sub Bidang Bangunan-bangunan
construction of a hospital-rise 3-6 floors with Non Perumahanan Lainnya (21005) Gred-
a minimum area of 20.000 m2 and the 7 terutama untuk pembangunan rumah
construction of campus-rise >4 floors with an sakit bertingkat > 4 lantai dengan luas
area of> 50.000 m2 will get a weight of 80%. bangunan minimal 20,000 m2 dan
konstruksi untuk bangunan pendidikan
minimal 50.000 m2 akan mendapat bobot
80%.
(3) experienced in the field of Architecture, Sub (3) berpengalaman di bidang Arsitektural
Division Non-Building and the plant will get a (2100), Sub Bidang Bangunan-bangunan
weight of 50%. Non Perumahanan Lainnya (21005) Gred-
7 akan mendapat bobot 50%.
(4) experience in the field of non-architecture will (4) berpengalaman dibidang non-arsitektur
have the weight of 0%. akan mendapat bobot 0%.
b. Valuation of contract value (maximum value of 30 b. Penilaian besarnya nilai kontrak (nilai maksimum
and minimum 15; for each work package rated 30 dan minimal 15; untuk setiap paket pekerjaan
10) diberi nilai 10)
(1) Contract value 150 Billion, scored 100% (1) Nilai kontrak 150 Milyar, nilai 100%
(2) Contract value 100 billion to 150 billion, rated (2) Nilai kontrak 100 Milyar sampai 150 Milyar,
50% dinilai 50%
(3) Contract value <100 Billion, rated 0% (3) Nilai kontrak < 100 Milyar, dinilai 0%
If the total value of the experience gained less than Bila total nilai pengalaman yang diperoleh kurang
40, that thefirm disqualified / FAIL qualification. dari 40 , maka perusahaan yang bersangkutan
GUGUR/ tidak lulus kualifikasi.
3. Assessment of technical capability (the maximum 3. Penilaian kemampuan teknis (nilai maksimum 30,
value 30, minimum 15) minimum 15 )
Assessment equipment (the maximum value of Penilaian Peralatan (nilai maksimum 15 dan
15 and minimum 7.5) minimal 7.5)
Personnel Assessment (maximum value 10 Penilaian Personil (nilai maksimum 10 dan
and minimum 5) minimal 5)
Quality Management Certificate; Occupational Sertifikat Manajemen Mutu; Sertifikat
Health and Safety Management System Manajemen Kesehatan dan Keselamatan Kerja
Certificate (OHSAS-25001); and Good (SMK3) Pelaksanaan perusahaan sehat/GCG
corporate governance/GCC (maximum value 5 (nilai maksimum 5 dan minimal 2,5)
and minimum 2.5)
52
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
a. Assessment of Equipments (maximum 15 and a. Penilaian Peralatan (nilai maksimum 15 dan
minimum value 7.5) minimal 7.5)
Assessment carried out on the equivalence of the Penilaian dilakukan atas ekuivalensi kapasitas
capacity and number of equipments provided on dan jumlah alat yang disediakan terhadap
the capacity and number of equipment and kapasitas dan jumlah alat dan Kondisi alat yang
Conditions are taken into account only the diperhitungkan hanya yang kondisinya tidak
equipments that the condition is not less than kurang dari 70% (Baik). Penilaian kepemilikan
70% (Good). Assessment of ownership of peralatan sebagai berikut :
equipment as follows:
Possession itself (owned) with the evidence Kepunyaan sendiri dengan bukti dinilai 100%.
considered 100%. Sewa beli dengan bukti dinilai 100%
Hire purchase with proof rated 100% Sewa jangka panjang dengan bukti dinilai 90%
Long-term Lease with evidence rated 90% Sewa jangka pendek dengan bukti dinilai 50%
Short-term rental with evidence rated 50% Untuk sewa dan sewa beli yang tidak disertai
To lease and hire purchase are not bukti, nilai 0%.
accompanied by evidence, the value of 0%.
