You are on page 1of 18

R

CLOCK SPRING

Leak Stop
The Fast, Economical Solution for Low
Pressure Pipeline Repair
CLOCK SPRING
R

Proven better, time after time

Composite repair for


leaking pipelines
30 minute repair
Contains pressures up
to 70 Bar
Holes in excess of 1”
diameter
Minimum 20 year
lifespan
CLOCK SPRING
R

Proven better, time after time

1. Patented, high-strength,
unidirectional split sleeve
composite structure.
2. Patented, fast curing, high
performance two-part adhesive
system.
3. Extremely high compressive
strength, proprietary load
transferring component.
Once installed, the three
elements bond together to form
extraordinarily strong and
durable repair.
Installation Procedure
Step 1 of 8

Locate the hole and ‘plug’ to reduce/stop any


flow. Prepare the pipe surface.
Installation Procedure
Step 2 of 8

Thoroughly mix the 2-part Metalplastic.


Installation Procedure
Step 3 of 8

Using a metal plate, clamp the Metalplastic over


the hole and leave to cure for 15-20 minutes.
Installation Procedure
Step 4 of 8

Thoroughly mix the two component filler and


adhesive.
Installation Procedure
Step 5 of 8

Apply filler material over the metal plate and


adhesive onto pipe surface.
Installation Procedure
Step 6 of 8

Snap on first layer and apply adhesive.


Installation Procedure
Step 7 of 8

Apply adhesive between each layer. On


completion, apply tightening straps.
Installation Procedure
Step 8 of 8

Tighten and leave to cure (<2 hours).


Installation completed within 30 mins.
CLOCK SPRING
R

Proven better, time after time

4” repair made on
Hydrocarbon line in
Tank Farm – hole
diameter approx ¼”.
CLOCK SPRING
R

Proven better, time after time

Leak repaired in
support location on
an 8” Flare line – 2
holes of ¼” diameter
approx ½” apart.
CLOCK SPRING
R

Proven better, time after time

Multiple leak
repairs made on
large diameter
(42”) water line.
CLOCK SPRING
R

Proven better, time after time

Test spools with


25mm diameter
defect – pressure
contained was 100
Bar!!!
CLOCK SPRING
R

Proven better, time after time

Benefits
No heavy or specialized installation / lifting equipment
required
No skilled labor required
No hot work & welding
Installation can be as quick as 30 minutes
Complete cure within two hours
Future corrosion growth is completely prevented
Completely environmentally friendly and benign, when
installed
CLOCK SPRING
R

Proven better, time after time

Areas of use

Tank farms
Jetties
Refineries
Process plants
Offshore
Water lines
Hydrocarbon lines
CLOCK SPRING
R

Proven better, time after time

For further information, please


contact:
Clock Spring Company, L.P.
4A The Causeway
Godmanchester
Huntingdon PE29 2HA
Tel: +44 1480 414 703
Fax: +44 1480 414 705
sales@clockspringuk.com

You might also like