You are on page 1of 1

0.

70
38.00
2.50 5.00 2.50 2.50 2.50 6.50 2.50 2.50 9.50 2.00

PROPOSED
HALLWAY EXHIBIT ROOM
3.50

DN

FIRE
EXIT
2.50

HALLWAY

A PROPOSED
LABORATORY
7.00

CLASSROOM
EXHIBIT ROOM
7.00

EXHIBIT ROOM
B PROPOSED
EXHIBIT ROOM
7.00

PROPOSED
7.00

CLASSROOM

CLASSROOM

C
7.00

PROPOSED
7.00

CLASSROOM CLASSROOM
PROPOSED
2.50

OFFICE
UP DN MALE TOILET FEMALE TOILET
D
3.00

E
7.00
4.00

CLASSROOM
CLASSROOM
9.00

CLASSROOM CLASSROOM
Area = 80.50 SQ.M. Area = 80.50 SQ.M.
5.00
7.00

F
CLASS ROOM
2.00

CLASSROOM

7.00 7.00
9.00

7.00

CLASSROOM

PROP.
DN
OFFICE

G
3.00

6.50 2.50
2.50 9.00
11.50
2.50 7.50 5.00

PROPOSED
LABORATORY

FOURTH FLOOR PLAN


1:200
SCALE MTS

ARCHITECT R.A. 9266 SEC. 33 ENGINEER PROJECT TITLE APPROVED REVISION SHEET CONTENTS SHEET NUMBER

GARCIA, EZEKIEL A.
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT
DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL PROPERTY PROPOSED UPHSL COLLEGE GEN. ANTONIO L. TAMAYO
DATE
1
AND DOCUMENTS OF THE ARCHITECT, WHETHER THE OBJECT FOR DATE
WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE BUILDING EXTENSION
PRC NO. PTR NO.
UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES
PRC NO. PTR NO.
A 8
OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND FOR DATE
OTHER PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY
VALIDITY DATE OR IN WHOLE, WITHOUT THE WRITTEN CONSENT OF THE VALIDITY DATE
ARCHITECT OR AUTHOR OF THE SAID DOCUMENTS. LOCATION: BGY. STO. NIÑO HIGHWAY, BIÑAN LAGUNA CHAIRMAN OF THE BOARD, CEO DATE DATE: NOVEMBER 2022
TIN PLACE TIN PLACE

You might also like