TABLE OF CONTENT
NO. SHEET NAME SHEET NO.
1 COVER PAGE 0
2 ODU PAD DETAILS S1
3 ODU PAD FOUNDATION DETAILS S2 SITE INFO
4 ELECTRICAL LAYOUT E1
5 EQUIPMENT ROOM ELECTRICAL LAYOUT E2
6 TRENCHING DETAILS E3 OWNER NAME: MANILA WATER (MWSI)
7 HANDHOLE DETAILS E4 OWNER CONTACT NUMBER: -
8 TEST PIT DETAILS E5
SITE ACCESS PROCEDURE: -
9 OUTDOOR PANEL DETAILS E6
SITE ADDRESS: MANILA WATER, ANTIPOLO CITY, RIZAL
10 SCHEDULE OF LOADS E7
11 SINGLE LINE DIAGRAM E8
BUILDING HEIGHT/STOREY: GREENFIELD
WIND SPEED: 280KPH
AREA TYPE: -
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT COVER PAGE & DATE: A
INTEGRATION PACKAGE 7 TABLE OF CONTENT REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 0
B PLAN VIEW
S 1 SCALE 1:10
A PERSPECTIVE VIEW
S 1 SCALE NTS
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. ODU PAD DETAILS DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT 2. OUTDOOR PANEL DETAILS DATE:
REVISION NO.:
S
INTEGRATION PACKAGE 7 AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 1
B C
2 1
A UP A
B C
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. ODU PAD FOUNDATION DETAILS DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DATE:
REVISION NO.:
S
INTEGRATION PACKAGE 7 AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 2
W
3
DN
LABORATOR O ICE
O ICE
N
P
ALLWA
UP
IRE IRE
E IT E IT
MALE EMALE
UP TOILET
P
CONTROL ROOM W TOILET
RAISED LOORING MEETING O ICE
CON ERENCE
ROOM
UP
PA RE MP
D TE
N PU
C EL
C
FU
O
P
MALE TOILET
ELE 1 2 M
TOILET
ELE 1 2 M
O ICE
ELE 1 3 M
TRENC DRAIN W CO ER
NLOADING BA
3 M
P
RAMP
1
ELE
LOADING
3
TO DITC
P
SLOPE
AR-08
S BMERSIBLE MI ER
ELE 1 32
S MP
PIT
BASE O
ANTI AMMER
TREATED WATER P MP ROOM S STEM
ELEV+153.20
2% SLOPE
D
1
12% SLOPE
RAMP
P
WASTEWATER TANK
1 1
1 31 M
CATWALK LINE ABO E
PE
ELE
SLO
BACKWAS
3%
3%
PE
PE
SLO
SLO
SPLITTING C AMBER
COL MN
WASTEWATER P MP
BASE O BACKWAS
ELE 1 1
3
2
ELEV+153.00
3
ELE
M
1
1
S BMERSIBLE MI ER
1 3 32
S BMERSIBLE MI ER
1 32
ELE
ELE
CATWALK LINE ABO E
M
ER TANK
ELEV+153.20
1 1
ELEV+153.00
2
ELE
ELE
3
ELE
SL DGE B
LI TING P MP
BASE O SL DGE
ELE 1 1
3%
E
PE
LOP
SLO
S
M
ER TANK
TO SL DGE
B
1
COAG LATION TANK
ELE
RA T
SLOPE SLOPE
1
1
P
LOCC LATOR SETTLING TANK
1
1
LINE O
12% RAMP P
ROO
W W
DRAINAGE PIT D D
1 1
2 2 P
P
ELE 1 2 1
C A B L E T R E N C
CONCRETE PAD
FUEL PUMP
S PERNATANT PIPE UP S PERNATANT PIPE
LINE O SLAB OPENING ABO E
GENERATOR ROOM
ELE 1 3 M
PLAT ORM LINE ABO E
P
CABLE PIT
ELE 1
BELOW MCC ROOM
SL SL
O
PE PE O
PE
O
SL ELE 1 3 M
T ICKENER B
LEGEND
EMBEDED LINE O SLAB OPENING ABO E
STEEL PLATES
OLE OR
SENSOR
DIESEL GENSET
12 KWA
A ELECTRICAL LAYOUT
SCALE 1:275
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
