Pengolahan Limbah Perusahaan & Sisa Hasil Tambang RAB (Capex)
NO INVESTASI QTY UOM HARGA JUMLAH KETERANGAN
TETAP 1 Investasi Pengembangan Lahan 3 Lot Rp 1,350,000,000 Rp 4,050,000,000 2 Penyempurnaan Perijinan 1 Paket Rp 3,000,000,000 Rp 3,000,000,000 TOTAL Rp 7,050,000,000 MESIN 3 Shaking Table – Gravity 2 Unit Rp 170,000,000 Rp 340,000,000 4 Blast Furnace Modifiyed 1 Unit Rp 215,000,000 Rp 215,000,000 5 Electro Refinering 1 Unit Rp 120,000,000 Rp 120,000,000 6 Induction Furnace 1 Unit Rp 2,000,000,000 Rp 2,000,000,000 7 Magnetic Separator 1 Unit Rp 180,000,000 Rp 180,000,000 8 Hydrogen Generator/O2/O3 1 Unit Rp 125,000,000 Rp 125,000,000 9 Mixer - KBC 1 Paket Rp 200,000,000 Rp 200,000,000 10 Ball Mill - SAG 1 Paket Rp 1,500,000,000 Rp 1,500,000,000 11 Genset Hydrogen 1 Paket Rp 500,000,000 Rp 500,000,000 12 Power Plant Energy 1 Paket Rp 800,000,000 Rp 800,000,000 TOTAL Rp 5,980,000,000 SIPIL & KONSTRUKSI 13 Workshop Kantor dan Bangunan Sipil 1 Unit Rp 3,500,000,000 Rp 3,500,000,000 TOTAL Rp 3,500,000,000 LAB EQUIPMENT 14 Laboratorium dan Alat 2 Set Rp 1,450,000,000 Rp 2,900,000,000 15 Unit R&D 1 Unit Rp 1,100,000,000 Rp 1,100,000,000 16 Unit Pengolahan Amdal 1 Unit Rp 1,000,000,000 Rp 1,000,000,000 TOTAL Rp 5,000,000,000 ALAT TRANSPORTASI 17 Mobil 4x4 2 Unit Rp 600,000,000 Rp 1,200,000,000 18 Dump Truck CDD 4 Unit Rp 300,000,000 Rp 1,200,000,000 19 Mobil Operasional 5 Unit Rp 300,000,000 Rp 1,500,000,000 TOTAL Rp 3,900,000,000 FASOS & FASUM 20 Tempat ibadah 1 Lot Rp 413,000,000 Rp 413,000,000 21 Taktis operasional & koordinasi 1 Lot Rp 300,000,000 Rp 300,000,000 TOTAL Rp 713,000,000 TOTAL INVESTASI (Capex) Rp 26,143,000,000 CV. KENDAGA RADJA MANNIRA Pengolahan Limbah Perusahaan & Sisa Hasil Tambang RAB (Expanse)
NO INVESTASI DAN OPERASIONAL QTY UOM HARGA JUMLAH KETERANGAN
BAHAN 1 Bahan Baku 1000000 Kg Rp 500 Rp 500,000,000 TOTAL Rp 500,000,000 TENAGA KERJA LANGSUNG 2 Operator Mesin 10 Mp Rp 5,000,000 Rp 50,000,000 HKP/L 3 Operator Pemurnian 1 Mp Rp 6,000,000 Rp 6,000,000 HKP/L 4 Operator Semelter 1 Mp Rp 6,000,000 Rp 6,000,000 HKP/L 5 Staff 1 Mp Rp 4,500,000 Rp 4,500,000 ADM 6 Keamanan Lingkungan Pabrik 6 Mp Rp 2,000,000 Rp 12,000,000 Muspika 7 Koord. Keamanan Khusus 1 Mp Rp 3,500,000 Rp 3,500,000 Komandan Dinas 8 Keamanan Khusus 2 Mp Rp 2,500,000 Rp 5,000,000 Petugas Dinas 9 Tenaga Maintenance 5 Mp Rp 4,500,000 Rp 22,500,000 Mekanik Fabrikasi 10 Supervisor 8 Mp Rp 10,000,000 Rp 80,000,000 Skill Advisor 11 Direksi 4 Mp Rp 15,000,000 Rp 60,000,000 Penanggung Jawab Oprasional TOTAL Rp 249,500,000 OVERHEAD PABRIK 12 Energi Listrik 1 paket Rp 400,000,000 Rp 400,000,000 13 Oksidator 1 paket Rp 150,000,000 Rp 150,000,000 14 Health & Safety Environment 1 paket Rp 35,000,000 Rp 35,000,000 15 Biaya Perawatan Mesin 1 paket Rp 45,000,000 Rp 45,000,000 16 Biaya Perawatan Pabrik 1 paket Rp 40,000,000 Rp 40,000,000 17 Biaya Pemasaran 1 paket Rp 50,000,000 Rp 50,000,000 18 EMKL, THC, etc 1 paket Rp 12,000,000 Rp 12,000,000 TOTAL Rp 732,000,000 UMUM DAN ADMINISTRASI 19 Konsumsi dan Staff 1 paket Rp 75,000,000 Rp 75,000,000 20 Administrasi Kantor 1 paket Rp 15,000,000 Rp 15,000,000 21 Komunikasi 1 paket Rp 20,000,000 Rp 20,000,000 22 Perjalanan Dinas 1 paket Rp 30,000,000 Rp 30,000,000 23 Obat-obatan 1 paket Rp 25,000,000 Rp 25,000,000 24 Asuransi 1 paket Rp 25,000,000 Rp 25,000,000 25 Lain-lain 1 paket Rp 250,000,000 Rp 250,000,000 TOTAL Rp 440,000,000 TOTAL BELANJA RUTIN DAN OPERASIONAL (Expanse) Rp 1,921,500,000
TOTAL CAPITAL CAPEX Rp 26,143,000,000
TOTAL OPRASIONAL EXPANSE Rp 1,921,500,000 Rp 28,064,500,000 (dua puluh delapan milyar enam puluh empat juta lima ratus ribu rupiah)