You are on page 1of 1

COMPOSTING SILO

(50CM)

+2.00
N
+2.00

W
IN
D
+1.00

+1.00
BATROOM BATHROOM
VEGETABLE ARE
A(5 M2) CLOTHING AREA
WC
-0.50
KITCHEN
-0.50
BEDROOMI
TERRACE BEDROOM

DEPOT FOR
KITCHEN
-0.50
ENTRANCE
+0.50

SALOONI

DEPOT GEOWALL(50CM)
+0.50 FOR
+0.50
ECOLOCICAL
+0.00
MATERİALS SOLAR PANELS
+0.00
WORKING SPACE

+0.50

WINTER GARDEN TERRACE


+0.50 +0.50

GARAGE
WITH SOLAR PAN
EL AND
HEATİNG UNDERG SOLAR POOL
ROUND
GAZEBO(5 M2)

SUNDİAL GREENHOUSE (4
GAZEBO(5 M2) M2)
-1.00

-1.00

1.FLOOR PLAN 2.FLOOR PLAN

DETAIL
FOR
COMPOSTA
COMPOSTA
TUVBO VENTILADOR
HOYO COMPOSTA ESPECIFICACIONES
TAPA
0.6
*BACIAR LA BASURA EN EL HOYO LAMINA GALVANIZADA
*TAPAR CON UNA PALADA DE TIERRA, PREFORRADA O MALLA
0.6
METALICA
LINEA DE TIERRA *MANTENER HUMEDA LA COMPOSTA
*HACER UN0A AGUJEROS DENTRO DE LA COMPOSTA ANILLO CONTELA
METALICA
5 CM DE TIERRA *UNA VEZ LLENA LA COMPOSTA DEBE VACIARSE
TAMBO DE 200 LTS
AGUJEROS *LOS 20 CM DE LA PARTE SUPERIOR
1
CAPAS DE TIERRA DE LA COMPOSTA NO SE UTILIZAN
PUERTA

BASURA ORGANICA

SOLAR POOL

COMPOSTING SILO
(R=105 cm) SUNDIAL
GAZEBO

GAZEBO

toprak katmanı

EAST ELEVATION
SOUTH ELEVATION
NORTH ELEVATION
WEST ELEVATION

ELEVATIONS ELEVATIONS

DETAIL FOR GREEN ROOF

WIND TURBİNE(R=150 CM )

WIND TURBİNE(R=150 CM )

COMPOSTING SILO
SOLAR PANEL

VEGETABLE AREA

STONE

GROBETON 10 cm
BLOKAJ 15 cm

TOPRAK DOLGU

AA SECTION BB SECTION

SECTIONS

You might also like