1. ELECTRICAL LAYOUT DESIGN BY:
PROPOSED F.O.C. /
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT
DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 1
A
12% RAMP P
P
DN
D
1
GENERATOR ROOM
ELE 1 3 M
CABLE PIT
POWER STATION & MV +
BELOW MCC ROOM
GENERATOR ROOM
ELE 1 3 M
DIESEL GENSET
12 KWA
UP
EQUIPMENT ROOM ELECTRICAL LAYOUT D C.O. UNDER TOWER TAPPING POINT DETAILS
A SCALE 1:75
SCALE 1:75
C SECTION B-B
SCALE 1:75
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
DESIGN BY:
PROPOSED F.O.C. / 1. EQUIPMENT ROOM ELECTRICAL
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT
LAYOUT & SECTION
2. C.O. UNDER TOWER TAPPING POINT
DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP
3. PIPE HANGER SUPPORT DETAILS SCALE: AS SHOWN 2
B ELEVATION VIEW
SCALE 1:15
A PERSPECTIVE VIEW
SCALE NTS
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. TRENCHING LAYOUT DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 3
B
A A
A ISOMETRIC
SCALE : NTS
ISOMETRIC
D SECTION B-B
SCALE : 1:5 MTS
E HANDHOLE COVER DETAILS
SCALE : NTS
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. HANDHOLE LAYOUT DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 4
NGL
12MMØ ROUND
6MM THK GALVANIZED
700 BAR 550MM GALV.
CHECKERED STEEL PLATE
600
WITH LOCK
50 50 500 50 50
HINGED
50
100
50
MORTAR
100MM THK
250
SOLDERLESS
CONNECTOR 50MM SQ. HDG
100
SOLDERLESS
CONNECTOR
700
500
50
20mmØ x 3M
500
6MM THICK COPPER CLADED
CHECKERED GROUND ROD
TO ODU PAD
PLATE
BURIED GROUND ROD
50
SCALE: NTS
4" CHB
50sq HDG
10
50
50
50
GROUND ROD
100 500 100
600
ANGLE BAR
100MM THK
MORTAR
SOLDERLESS
CONNECTOR
HINGE
50MM SQ. HDG
TEST PIT FRAMING
50MM x 50MM x 6MM THK
12mmØ ROUND
CL ANGLE BAR
20mmØ x 3M BAR 550mm GALV.
COPPER CLADED 6MM THK
GROUND ROD CHECKERED (FRONT ELEVATION)
2-16mmØ THROUGH
PLATE GROUND TEST PIT COVER DETAIL
12MMØ GALVANIZED
TO ODU PAD ROUND BAR
150
TO ODU PAD
6mm THK x 50mm
x 200mm FLAT BAR 6MM THK
6
80
CHECKERED
SECTION (ISOMETRIC) PLATE
(ISOMETRIC)
FULLWELDED
EXOTHERMIC GROUND TEST PIT COVER DETAILS 200MM x 50MM x 6MM
CONNECTION DETAIL FLAT BAR
TEST PIT
COVER HANDLE
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. GROUNDING TEST PIT DETAILS DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 5
TOP VIEW
FRONT VIEW
ISOMETRIC
(ASSEMBLY)
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. PROPOSED EQUIPMENT CABINET DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DETAILS DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 6
GENERAL NOTES ON ELECTRICAL INSTALLATION:
ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE
WITH MWCI SPECIFICATIONS, THE LATEST EDITION OF THE PHILIPPINES ELECTRICAL CODE.