The value for each unit of equipment which Nilai untuk setiap unit peralatan yang diperhitungkan
accounted rated 0.5 except for tower cranes rated 2 diberi nilai 0,5 kecuali untuk tower crane diberi nilai 2
and pile equipment rated 1.5 and scafolding / dan pile equipment diberi nilai 1,5 serta
formwork rated 1. scafolding/formwork diberi nilai 1.
b. Personnel Assessment (maximum value 10 and b. Penilaian personil (nilai maksimum 10 dan
minimum 5) minimum 5)
Experts and Skilled Workers are provided must be Tenaga Ahli dan Tenaga Terampil yang disediakan
accompanied by Certificates of Expertise (SKA) and harus disertai Sertifikat Keahlian (SKA) dan Sertifikat
the Skills Certificate (SKT) and other supporting Ketrampilan (SKT) dan dokumen pendukung lainnya
documents which include labor personnel as follows: yang meliputi tenaga personil sebagai berikut:
(1) Project Manager (one person value of 2) (1) Pemimpin proyek (satu orang nilai 2)
(2) Architecture expert or architeture engineer (2) Ahli Arsitektur atau pelaksana ahli arsitektur (2
(2 person value 1/person) orang nilai 1 untuk 1 orang)
(3) Structure Expertor structural engineer (2 person (3) Ahli Struktur atau pelaksana ahli struktur
value 1/ person) (2 orang nilai 1 untuk 1 orang)
(4) Mechanical Expert or mechanical engineer (4) Ahli Mekanikal atau pelaksana ahli mekanikal (1
(1 person value of 1) orang nilai 1)
(5) Electrical Expert or electrical engineer (1 person (5) Ahli Elektrikal atau pelaksana ahli elektrikal (1
value of 1) orang nilai 1)
(6) Landscape Expert or landscape engineer (1 (6) Ahli Landskap atau pelaksana ahli lansdkap (1
person value of 1) orang nilai 1)
(7) Geodetic Engineer (7) Ahli Teknik Geodesi
53
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
(8) Geotechnic Specialist (8) Spesialis Geoteknik
(9) Cost and Quantity Surveyor (9) Penghitung Kuantitas dan Biaya
(10) Contract/Project Administration (1 person) (10) Tenaga Ahli Administrasi Kontrak/Proyek (1
(11) Financial Administration Expert (1 person) orang)
(12) Foreman (6 person) (11) Tenaga Ahli Administrasi Keuangan (1 orang)
(12) Pelaksana Lapangan (6 orang)
Multiplier for the valuation of each personnel is multiplied Faktor pengali untuk penilaiannya setiap personil adalah
by a factor of value for any personnel in the evaluation jumlah faktor dikalikan dengan nilai untuk setiap personil
(value = Total multiplication factor x value for personnel). yang di evaluasi (nilai = Jumlah perkalian faktor x nilai
The assessment of factors as follows: untuk personil) . Adapun faktor penilaiannya sebagai
berikut:
Personnel Assessment Criteria for Manager Project Kriteria Penilaian Personil untuk Pemimpin Proyek
and experts or engineer and skilled personnel or dan Tenaga Ahli atau Enjiner dan tenaga trampil atau
foreman: pelaksana lapangan:
(a) Certificate of Expertise or skills (F1) (a) Sertifikat Keahlian atau ketrampilan (F1)
Have a Certificate of Expertise (SKA or SKT Memiliki Sertifikat Keahlian (SKA atau SKT
minimum intermediate experts) rated 100 minimum ahli madya) diberi nilai 100
Have a Certificate of Expertise (SKA or Memiliki Sertifikat Keahlian (SKA atau SKT
SKTbasic experts) rated 70 Pratama) diberi nilai 70
Not having given the value 0 Tidak memiliki diberi nilai 0
(b) Pengalaman (F2)
(b) Experience (F2) Pengalaman > 12 tahun (nilai 100)
Experience> 12 years (rate 100) Pengalaman 10 sampai 12 tahun (nilai 90
Experience 10 to 12 years (rate 90 Pengalaman 5 sampai 10 tahun (nilai 50)
Experience 5 to 10 years (rate 50) Pengalaman kurang dari 5 tahun
Experience less than 5 years rate 0 (c) Latar Belakang Pendidikan (F3)
(c) Educational Background (F3)
