Professional Documents
Culture Documents
Abadi
Company Profile
About us
Vision
• Become A Good Bridge For All Manufactures and Users
• Become A Harmonious Company For The World and Nature
Mission
• Serve the World and Nature with Good Quality & After Services.
• Design and Supply the World and Nature An Eco Friendly and
Saving System
01 2
About our company
Our Milestone
1997 2011 2018
CV. INDOPRISMA Have Cooperation
Have Cooperation with
Service Company With WWTP Team
Worldwide Company for
& Trading for Part & Machinery Have Experience
Used Machines More 20th Year
4
01
Our Main
Partner
One of the Biggest Textile
Machinery Manufacture in
the World
5
About 300 sets of stenter installed
all over Indonesia
6
7
02
FINE
MECHATRONICS
8
Used by almost all textile factories in Bandung
Indo Pacific, Alenatex, Chandra Tex, Pan Asia Jaya Abadi, etc
9
03
SAMJIN
10
04
SAVECO
ENERGY
11
Tahukah Anda?
12
GOVERNMENT LICENSE &
CERTIFICATE
03 13
SPARING
Our SPARING Solutions & Tools
03 14
SPARING
Mobile Web
Demo for
Real Time
Digital
Monitoring
SPARING
PT. SMM
*click to direct
Desktop Software
03 15
SPARING
SPARING Portofolio
16
Our WWTP
Design
17
OUR CONSTRUCTION
Highlight
Video
WWTP
18
Aerasi menggunakan Aerasi menggunakan
Difuser Oxirator
No Clogging,
Long life time &
Easy Replacement
Sludge always accumulates under Inside of Oxirator has a double structure. This
the outlet line since aeration structure enables vacuuming waste water
holes are facing for upward. containing sludge thanks to its ejector effect.
Accumulating sludge is in
anaerobic condition. It causes
high oxygen consumption
19
Why Choose
Glass Fused To
Steel (GFS) ?
20
Project Reference
Asia
Heineken Plant Wasteware
Treatment – East Timor
04 21
Wastewater Treatment Plant
Project Reference
Africa
Textile Industry Wastewater
Treatment Project - Ethiopia
Project Details :
23 Tanks for 3 textile industrial parks WWTP
1 set of tank: 8.41*4.2m
2 set of tank: 6.88*3.6m
1 set of tank: 13.76*6.0m
2 sets of tank: 28.28*7.2m
5 set of tank: 3.82*3.6m , etc
Installation started since June, 2018
04 22
Wastewater Treatment Plant
ALL IN ONE (GFS)
04 23
Wastewater Treatment Plant
Tahapan Proses Pembuatan
WWTP
1. Menetapkan tujuan dari WWTP → Kapasitas limbah per hari, sistem
pengolahan yang dipilih (kimia, biologi, atau fisika)
04 24
Wastewater Treatment Plant
Tahapan Proses Pembuatan
WWTP (Cont.)
3. Design and Drawing
4. RAB
5. (Jika dibutuhkan) Dibuatkan sistem IPAL Kimia sementara sampai
sistem IPAL yang dirancang selesai dibangun dan beroperasi (perlu
proses jar test dan plan test)
6. Pembuatan/Pengerjaan Proyek Infrastruktur yang dibutuhkan
7. Seeding bakteri dengan cara START SEEDING
8. Commissioning dan Pengamatan
9. Training
10. Operasional dan Maintenance
04 25
Wastewater Treatment Plant
Thanks!
Do you have any questions?
indoharmonis@gmail.com
sales.gmacindonesia@gmail.com
(022) 522 5061 / 520 2465
www.iha.co.id