You are on page 1of 5

KARACHI DEVELOPMENT AUTHORITY

OFFICE OF THE EXECUTIVE ENGINEER


ENGINEERING DEPARTMENT,
Room No.CRI509, 5th Floor, Civie Centre Building, Gulshan-c-lqbal, Karachi.
Phone No.99230247-Fax No.99232432
No FE/D/KDA/202.3/ CO
Dated: 30/03/2023
TENDER NOTICE
(SINGLE STAGE TWO ENVELOPE METHOD)

ccording to SPPRA Rule (Amended time to time) the Proposals (technical & Financial separately) in Sealed Covers
Sgle Stage)are invited through News Paper/ SPPRA (PPMS) and KDA Website for the following work, are
invited from eligible inlerested Constructors/
Developers etc.
Sr. Estimated Tender PEC
Bid Money Time
No
Name of Scheme Cost
(Million)
Fee
Allowed Category
(Million) (Rs) Codes
DESIGNING AND DEVELOPMENT OF
SURJANI INDUSTRIALL ZONE PHASE-II AND 24
IMPROVEMENT 6974.390 2% of bid Monthis Category
OF EXISTING
amount
5000/ CA
INFRASTRUCTURE OF SECTOR 8 &9 AT Approx
SURJANI TOWN SCH-41, KDA

TERMSAND CONDITIONS FOR BIDS


I Tender schedule shall be as follow.

SCHEDULE DATE &TIME VENUE


From
Receiving 04-04-2023 Office of the Executive Engineer, Engineering Department Karachi
Application To Development Authority Room No.CR#509, Sth Floor Civic Centre.
Issuance of Tender 19-04-2023 Gulshan-e-lqbal Karachi.
During Office Hours
20-04-2023 Office of the Executive Engineer, Engineering Department Karachi
2. Dropping of Tender till Development Authority Room No.CR#509, 5th Floor Civic Centre,
2.00p.m Gulshan

20-04-2023 Office of the Executive Engineer, Engineering Department Karachi


Development Authority Room No.CR#509, Sth Floor Civic Centre.
3. Opening of Tender at
Gulshan
2:30 p.m

2. In case of any reasons, ifthe tenders are not responded on the above date, the next date ofsubmission and opening
of bids will be 09-05-2023 the tender documents will also be available up to 08-05-2023
3. The bidding documents will be issued to the interested constructors/Developers on submission of written request
on original letterhead from the owner ofthe firm or their authorized representative having a valid special power
of attorney on the stamp paper duly attested by Oath Commissioner and on payment of non-refundable cost of
tender price mentioned against each work, through call deposit/pay order on any scheduled bank in favor of
Karachi Development Authority and biding document can also be downloaded from the SPPRA website
(https://ppms.pprasindh.gov.pk/PPMS/) with tender fee mentioned as above.
4. The bid security in the shape of Bank Guarantee from any scheduled bank in favour of Karachi Development
Authority must be enclosed with tender documents: otherwise the tender will be rejected.
5. The contractors must mention their complete and corret present / postal address in tender documents and quoted
the rates both in words and in figures incomplete/conditional tenders will be not accepted
6. Joint venture shall be allowed up to only 2 Members.
7. If any fake documents are found then the tender is liable rejected/cancelled without any compensation with
penalty as per rules.
8. Canvassing in connection of tenders instrictly prohibited and tenders submitted by the contractors who are
reported to be involved in canvassing will be liable for rejection.
Media CoordinatorA)
Dairy No.. .
**************
Date....0 ......
**************P*****

m ,

U
N KARACHI DEVELOPMENT AUTHORITY
OFFICE OF THE EXECUTIVE ENGINEER

ENGINEERING DEPARTMENT
Roonm No. CR#509. 5" Floor. Civie Centre
Building, Gulslhan-e-lqbal, Karaclhi
Phone No.99230247, Fax No.99232432
No. EE/ED/KDA/2023/
Dated: 3/ 2023

CORRIGENDUM,
Ref# KDA/ADVT-36/2023 INF/KRY/I192/23
Ref# EE/ED/KDA/2023/60 Dated: 30-03-2023
(SINGLESTAGE TWO ENVELOPE METIOD)
According to SPPRA Rule (Amended time to time). the Proposals (technical & Financal separately) in Scalcd
Covers (Single Stage) are invited through News Paper / SPPRA (PPMS) and KDA Website lor the lollowing work,
are invited from eligible interested Constructors/ Developers ele
PEC
Estimated
Sr. Bid Tender Time
Name of Seheme Construction Allowed for
No Cost
Money Fee Category
(Million) (Rs) Development
(Million) Codes
DEVELOPMENT OF SURJANI INDUSTRIAL
Z.ONE PHASE-II AND IMPROVEMENT
OF 6974.390
1% of the
5000/
24 Category
EXISTING INFRASTRUCTURE OF SECTOR 8 | bid Price Months CA
&9ATSURJANI TOWN SCH-41, KDA
TERMSAND CONDITIONS FOR BIDS
Tender schedule shall be as follow
SCHEDULE DATE & TIME VENUE

rom Office of Executive Engineer, Engineering Department


. Receiving of
& 05-04-2023 To Karachi Development Authority Room No.CR#509, 5th Floor
Application
Issuance of Tender 02-05-2023 Civic Centre. Gulshan-e-lqbal Karachi.
During Ottice Hours
03-05-2023 Office of the Iixecutive Engineer. Engineering Department
2. Dropping of Tender till Karachi Development Authority Room No.CR#509, 5th Floor
2.00p.m Civic Centre, Gulshan-e-iqbal Karachi
03-05-2023 Office of the Exeeutive Engineer, Engineering Department
3. Opening of Tender Karachi Development Authority Room No.CR#509, 5th Floor
2:30 p.m Civic Centre, Gulshan-e-lqbal Karachi

