CLOCK SPRING
Snap Wrap
The Fast, Economical Solution for Low
Pressure Pipeline Repair
CLOCK SPRING
R
Split sleeve,
composite repair for
low-pressure (34
Bar) pipelines with
severe corrosion (up
to 90% wall loss)
defects.
CLOCK SPRING
R
1. Patented, high-strength,
unidirectional split sleeve
composite structure.
2. Patented, fast curing, high
performance two-part adhesive
system.
3. Extremely high compressive
strength, proprietary load
transferring component.
Once installed, the three
elements bond together to form
extraordinarily strong and
durable repair.
Installation Procedure
Step 1 of 6
Single handed
installation in pipe
support location
with severe (up to
90%) wall loss.
CLOCK SPRING
R
6” repair made on
Oxygen line with
severe corrosion at
ground level.
CLOCK SPRING
R
Repair made on
same Oxygen line
with under-lagging
corrosion – no hot
work was required.
CLOCK SPRING
R
Benefits
No heavy or specialized installation / lifting equipment
required
No skilled labor required
No hot work & welding
No need to interrupt the pipeline operation or flow
Installation can be as quick as 15 minutes
Complete cure within two hours
Future corrosion growth is completely prevented
Completely environmentally friendly and benign, when
installed
CLOCK SPRING
R
Areas of use
Tank farms
Jetties
Refineries
Process plants
Bridge crossings
Offshore