You are on page 1of 1

TOILET

12.50 11.50
2.50 5.00 2.50 2.50
OFFICE

UP F

DN
CLASS ROOM
FIRE
M
EXIT
2.50

A
7.00

PROPOSED CSE
(CENTRAL STATION)
7.00

ROOM 228
PROPOSED
CLASSROOM

DEAN`S OFFICE
6.07

B
7.00

PROPOSED ECE LAB


ROOM 226
INSTRUMENTATION DEAN`S OFFICE
7.00

UP LAB

PROPOSED
CLASSROOM
7.00

T
PROPOSED
9.98

PROPOSED HALLWAY

FILING ROOM
COMPUTER LAB
7.00

PANTRY
2.50

OFFICE
ASST.
PROPOSED ECE LAB
MALE TOILET FEMALE TOILET HEAD HEAD
UP DN
D
1.50 1.50

F
3.00

UP

M 2.50 2.00 7.50 2.00


7.00

HR STAFF

FILE
PROPOSED HR HEAD SCHL.
9.00

CLASSROOM STUDENT'S
HRD OFFICE ROOM RECEPTION
AREA LABORATORY
VPA'S OFFICE
7.00

ADMIN.
FILE
TOILET
JONELTA COM 11 12
OFFICE

3.51 3.51 2.00 5.00 7.80


PROPOSED
9.00

UP
CLASSROOM PROP.
7.00

OFFICE
DN
LABORATORY
3.25 2.50
G
9.00
2.50 2.50
3.00

PANTRY

2.50 7.50 5.00 COMPUTER LAB

SECOND FLOOR PLAN


1:200
SCALE MTS

COMPUTER LABORATORY

COMPUTER LABORATORY
ARCHITECT R.A. 9266 SEC. 33 ENGINEER PROJECT TITLE APPROVED REVISION SHEET CONTENTS SHEET NUMBER

DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT


DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
PROPOSED UPHSL COLLEGE GEN. ANTONIO L. TAMAYO
DATE
1
GARCIA, EZEKIEL A. INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR DATE
WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE BUILDING EXTENSION
PRC NO. PTR NO.
UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES
PRC NO. PTR NO.
A 6
OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR DATE
OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY
VALIDITY DATE OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF THE VALIDITY DATE
ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS. LOCATION: BGY. STO. NIÑO HIGHWAY, BIÑAN LAGUNA CHAIRMAN OF THE BOARD, CEO DATE DATE: NOVEMBER 2022
TIN PLACE TIN PLACE

You might also like