Kill Water Line 3
Kill Water Line 3
Page 6 of 57
Table 5.7 Q4 Hydraulic Calculation Summary (continue)
With Fire Water Case Without Fire Water Case
Node Pressure Temperature Flowrate Pressure Temperature Flowrate
(Psig) (oF) (GPM) (Psig) (oF) (GPM)
6G-0504A 367.14 86.16 126.00 383.99 86.13 126.00
5G-0405A 367.06 86.16 126.00 383.91 86.13 126.00
5G-0602A 372.02 86.15 126.00 388.87 86.12 126.00
6G-0603A 370.43 86.16 126.00 387.28 86.12 126.00
6G-0604A 369.68 86.16 126.00 386.54 86.12 126.00
6G-0605A 369.52 86.15 126.00 386.38 86.12 126.00
2. Kill water network line detail complete with length and size is given in attachment-
2
3. Line sizing summary for kill water network for all quadrant (Q2, Q4, and Q5) is
given in attachment-5.
8.0 CONCLUSIONS
1. Kill water inlet source pressure at 435.61 Psig is adequate to handle
simultaneously killing eight farthest wells in each region and provide utility water
for each facility.
2. Fire water demand for the farthest facility can be supplied from kill water inlet
source (CGS-10) while keep maintaining pressure and flowrate for killing eight
well simultaneously and supply utility water for each facility.
3. Kill water flowline size at 3” is acceptable to be used in any case.
4. Header size at 6” is acceptable to be used in any case.
Page 7 of 57