THE RULES AND REGULATIONS OF THE LOCAL MUNICIPALITY AND THE REQUIREMENTS OF
THE LOCAL POWER UTILITY COMPANY.
WIRING METHOD:
a. ALL CONDUITS BURIED OR ENCASED IN CONCRETE SHALL BE SCHEDULE 40 PVC OR EQUIVALENT,
WHERE CONDUIT EMERGES FROM CONCRETE ENCASEMENT, PVC COATED RSC ELBOW SHALL E UTILIZED
FOR TRANSITION FROM THE CONCRETE.
b. INTERMEDIATE METAL CONDUIT (IMC) SHALL BE USED FOR SERVICE ENTRANCE,
FEEDERS, BRANCH CIRCUITS AND ALL EXPOSED PORTIONS.
c. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS SHALL BE PROPERLY GROUNDED.
WIRING MATERIAL:
a. WIRES AND CABLE CONDUCTOR SIZES ARE DESIGNATED IN SQURE MILLIMETERS, CONDUCTOR SHALL BE COPPER.
PROPOSED 20AT ECB
b. WIRES SHALL BE INSULATEDFOR 600 V AC TYPE THHN, UNLESS OTHERWISE INDICATED. WITH C.O. PROPOSED
c. GROUNDING WIRES SHALL GREEN INSULATED TYPE THW OR PVC. WEATHERPROOF 20AT ECB
d. MAINS CABLE SHALL BETHHN SINGLE CORE STRANDED COPPER CABLES AT 90deg C TEMPERATURE RATING MIN.
(UNLESS OTHERWISE SPECIFIED OR APPROVED BY MWCI)
e. ALL WIRE MATERIAL SHALL BE BRAND/TYPE APPROVED BY MWCI. TAPPING
4. PANELS AND WIRING DEVICES POINT
a. AT EVERY TERMINATION THE WIRE SHALL HAVE A CRIMPED CONNECTION, NO SOLDERED OR BARE WIRES SHALL BE USED AS TERMINATION.
b. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT.
c. ALL PANELS AND WIRING DEVICES SHALL BE BRAND APPROVED BY MWCI.
d. THE PANEL BOARD ENCLOSURES SHALL BE OF NEMA TYPE 65m CABLE TRENCH
5. GROUNDING RESISTANCE FOR POWER AND COMMUNICATION EQUIPMENT MUST BE AT LEAST 5 OHMS OR LESS (AS RECOMMENDED BY IEEE).
6. ALL ELECTRICAL WORKS HEREIN SHALL BE CARRIED OUT BY REGISTERED MASTER ELECTRICIANIN STRICT ACCORDANCE OF PEC PART1 AND
PART2INCLUDING AMENDMENTS AND RULINGS AND SHALL BE DIRECTLY SUPERVISED BY A REGISTERED ELECTRICAL ENGINEER
A SCHEDULE OF LOADS
SCALE NTS
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. SCHEDULE OF LOADS DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT 2. RISER DIAGRAM FOR POWER DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 7
UPS EQUIPMENT ROOM
OUTDOOR CABINET
I=9.56
TAPPING
POINT
UPS
2ND FLOOR
RISER DIAGRAM
CONTRACTOR: DESIGNER: CUSTOMER NAME: PROJECT NAME: DRAWING TITLE: SHEET NAME: DRAWN BY: SHEET NO.:
PROPOSED F.O.C. / 1. LOAD COMPUTATION & RISER DESIGN BY:
PROFESSIONAL ENGINEER
CALAWIS – MTCL SYSTEM ELECTRICAL CABLE LAYOUT DIAGRAM DATE: E
INTEGRATION PACKAGE 7 REVISION NO.:
AND DETAILS
PRC NO.:
PTR NO.:
ISSUED ON:
ISSUED AT:
CARE IN EVERY DROP
FOR CALAWIS WTP SCALE: AS SHOWN 8