S1; S2 dan S3 Teknik yang sesuai dengan
S1: S2 and S3 Techniques accordance with their bidangnya (nilai 100)
field engineering(rate 100)
S1; S2 dan S3 Non-Teknik (nilai 90)
S1: S2 and S3 Non-Technical (rate 90)
Diploma Teknik dan lainnya (nilai 50)
Diploma in Engineering and other (rate0)
(d) English Language Proficiency (F4)
(d) Kemampuan Bahasa Inggris (F4)
Very good (rate 100)
Good (rate 85) Sangat baik (nilai 100)
average (rate 70) Baik (nilai 85)
poor (rate 50) rata-rata (nilai 70)
Jelek (nilai 50)
(e) Completed Tax (F5) (e) Kelengkapan Pajak (F5)
Having a tax ID (rate 100) Memiliki NPWP (nilai 100)
Not having (rate 0) Tidak memiliki (nilai 0)
Foreman or skilled personnel for the educational Faktor Latar belakang pendidikan untuk pelaksana
background (F3) factors are as follows: lapangan (F3) adalah sebagai berikut:
S1 in engineeringaccordance with their field S1 Teknik yang sesuai dengan bidangnya (nilai
engineering(rate 100) 100)
Diploma in Engineering and others (rate90) Diploma Teknik dan lainnya (nilai 90)
Others rate 0 Lainnya nilai 0
For administration staff does not require a certificate (F1 Untuk tenaga administrasi tidak memerlukan sertifikat
rated 100) keahlian (F1 diberi nilai 100)
c. Management certificated and others c. Penilaian sertifikat manajemen mutu dan lainnya
Assessment (maximum value 5 and minimum (nilai maksimum 5 dan minimum 2.5)
2.5) (1) Badan Usaha yang telah memiliki sertifikat
(1) The firm having of Quality Management manajemen mutu (ISO 9001) mendapat nilai 2
certificated (ISO 9001) rate 2 and uncertificated dan tidak memiliki diberi nilai 0;
0; (2) Memiliki Sertifikat Manajemen Kesehatan dan
(2) Having a Occupational Health and Safety Keselamatan Kerja (SMK3) diberi nilai 2 tidak
Management System Certificate (OHSAS- ada 0;
54
Short Listing / Pre-Qualification Document
Civil Work
The Development of Medical Education and Research Center and Two University Hospitals Project
IDB Loan –IND-137
25001), rate 2 and uncerttificated 0; (3) Memiliki sertifikat untuk Pelaksanaan
(3) Having certificated of Good corporate perusahaan sehat (GCG) diberi nilai 1 tidak ada
governance (GCG), rate 1 and uncerttificated 0; diberi nilai 0.
If the total value of the Assessment of technical Bila total nilai kemampuan teknis perusahaan yang
capability gained less than 15, that thefirms diperoleh kurang dari 15, maka perusahaan yang
disqualified / fail qualification. bersangkutan gugur/tidak lulus kualifikasi.
G. For the firm where the PASS of Passing Grade, G. Bagi penyedia jasa yang memenuhi nilai ambang
should be assasment of residual capability of the lulus, masih harus dilakukan penilaian terhadap
package with the assaement is follows; kemampuan untuk melaksanakan paket pekerjaan
dengan menilai Sisa Kemampuan Paket.
Residual capability of package (SKP) Sisa Kemampuan Paket (SKP)
For big Business service providers KP = 8 or 1,2 N Untuk penyedia jasa Usaha Besar KP = 8 atau KP =
1,2 N
SKP = KP – (total number on going package) SKP = KP – (jumlah paket yang sedang dikerjakan)
dimana:
N = the maximum total number of package at the N = jumlah paket pekerjaan terbanyak yang dapat
same time in last 5 (five) years ditangani pada saat yang bersamaan selama
kurun waktu 5 (lima) tahun terakhir.
KP = capability of package KP = kemampuan menangani paket pekerjaan
if the assessment of package capability gained 1 or Jika sisa kemampuan paket yang diperoleh sama
more, that thefirmsPASS dengan 1 atau lebih, maka dinyatakan LULUS.
if the integrity pact not signed and seal stamp by firm, Jika format pakta integritas tidak dibubuhi tandatangan
the assesment is FAIL. dan distempel perusahaan maka dinyatakan GUGUR.
55