2. In case of any reason, if the tenders are not responded on the above date, the next date of submission and
opening of bids will be 18-05-2023 the tender documents will also be available up to l7-05-2023.
The bidding documents will be issued to the interested constructors/Developers on submission of written
request on original letterhead from the owner of the firm or their authorized representative having a valid special
power of attorney on the stamp paper duly attested by Oath Commissioner and on payment of the non-
refundable cost of the tender price mentioned against each work, through call deposit/pay order on any
scheduled bank in favor of Karachi Development Authority and biding document can also be downloaded
from the SPPRA website (https://ppms.pprasindh.gov.pk/PPMS/) with tender fee mentioned as above.
4 The bid security in the shape ofl Bank Guarantee from any scheduled bank in favour of Karachi Development
Authority must be enelosed w ith tender documents: otherw ise the tender will be rejected.
5. The contractors must mention their complete and correct present/postal address in tender documents and quoted
the rates both in words and in figures incomplete/conditional tenders will be not accepted.
6. Joint venture/ Consortium shall be allowed up to only 2 Members.
with
without any compensut
.It any lake documents are found then the tender is liable rejected/cancelled
wn0 c
penalty as per rules. the contractors
and tenders submitted by
in connection of tenders in strictly prohibited
.
Canvassing liable for rejection.
reported to be involved in canvassing will be and will be opened by
the Procurement
schedule up to 2.00 pm constructors/ developers
will be dropped on as per above
.Al the tenders the otfice of the undersigned at 2:30 pm in presence of such bidders,
e , in non-working day due to any
who wish to be present. Government or a
public holiday by the tenders at
0. In case, the date of opening is
declared as a
for submission and
opening of
deemed to be the date
oficial working day shall be
reason the next bid or proposal
the same time.
bids/tenders at any time prior to the acceptance of a
agency may reject all or any from time to time).
.
he procuring
to the relevant provision of SPPRA
Rules 2010 (amended
subject and date.
after the scheduled time
12. Tenders will not be received

13. Eligibility Criterin:E


a. NTN Certificate
financial statement.
b. SRB Registration Certificate. Million as presented in the most recent
shall be PKR 7000 for the last three (3)
Current Net worth of Bidder financial statements
C.
consortium shall submit audited 4000 Million. Other
The Bidder/ each member ofthe minimum net worth
of PKR
of the Consortium shall have a
member million.
years. The lead net worth of
PKR 3000 lead
shall have a minimum 3 years), The
members of the Consortium Audit report (Avg last
of at least 4.1 Billion duly supported PKR 3000 Million. Other
turnover turmover of
d. Average Annual minimum average annual
Consortium shall have a turnover of PKR
1100 million.
Member of the annual
shall have a minimum average
Consortium
members of the in the last 7 years.
least 40 Km ofHighway completed least 1 project of eight (8)
e. Experience of a firm of at (diameter of at least 700mm) on at
Experience of Pressurized HDPE pipeline
f
Kms during the last 10 years Million Cum. (Last 10 Years)
complete 1.0 (one)
have CE
Excavation (Cut) by Fim
must
CE-09, CE-10, CE-11(1),
of specialization codes (CE-01,
g. Rock
relevant field
h. Valid PEC of CA Category
EE-05, EE-06, EE-07 EE-11).
& ISO-
11(vii), EE-02, EE-03, EE-04, for Bidder and any one
member in case Consortium
i. Valid ISO Certification is mandatory
9001:2015, ISO-45001:2018, ISO-14001:2015. Government/Semi-Government

Fim never been blacklisted in any


Affidavit/ Undertaking regarding
Department. Serial No. e to Serial No.i
one member must meet criteria from
k. In the case of a Consortium, any
anlah

EXECUTIMENGINEER
e ENGINEERING/DEPARTMENT, KDA

Published through:
Director Information, KDA
Enclosed a copy with request
to publish on KDA web.

The Director Media,KDA, leading dailies of English, Urdu and Sindhi languages.
With a request publish in at least three widely circulated

SPPRA(PPMS)
https:/ppms.pprasindh.gov.pk/

Copy to: Karachi Development Authority, Karachi.


1. The Chief Engineer (Development), Engineering Department,
2. P.S to Director Authority, Karachi.
General, Karachi Development
3. Office copy.
OFFICE OF THE EXECUTIVE ENGINEER,
ENGINEERING DEPARTMENT
KARACHI DEVELOPMENT AUTHORITY
Room No.CR#511, 5th Floor, Civic
Centre Building, Gulshan-e-lqbal, Karachi.
Phone No.99230247- fax No.99232432
Dated: 03/04/2023
No. EE/ED/KDA/2023/ 63

OF SURJANI INDUSTRIAL ZONE PHASE-I


Dnec: DESIGNING AND DEVELOPMENT INFRASTRUCTURE AT SECTOR 8 &9
AND MPROVEMENT OF EXISTING
SURJANI SCH-41, KDA
the tender of
accorded the approval ofcalling
Ihe Competent Authority has been
all the resources required
for the project are available in
Subjected work through national bidding as
Pakistan.

Exgeuive Engineer
Engineering Department
Karachi Development Authority

Published Through
1. https://ppms.pprasindh.gov.pk/